YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Impact of Construction Scheduling Practice on Delay Claim Analysis

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2024:;Volume ( 016 ):;issue: 004::page 04524015-1
    Author:
    Sadat Ahmed Abdela
    ,
    Desalegn Girma Mengistu
    ,
    Dejene Adugna Asfaw
    DOI: 10.1061/JLADAH.LADR-1010
    Publisher: American Society of Civil Engineers
    Abstract: The effectiveness of delay analysis techniques in giving accurate and timely analysis results is determined by scheduling practice performance and the availability of as-built records. To enhance the effectiveness of delay claim analysis, it is imperative to delve into these dimensions. With this perspective, in this study we evaluated the impact of construction scheduling practice and as-built records on delay claim analysis and developed an improvement framework in the context of the Ethiopian construction industry. A questionnaire survey was developed and distributed to construction professionals working in the industry. A factor analysis was performed to identify relevant components of scheduling practice, and multiple regression analysis was conducted to assess the impact of these components and documentation of as-built records on delay claim analysis performance. The findings indicated that the scheduling practice components that impact delay claim analysis are schedule reliability, accuracy in updating schedules, timely communication, documentation of previous schedules and schedule basis, and schedule conciseness. The results of the multiple regression analysis indicated that documentation of as-built records had a greater impact on delay claim analysis performance than the other components of scheduling practice. Considering these findings, we proposed a framework to improve delay claim analysis by improving scheduling practice and the documentation of as-built records. Delay claim analysis is one of the major activities of contract administration practice. Failing to resolve delay claims appropriately results in expensive disputes with a lengthy claims process that may include litigation. It may affect the relationships among the parties involved and may harm their reputations in the process. The effectiveness of delay analysis techniques in giving accurate and timely analysis results is determined by scheduling practice performance and the availability of as-built records. Although scheduling is a major responsibility of the contractor, engagement of other contracting parties is important in enhancing scheduling and as-built recordkeeping practices. The involvement of stakeholders during the development and updating of the schedule helps promote a mutual understanding of schedule data and the construction methodology; hence, delay claim analysts can quickly understand and review claims. The findings show the expected role of stakeholders in improving practice and the effects of scheduling practices and as-built records on delay claim analysis.
    • Download: (1.561Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Impact of Construction Scheduling Practice on Delay Claim Analysis

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4299115
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorSadat Ahmed Abdela
    contributor authorDesalegn Girma Mengistu
    contributor authorDejene Adugna Asfaw
    date accessioned2024-12-24T10:32:31Z
    date available2024-12-24T10:32:31Z
    date copyright11/1/2024 12:00:00 AM
    date issued2024
    identifier otherJLADAH.LADR-1010.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4299115
    description abstractThe effectiveness of delay analysis techniques in giving accurate and timely analysis results is determined by scheduling practice performance and the availability of as-built records. To enhance the effectiveness of delay claim analysis, it is imperative to delve into these dimensions. With this perspective, in this study we evaluated the impact of construction scheduling practice and as-built records on delay claim analysis and developed an improvement framework in the context of the Ethiopian construction industry. A questionnaire survey was developed and distributed to construction professionals working in the industry. A factor analysis was performed to identify relevant components of scheduling practice, and multiple regression analysis was conducted to assess the impact of these components and documentation of as-built records on delay claim analysis performance. The findings indicated that the scheduling practice components that impact delay claim analysis are schedule reliability, accuracy in updating schedules, timely communication, documentation of previous schedules and schedule basis, and schedule conciseness. The results of the multiple regression analysis indicated that documentation of as-built records had a greater impact on delay claim analysis performance than the other components of scheduling practice. Considering these findings, we proposed a framework to improve delay claim analysis by improving scheduling practice and the documentation of as-built records. Delay claim analysis is one of the major activities of contract administration practice. Failing to resolve delay claims appropriately results in expensive disputes with a lengthy claims process that may include litigation. It may affect the relationships among the parties involved and may harm their reputations in the process. The effectiveness of delay analysis techniques in giving accurate and timely analysis results is determined by scheduling practice performance and the availability of as-built records. Although scheduling is a major responsibility of the contractor, engagement of other contracting parties is important in enhancing scheduling and as-built recordkeeping practices. The involvement of stakeholders during the development and updating of the schedule helps promote a mutual understanding of schedule data and the construction methodology; hence, delay claim analysts can quickly understand and review claims. The findings show the expected role of stakeholders in improving practice and the effects of scheduling practices and as-built records on delay claim analysis.
    publisherAmerican Society of Civil Engineers
    titleImpact of Construction Scheduling Practice on Delay Claim Analysis
    typeJournal Article
    journal volume16
    journal issue4
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/JLADAH.LADR-1010
    journal fristpage04524015-1
    journal lastpage04524015-11
    page11
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2024:;Volume ( 016 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian