YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • International Journal of Geomechanics
    • View Item
    •   YE&T Library
    • ASCE
    • International Journal of Geomechanics
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Determination of Minimum Intermediary Hold Durations in Multistage First-Filling Schedule of Earth-Fill Dam Reservoirs

    Source: International Journal of Geomechanics:;2024:;Volume ( 024 ):;issue: 007::page 04024135-1
    Author:
    Ege Can Kurter
    ,
    Melih Calamak
    ,
    A. Melih Yanmaz
    DOI: 10.1061/IJGNAI.GMENG-9733
    Publisher: American Society of Civil Engineers
    Abstract: Earth-fill dams should be monitored during the first filling of the reservoir to avoid several potential risks. Following the completion of dam construction, the primary safety check is monitoring the dam behavior during the first interaction of the earth material with water. The presented work fills the gap in the literature on the determination of intermediary hold durations of multistage filling schedule and provides insights into the first-filling process. The study investigated the behavior of a 20 m high earth-fill dam model subjected to staged reservoir filling. The durations of the intermediary holds were determined based on coupled stress and pore water pressure analyses using the finite-element method, with a particular emphasis on the transient behavior of the filling process. Hydraulic fracturing and internal erosion possibilities were evaluated based on minimum principal stress and seepage quantities at critical sections. It was observed that the minimum principal stress reaches a local minimum and tends to increase, leading to significant convergence for longer hold alternatives. In addition, seepage quantities exhibited similar behavior of decreasing with longer hold durations. A specific hold duration was recommended for the low-pool level, which resulted in a hold-to-height ratio of 2.35. At the high-pool level, it was found that further waiting has a positive effect in mitigating the risk of hydraulic fracturing and internal erosion initiation. The presented practical methodology is proposed to be used for the design of filling schedules of new dams. This study provides practical insights for design engineers to determine the first-filling schedule of earth-fill dams. The stress–pore pressure coupled finite-element model information obtained from this study can be helpful for onsite engineers who have access to instrumentation data during the first filling. These data can be used to predict the convergence of key parameters. For intermediary holds at low-pool levels, monitoring minimum principal stress and effective stress behavior over time is crucial to prevent cracking which can lead to hydraulic fracturing if filling continues. Specifically, the initially decreasing principal stress at the upstream face of the core should be closely monitored until an increasing trend is observed, to ensure that sufficient time is allowed before the dam is subjected to higher loads.
    • Download: (1.055Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Determination of Minimum Intermediary Hold Durations in Multistage First-Filling Schedule of Earth-Fill Dam Reservoirs

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4298498
    Collections
    • International Journal of Geomechanics

    Show full item record

    contributor authorEge Can Kurter
    contributor authorMelih Calamak
    contributor authorA. Melih Yanmaz
    date accessioned2024-12-24T10:12:38Z
    date available2024-12-24T10:12:38Z
    date copyright7/1/2024 12:00:00 AM
    date issued2024
    identifier otherIJGNAI.GMENG-9733.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4298498
    description abstractEarth-fill dams should be monitored during the first filling of the reservoir to avoid several potential risks. Following the completion of dam construction, the primary safety check is monitoring the dam behavior during the first interaction of the earth material with water. The presented work fills the gap in the literature on the determination of intermediary hold durations of multistage filling schedule and provides insights into the first-filling process. The study investigated the behavior of a 20 m high earth-fill dam model subjected to staged reservoir filling. The durations of the intermediary holds were determined based on coupled stress and pore water pressure analyses using the finite-element method, with a particular emphasis on the transient behavior of the filling process. Hydraulic fracturing and internal erosion possibilities were evaluated based on minimum principal stress and seepage quantities at critical sections. It was observed that the minimum principal stress reaches a local minimum and tends to increase, leading to significant convergence for longer hold alternatives. In addition, seepage quantities exhibited similar behavior of decreasing with longer hold durations. A specific hold duration was recommended for the low-pool level, which resulted in a hold-to-height ratio of 2.35. At the high-pool level, it was found that further waiting has a positive effect in mitigating the risk of hydraulic fracturing and internal erosion initiation. The presented practical methodology is proposed to be used for the design of filling schedules of new dams. This study provides practical insights for design engineers to determine the first-filling schedule of earth-fill dams. The stress–pore pressure coupled finite-element model information obtained from this study can be helpful for onsite engineers who have access to instrumentation data during the first filling. These data can be used to predict the convergence of key parameters. For intermediary holds at low-pool levels, monitoring minimum principal stress and effective stress behavior over time is crucial to prevent cracking which can lead to hydraulic fracturing if filling continues. Specifically, the initially decreasing principal stress at the upstream face of the core should be closely monitored until an increasing trend is observed, to ensure that sufficient time is allowed before the dam is subjected to higher loads.
    publisherAmerican Society of Civil Engineers
    titleDetermination of Minimum Intermediary Hold Durations in Multistage First-Filling Schedule of Earth-Fill Dam Reservoirs
    typeJournal Article
    journal volume24
    journal issue7
    journal titleInternational Journal of Geomechanics
    identifier doi10.1061/IJGNAI.GMENG-9733
    journal fristpage04024135-1
    journal lastpage04024135-10
    page10
    treeInternational Journal of Geomechanics:;2024:;Volume ( 024 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian