YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Automatic Planning for Cable Crane Operations in Concrete Dam Construction

    Source: Journal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 012::page 04024177-1
    Author:
    Hao Wang
    ,
    Qigui Yang
    ,
    Quan Liu
    ,
    Chunju Zhao
    ,
    Wei Zhou
    DOI: 10.1061/JCEMD4.COENG-15107
    Publisher: American Society of Civil Engineers
    Abstract: Cable cranes serve as critical lifting equipment in large-scale construction projects such as dam construction, bridge building, and mining. Particularly in concrete dam construction, cable cranes are the preferred equipment for transporting concrete due to their flexible spatial moving capacity and large-span coverage. However, because of the narrow dam construction site, the intensive and concurrent transportation activities of the cable crane group are proven to cause space conflicts, resulting in low operation efficiency. Effective planning of cable crane operations is conducive to accelerating construction progress, improving the productivity of cable cranes, and ensuring a safe construction scenario. The planning of cable crane operations involves task allocation in collaborative construction (among several cable cranes) and parallel scheduling under complex spatial constraints. This paper develops an automatic planning system for cable crane operations in concrete dam construction that can directly output the optimal transportation plan of cable cranes, requiring only the input of relevant construction parameters. First, a two-sided matching model is proposed to address the task allocation problem among cable cranes. Second, a simulation model for the concrete transportation process of the cable crane group is established to solve the parallel scheduling problem and avoid collisions. Third, an improved ant colony algorithm is proposed that constructs initial solutions based on the two-sided matching model, calculates key construction indicators using the simulation model, and applies a multiobjective decision making method to find the optimal solution. Finally, an actual dam construction case validates the superiority and reliability of this proposed method. Compared with the conventional engineering approaches, the planning results of this proposed method demonstrate a 12% reduction in pouring duration and a 25% enhancement in the utilization balance of cable cranes, effectively increasing productivity and accelerating construction progress.
    • Download: (3.126Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Automatic Planning for Cable Crane Operations in Concrete Dam Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4304149
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorHao Wang
    contributor authorQigui Yang
    contributor authorQuan Liu
    contributor authorChunju Zhao
    contributor authorWei Zhou
    date accessioned2025-04-20T10:10:44Z
    date available2025-04-20T10:10:44Z
    date copyright9/27/2024 12:00:00 AM
    date issued2024
    identifier otherJCEMD4.COENG-15107.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4304149
    description abstractCable cranes serve as critical lifting equipment in large-scale construction projects such as dam construction, bridge building, and mining. Particularly in concrete dam construction, cable cranes are the preferred equipment for transporting concrete due to their flexible spatial moving capacity and large-span coverage. However, because of the narrow dam construction site, the intensive and concurrent transportation activities of the cable crane group are proven to cause space conflicts, resulting in low operation efficiency. Effective planning of cable crane operations is conducive to accelerating construction progress, improving the productivity of cable cranes, and ensuring a safe construction scenario. The planning of cable crane operations involves task allocation in collaborative construction (among several cable cranes) and parallel scheduling under complex spatial constraints. This paper develops an automatic planning system for cable crane operations in concrete dam construction that can directly output the optimal transportation plan of cable cranes, requiring only the input of relevant construction parameters. First, a two-sided matching model is proposed to address the task allocation problem among cable cranes. Second, a simulation model for the concrete transportation process of the cable crane group is established to solve the parallel scheduling problem and avoid collisions. Third, an improved ant colony algorithm is proposed that constructs initial solutions based on the two-sided matching model, calculates key construction indicators using the simulation model, and applies a multiobjective decision making method to find the optimal solution. Finally, an actual dam construction case validates the superiority and reliability of this proposed method. Compared with the conventional engineering approaches, the planning results of this proposed method demonstrate a 12% reduction in pouring duration and a 25% enhancement in the utilization balance of cable cranes, effectively increasing productivity and accelerating construction progress.
    publisherAmerican Society of Civil Engineers
    titleAutomatic Planning for Cable Crane Operations in Concrete Dam Construction
    typeJournal Article
    journal volume150
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-15107
    journal fristpage04024177-1
    journal lastpage04024177-14
    page14
    treeJournal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian