YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • International Journal of Geomechanics
    • View Item
    •   YE&T Library
    • ASCE
    • International Journal of Geomechanics
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Surface Settlement of Shallow Shield Tunneling: Face Pressure, Tail-Void Grouting Pressure, and Grout Volume

    Source: International Journal of Geomechanics:;2024:;Volume ( 024 ):;issue: 006::page 04024110-1
    Author:
    Taiyi Chen
    ,
    Guangli Xu
    ,
    Ying Cong
    DOI: 10.1061/IJGNAI.GMENG-9011
    Publisher: American Society of Civil Engineers
    Abstract: Surface settlement caused by shallow shield tunneling can occur frequently. Machine variables such as face pressure, tail-void grouting pressure, and grout volume play an essential role in the settlement control of earth pressure balance (EPB) tunnel boring machines (TBMs). Combined with literature review, theoretical derivation, case verification, and numerical simulation, methods were established for adjusting the key parameters, including the face pressure in the plenum chamber, the advance speed of the shield machine, and the rotational speed of the screw conveyor. The grouting volume required to backfill the tail void was calculated according to shield kinematics, a physical model test under high pressure and soil states during excavation,. From the mechanical properties of soil, the function between surface settlement and tail-void grouting pressure based on the Peck formula, stochastic medium theory, and Terzaghi soil arching theory was deduced for the first time. With the increase in grouting pressure, the soil was compressed after the formation of the soil arch, and the process from original settlement to upheaval was also expressed by numerical simulations. In addition, the proposed methods could control the surface settlement effectively and result in more accurate predictions. By comparing the predicted surface settlement to measured data from the Harbin Metro Line 2 project, the adaptability of the proposed methods for the face pressure, tail-void grouting pressure, and grout volume was verified.
    • Download: (3.097Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Surface Settlement of Shallow Shield Tunneling: Face Pressure, Tail-Void Grouting Pressure, and Grout Volume

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4299045
    Collections
    • International Journal of Geomechanics

    Show full item record

    contributor authorTaiyi Chen
    contributor authorGuangli Xu
    contributor authorYing Cong
    date accessioned2024-12-24T10:30:19Z
    date available2024-12-24T10:30:19Z
    date copyright6/1/2024 12:00:00 AM
    date issued2024
    identifier otherIJGNAI.GMENG-9011.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4299045
    description abstractSurface settlement caused by shallow shield tunneling can occur frequently. Machine variables such as face pressure, tail-void grouting pressure, and grout volume play an essential role in the settlement control of earth pressure balance (EPB) tunnel boring machines (TBMs). Combined with literature review, theoretical derivation, case verification, and numerical simulation, methods were established for adjusting the key parameters, including the face pressure in the plenum chamber, the advance speed of the shield machine, and the rotational speed of the screw conveyor. The grouting volume required to backfill the tail void was calculated according to shield kinematics, a physical model test under high pressure and soil states during excavation,. From the mechanical properties of soil, the function between surface settlement and tail-void grouting pressure based on the Peck formula, stochastic medium theory, and Terzaghi soil arching theory was deduced for the first time. With the increase in grouting pressure, the soil was compressed after the formation of the soil arch, and the process from original settlement to upheaval was also expressed by numerical simulations. In addition, the proposed methods could control the surface settlement effectively and result in more accurate predictions. By comparing the predicted surface settlement to measured data from the Harbin Metro Line 2 project, the adaptability of the proposed methods for the face pressure, tail-void grouting pressure, and grout volume was verified.
    publisherAmerican Society of Civil Engineers
    titleSurface Settlement of Shallow Shield Tunneling: Face Pressure, Tail-Void Grouting Pressure, and Grout Volume
    typeJournal Article
    journal volume24
    journal issue6
    journal titleInternational Journal of Geomechanics
    identifier doi10.1061/IJGNAI.GMENG-9011
    journal fristpage04024110-1
    journal lastpage04024110-15
    page15
    treeInternational Journal of Geomechanics:;2024:;Volume ( 024 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian