YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Development of an Integrated Hybrid Risk Assessment System for Construction Disputes during the Preconstruction Phase Using the Delphi Method

    Source: Journal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 007::page 04024068-1
    Author:
    Khalid K. Naji
    ,
    Murat Gunduz
    ,
    Manal M. Mansour
    DOI: 10.1061/JCEMD4.COENG-14492
    Publisher: American Society of Civil Engineers
    Abstract: This paper proposes a hybrid conceptual and performance assessment integrated dispute risk system that enables construction professionals to evaluate, track, and manage construction disputes. It establishes a correlation between dispute-contributing factors and their respective preconstruction stages, facilitating early dispute detection and mitigation before the construction phase. This method can be applied to gauge the effectiveness of the preconstruction phase in relation to its influence on the emergence of disputes. Through an extensive literature review, expert interviews, and the Delphi technique, 48 key risk factors were identified and categorized into four groups. Eighteen experts were selected using purposive sampling, and their survey responses were checked for normality and reliability using the Shapiro–Wilk test and Cronbach’s alpha. The Delphi method was employed to reach a consensus among the panelists after two rounds of evaluation, using the nonparametric statistical parameters, such as Kendall’s coefficient of concordance and chi-squared. Subsequently, the interrater agreement (IRA) was measured, and the dispute factors were ranked. Based on the ranking results, a novel integrated hybrid system was formulated that synergistically combines a hybrid conceptual and performance assessment framework with a fuzzy logic–structural equation model (SEM). The proposed hybrid system includes two key components: a unique conceptual and performance assessment framework and a hybrid model that combines fuzzy logic and SEM. This combined approach captures uncertainty and ambiguity in assessing dispute risks related to probability and severity, providing a more precise evaluation of disputes in construction projects. Additionally, the introduction of new dispute categories specifically targeting the preconstruction phase proactively deals with potential disputes before the construction begins. This advanced integrated hybrid system can be an effective preconstruction assessment tool for evaluating and managing various dispute factors, enabling project managers to proactively assess, manage, and mitigate construction disputes between project parties.
    • Download: (842.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Development of an Integrated Hybrid Risk Assessment System for Construction Disputes during the Preconstruction Phase Using the Delphi Method

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4298775
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorKhalid K. Naji
    contributor authorMurat Gunduz
    contributor authorManal M. Mansour
    date accessioned2024-12-24T10:21:38Z
    date available2024-12-24T10:21:38Z
    date copyright7/1/2024 12:00:00 AM
    date issued2024
    identifier otherJCEMD4.COENG-14492.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4298775
    description abstractThis paper proposes a hybrid conceptual and performance assessment integrated dispute risk system that enables construction professionals to evaluate, track, and manage construction disputes. It establishes a correlation between dispute-contributing factors and their respective preconstruction stages, facilitating early dispute detection and mitigation before the construction phase. This method can be applied to gauge the effectiveness of the preconstruction phase in relation to its influence on the emergence of disputes. Through an extensive literature review, expert interviews, and the Delphi technique, 48 key risk factors were identified and categorized into four groups. Eighteen experts were selected using purposive sampling, and their survey responses were checked for normality and reliability using the Shapiro–Wilk test and Cronbach’s alpha. The Delphi method was employed to reach a consensus among the panelists after two rounds of evaluation, using the nonparametric statistical parameters, such as Kendall’s coefficient of concordance and chi-squared. Subsequently, the interrater agreement (IRA) was measured, and the dispute factors were ranked. Based on the ranking results, a novel integrated hybrid system was formulated that synergistically combines a hybrid conceptual and performance assessment framework with a fuzzy logic–structural equation model (SEM). The proposed hybrid system includes two key components: a unique conceptual and performance assessment framework and a hybrid model that combines fuzzy logic and SEM. This combined approach captures uncertainty and ambiguity in assessing dispute risks related to probability and severity, providing a more precise evaluation of disputes in construction projects. Additionally, the introduction of new dispute categories specifically targeting the preconstruction phase proactively deals with potential disputes before the construction begins. This advanced integrated hybrid system can be an effective preconstruction assessment tool for evaluating and managing various dispute factors, enabling project managers to proactively assess, manage, and mitigate construction disputes between project parties.
    publisherAmerican Society of Civil Engineers
    titleDevelopment of an Integrated Hybrid Risk Assessment System for Construction Disputes during the Preconstruction Phase Using the Delphi Method
    typeJournal Article
    journal volume150
    journal issue7
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-14492
    journal fristpage04024068-1
    journal lastpage04024068-24
    page24
    treeJournal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian