YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Quantifying Project Uncertainties: Leveraging Historical Bid and Change Order Data for Automated Detection of Cost and Schedule Impacts in New Projects

    Source: Journal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 004::page 04025017-1
    Author:
    Rabin Shrestha
    ,
    Taewoo Ko
    ,
    JeeHee Lee
    DOI: 10.1061/JCEMD4.COENG-15689
    Publisher: American Society of Civil Engineers
    Abstract: Unexpected uncertainties often arise during construction project execution, impacting performance measures such as time, budget, scope, and quality. This study addresses these cost and schedule challenges by creating an automated risk management model that utilizes natural language processing (NLP) techniques. NLP techniques are powerful tools that can process and analyze natural language data, allowing us to uncover valuable insights from textual data. This method enables the extraction of meaningful information from bid, contract, and change order documentation. The bidirectional encoder representations from transformers (BERT) model, a widely recognized transformer-based model, transforms words and phrases into numerical representations. After that, cosine similarity is used to assess the similarity between new and old projects. All these techniques allow us to predict potential costs and schedule changes for upcoming projects based on data from past similar projects. The research question of this study is: How can historical bidding and change order documents be utilized to forecast uncertainties in project cost and schedule for new projects? To address this question, the authors proposed an approach using NLP, BERT, and cosine similarity to extract the relevant data from past similar projects to forecast the cost and schedule changes for upcoming new projects, thus providing proactive insights for project management. Using a case study of 113 projects, out of which 20% were set aside for testing, the model achieved an accuracy of 78.30% in forecasting cost changes and 75.0% in forecasting schedule changes, with an overall accuracy of more than 75% in predicting changes. This finding demonstrates the model’s efficacy in anticipating project uncertainties, thus significantly contributing to improved project management. This data-driven approach to managing uncertainties ultimately enhances overall project success and performance by allowing construction professionals to anticipate and address potential risks and variations proactively.
    • Download: (2.217Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Quantifying Project Uncertainties: Leveraging Historical Bid and Change Order Data for Automated Detection of Cost and Schedule Impacts in New Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4303782
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorRabin Shrestha
    contributor authorTaewoo Ko
    contributor authorJeeHee Lee
    date accessioned2025-04-20T09:59:13Z
    date available2025-04-20T09:59:13Z
    date copyright1/28/2025 12:00:00 AM
    date issued2025
    identifier otherJCEMD4.COENG-15689.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4303782
    description abstractUnexpected uncertainties often arise during construction project execution, impacting performance measures such as time, budget, scope, and quality. This study addresses these cost and schedule challenges by creating an automated risk management model that utilizes natural language processing (NLP) techniques. NLP techniques are powerful tools that can process and analyze natural language data, allowing us to uncover valuable insights from textual data. This method enables the extraction of meaningful information from bid, contract, and change order documentation. The bidirectional encoder representations from transformers (BERT) model, a widely recognized transformer-based model, transforms words and phrases into numerical representations. After that, cosine similarity is used to assess the similarity between new and old projects. All these techniques allow us to predict potential costs and schedule changes for upcoming projects based on data from past similar projects. The research question of this study is: How can historical bidding and change order documents be utilized to forecast uncertainties in project cost and schedule for new projects? To address this question, the authors proposed an approach using NLP, BERT, and cosine similarity to extract the relevant data from past similar projects to forecast the cost and schedule changes for upcoming new projects, thus providing proactive insights for project management. Using a case study of 113 projects, out of which 20% were set aside for testing, the model achieved an accuracy of 78.30% in forecasting cost changes and 75.0% in forecasting schedule changes, with an overall accuracy of more than 75% in predicting changes. This finding demonstrates the model’s efficacy in anticipating project uncertainties, thus significantly contributing to improved project management. This data-driven approach to managing uncertainties ultimately enhances overall project success and performance by allowing construction professionals to anticipate and address potential risks and variations proactively.
    publisherAmerican Society of Civil Engineers
    titleQuantifying Project Uncertainties: Leveraging Historical Bid and Change Order Data for Automated Detection of Cost and Schedule Impacts in New Projects
    typeJournal Article
    journal volume151
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-15689
    journal fristpage04025017-1
    journal lastpage04025017-12
    page12
    treeJournal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian