YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Tactical Conflict Prevention Strategies in Public–Private Partnerships: Lessons from Experts

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2024:;Volume ( 016 ):;issue: 001::page 04523046-1
    Author:
    Dakshina Liyanapathirana
    ,
    Onaopepo Adeniyi
    ,
    Pavithra Rathnasiri
    DOI: 10.1061/JLADAH.LADR-996
    Publisher: ASCE
    Abstract: Conflicts are frequent in public–private partnerships (PPP) due to the involvement of multidisciplined parties within the process. Individual parties among the numerous stakeholders often work toward achieving their own desired goals. Early identification and elimination of potential conflicts are significant to achieving a smooth delivery process of PPP projects. PPP offers imperative benefits for economic development, especially in developing countries. However, despite the huge potentials of PPP in infrastructure development, limited attention still exists in the early stage on the prevention of conflict. Aside from that, a more focused investigation is required across different locations. Therefore, this study aims to enhance the understanding of conflict occurrence and articulate steps to conflict prevention in PPPs through preconstruction stage practices. Expert interviews were carried out in two phases. Phase I identified the current process and triggers of conflicts and Phase 2 identified the strategies, and recommendations to eliminate the conflicts. The purposive sampling method was used for the selection of experts in Sri Lanka and findings were analyzed using the content analysis method. This study identified and categorized the triggers of conflicts in PPP as political interference and public interruption, lack of knowledge about PPP, contractual agreement, and commitment of professionals. Further, the strategies to prevent conflicts were discussed under key headings such as proper professional practice, use of lessons learned, thorough contract drafting, a well-defined program, precontract practices, project-long audits, awareness programs, and government support.
    • Download: (342.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Tactical Conflict Prevention Strategies in Public–Private Partnerships: Lessons from Experts

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4297765
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorDakshina Liyanapathirana
    contributor authorOnaopepo Adeniyi
    contributor authorPavithra Rathnasiri
    date accessioned2024-04-27T22:53:38Z
    date available2024-04-27T22:53:38Z
    date issued2024/02/01
    identifier other10.1061-JLADAH.LADR-996.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4297765
    description abstractConflicts are frequent in public–private partnerships (PPP) due to the involvement of multidisciplined parties within the process. Individual parties among the numerous stakeholders often work toward achieving their own desired goals. Early identification and elimination of potential conflicts are significant to achieving a smooth delivery process of PPP projects. PPP offers imperative benefits for economic development, especially in developing countries. However, despite the huge potentials of PPP in infrastructure development, limited attention still exists in the early stage on the prevention of conflict. Aside from that, a more focused investigation is required across different locations. Therefore, this study aims to enhance the understanding of conflict occurrence and articulate steps to conflict prevention in PPPs through preconstruction stage practices. Expert interviews were carried out in two phases. Phase I identified the current process and triggers of conflicts and Phase 2 identified the strategies, and recommendations to eliminate the conflicts. The purposive sampling method was used for the selection of experts in Sri Lanka and findings were analyzed using the content analysis method. This study identified and categorized the triggers of conflicts in PPP as political interference and public interruption, lack of knowledge about PPP, contractual agreement, and commitment of professionals. Further, the strategies to prevent conflicts were discussed under key headings such as proper professional practice, use of lessons learned, thorough contract drafting, a well-defined program, precontract practices, project-long audits, awareness programs, and government support.
    publisherASCE
    titleTactical Conflict Prevention Strategies in Public–Private Partnerships: Lessons from Experts
    typeJournal Article
    journal volume16
    journal issue1
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/JLADAH.LADR-996
    journal fristpage04523046-1
    journal lastpage04523046-14
    page14
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2024:;Volume ( 016 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian