YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Mixed Reality-Based Approach for Minimizing Time Uncertainty in Prefabrication

    Source: Journal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 011::page 04024147-1
    Author:
    Helamini Sandagomika
    ,
    Ankit Shringi
    ,
    Saeed Reza Mohandes
    ,
    Ahmed Farouk Kineber
    ,
    Milad Bazli
    ,
    Mehrdad Arashpour
    DOI: 10.1061/JCEMD4.COENG-14846
    Publisher: American Society of Civil Engineers
    Abstract: Prefabrication is highly recognized in construction due to its inherent cost efficiency, quality control, and sustainability benefits. However, the presence of uncertainties in prefabrication processes hinders the realization of these advantages, necessitating addressing production time uncertainty. Mixed reality (MR) has demonstrated promising outcomes in mitigating time uncertainties as an immersive visualization and simulation technology in different domains. Therefore, this study investigates the impact of MR-based approaches in prefabrication to reduce time uncertainty. The methodology comprises Discrete event simulation (DES) modeling, correlation analysis, and the development of an MR-based immersive visualization and simulation tool. Following an initial work study to measure standard times, visualizations of 13 processes in the prefabricated panel production were developed in the Unity environment and deployed on the HoloLens 2. Through several work studies before and after MR implementations, the study demonstrated a 10.8% reduction in the total completion times (P99) in correlated production activities. Findings emphasize that MR reduces time uncertainty by providing an immersive, interactive, and dynamic approach, ultimately improving efficiency in prefabrication. The study contributes to existing knowledge by quantifying the impact of MR on completion times and underscores the importance of addressing time uncertainties for sustainable lean prefabrication. The sensitivity analysis results prioritized the reinforcement trade in managerial decision-making, emphasizing the need for MR-based approaches for targeted improvement opportunities. Minimizing scheduling uncertainty is of practical importance in realizing prefabrication benefits. This study emphasizes the practical applications of MR technology in the construction industry, specifically in the prefabrication process. By utilizing the developed MR-based approach as an immersive visualization and simulation tool, construction stakeholders can streamline their operations, reduce uncertainties, and achieve significant benefits. The MR-based approach enables real-time monitoring, analysis, and collaboration among project teams, empowering them to make informed decisions and adapt to dynamic production processes. By quantifying the impact of uncertainties and delays, stakeholders can prioritize MR-based approaches, particularly for skilled trade teams, to optimize resource allocation and improve production efficiency. Further, MR contributes to achieving lean production targets of prefabrication by optimizing resource usage, enhancing values, and reducing waste. The findings emphasize the importance of MR in managerial decision-making, providing insights that enable informed choices to maximize efficiency and productivity. The study demonstrates how MR can revolutionize prefabrication practices, making construction projects more sustainable, cost-effective, and efficient.
    • Download: (2.080Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Mixed Reality-Based Approach for Minimizing Time Uncertainty in Prefabrication

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4298826
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorHelamini Sandagomika
    contributor authorAnkit Shringi
    contributor authorSaeed Reza Mohandes
    contributor authorAhmed Farouk Kineber
    contributor authorMilad Bazli
    contributor authorMehrdad Arashpour
    date accessioned2024-12-24T10:23:20Z
    date available2024-12-24T10:23:20Z
    date copyright11/1/2024 12:00:00 AM
    date issued2024
    identifier otherJCEMD4.COENG-14846.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4298826
    description abstractPrefabrication is highly recognized in construction due to its inherent cost efficiency, quality control, and sustainability benefits. However, the presence of uncertainties in prefabrication processes hinders the realization of these advantages, necessitating addressing production time uncertainty. Mixed reality (MR) has demonstrated promising outcomes in mitigating time uncertainties as an immersive visualization and simulation technology in different domains. Therefore, this study investigates the impact of MR-based approaches in prefabrication to reduce time uncertainty. The methodology comprises Discrete event simulation (DES) modeling, correlation analysis, and the development of an MR-based immersive visualization and simulation tool. Following an initial work study to measure standard times, visualizations of 13 processes in the prefabricated panel production were developed in the Unity environment and deployed on the HoloLens 2. Through several work studies before and after MR implementations, the study demonstrated a 10.8% reduction in the total completion times (P99) in correlated production activities. Findings emphasize that MR reduces time uncertainty by providing an immersive, interactive, and dynamic approach, ultimately improving efficiency in prefabrication. The study contributes to existing knowledge by quantifying the impact of MR on completion times and underscores the importance of addressing time uncertainties for sustainable lean prefabrication. The sensitivity analysis results prioritized the reinforcement trade in managerial decision-making, emphasizing the need for MR-based approaches for targeted improvement opportunities. Minimizing scheduling uncertainty is of practical importance in realizing prefabrication benefits. This study emphasizes the practical applications of MR technology in the construction industry, specifically in the prefabrication process. By utilizing the developed MR-based approach as an immersive visualization and simulation tool, construction stakeholders can streamline their operations, reduce uncertainties, and achieve significant benefits. The MR-based approach enables real-time monitoring, analysis, and collaboration among project teams, empowering them to make informed decisions and adapt to dynamic production processes. By quantifying the impact of uncertainties and delays, stakeholders can prioritize MR-based approaches, particularly for skilled trade teams, to optimize resource allocation and improve production efficiency. Further, MR contributes to achieving lean production targets of prefabrication by optimizing resource usage, enhancing values, and reducing waste. The findings emphasize the importance of MR in managerial decision-making, providing insights that enable informed choices to maximize efficiency and productivity. The study demonstrates how MR can revolutionize prefabrication practices, making construction projects more sustainable, cost-effective, and efficient.
    publisherAmerican Society of Civil Engineers
    titleMixed Reality-Based Approach for Minimizing Time Uncertainty in Prefabrication
    typeJournal Article
    journal volume150
    journal issue11
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-14846
    journal fristpage04024147-1
    journal lastpage04024147-14
    page14
    treeJournal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 011
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian