YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Predicting Construction Crew Productivity for Concrete-Pouring Operations

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2024:;Volume ( 016 ):;issue: 002::page 04524001-1
    Author:
    Parth Patel
    ,
    D. V. Patel
    ,
    V. H. Lad
    ,
    K. A. Patel
    ,
    D. A. Patel
    DOI: 10.1061/JLADAH.LADR-1034
    Publisher: ASCE
    Abstract: In the construction industry, laborers generally work in a crew, and if they perform poorly, it significantly impacts on overall construction productivity. The construction crew productivity (CCP) is prone to different factors, some of which are within the engineer’s control and others are not. Due to this, it is an arduous and challenging task to establish productivity claims based on the CCP. Therefore, this study aims to evaluate CCP and, based on it, signify and defend the loss of productivity claims. To evaluate CCP, a feed-forward back-propagation artificial neural network (ANN) approach is utilized. A total of 14 factors influencing the CCP are considered inputs, while CCP is considered output in the ANN model. Further, an explicit expression is derived from the final weights and biases of the trained ANN. The performance of the model is checked by statistical parameters such as mean square error (MSE), root mean square error (RMSE), average absolute deviation (AAD), square of correlation coefficient (R2), and coefficient of variation (COV). Then, to implement for practical purposes, the proposed ANN model is deployed on a project in India and found satisfactory performance. Further, the sensitivity analysis extracts the influence rate of each factor on the CCP and finds the top three significant factors: crew size, working hours, and temperature. Thus, the proposed study helps to estimate and provide caveats in the context of claims when there are losses through CCP. Herein, the presented methodology is applied to the concrete-pouring operation of reinforced concrete (RC) columns. However, it can be extended to other RC structural members like slabs, beams, foundations, etc. A construction project is often a challenging and dynamic process, which includes many specially made procedures and aspects. Out of these aspects, construction crew productivity (CCP) is one of the critical and uncertain, as it can comprise the overall cost of the project. Therefore, alteration in the CCP can impact the cost and time of the project. These alterations can result from multiple influence factors. In 2004, the American Association of Cost Engineering (AACE) has reported various factors that can influence CCP. Further, the report also stated that some of the influencing factors can be anticipated and covered in the contract documents, while others are beyond contractors’ control. For this, the contractors might need to seek the claims of the resources, time, and cost due to the loss of CCP. Therefore, contractors must establish both entitlement and a causal connection between the claimed disruption and declined CCP in order to recover the losses due to disruptions beyond their control. Hence, this study provides a base for predicting the CCP and then effectively identifies the factors that contribute to declining CCP. Based on this information, contractors can substantially simplify the documentation of claims for productivity losses that may occur throughout a project.
    • Download: (1.450Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Predicting Construction Crew Productivity for Concrete-Pouring Operations

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4297734
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorParth Patel
    contributor authorD. V. Patel
    contributor authorV. H. Lad
    contributor authorK. A. Patel
    contributor authorD. A. Patel
    date accessioned2024-04-27T22:52:54Z
    date available2024-04-27T22:52:54Z
    date issued2024/05/01
    identifier other10.1061-JLADAH.LADR-1034.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4297734
    description abstractIn the construction industry, laborers generally work in a crew, and if they perform poorly, it significantly impacts on overall construction productivity. The construction crew productivity (CCP) is prone to different factors, some of which are within the engineer’s control and others are not. Due to this, it is an arduous and challenging task to establish productivity claims based on the CCP. Therefore, this study aims to evaluate CCP and, based on it, signify and defend the loss of productivity claims. To evaluate CCP, a feed-forward back-propagation artificial neural network (ANN) approach is utilized. A total of 14 factors influencing the CCP are considered inputs, while CCP is considered output in the ANN model. Further, an explicit expression is derived from the final weights and biases of the trained ANN. The performance of the model is checked by statistical parameters such as mean square error (MSE), root mean square error (RMSE), average absolute deviation (AAD), square of correlation coefficient (R2), and coefficient of variation (COV). Then, to implement for practical purposes, the proposed ANN model is deployed on a project in India and found satisfactory performance. Further, the sensitivity analysis extracts the influence rate of each factor on the CCP and finds the top three significant factors: crew size, working hours, and temperature. Thus, the proposed study helps to estimate and provide caveats in the context of claims when there are losses through CCP. Herein, the presented methodology is applied to the concrete-pouring operation of reinforced concrete (RC) columns. However, it can be extended to other RC structural members like slabs, beams, foundations, etc. A construction project is often a challenging and dynamic process, which includes many specially made procedures and aspects. Out of these aspects, construction crew productivity (CCP) is one of the critical and uncertain, as it can comprise the overall cost of the project. Therefore, alteration in the CCP can impact the cost and time of the project. These alterations can result from multiple influence factors. In 2004, the American Association of Cost Engineering (AACE) has reported various factors that can influence CCP. Further, the report also stated that some of the influencing factors can be anticipated and covered in the contract documents, while others are beyond contractors’ control. For this, the contractors might need to seek the claims of the resources, time, and cost due to the loss of CCP. Therefore, contractors must establish both entitlement and a causal connection between the claimed disruption and declined CCP in order to recover the losses due to disruptions beyond their control. Hence, this study provides a base for predicting the CCP and then effectively identifies the factors that contribute to declining CCP. Based on this information, contractors can substantially simplify the documentation of claims for productivity losses that may occur throughout a project.
    publisherASCE
    titlePredicting Construction Crew Productivity for Concrete-Pouring Operations
    typeJournal Article
    journal volume16
    journal issue2
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/JLADAH.LADR-1034
    journal fristpage04524001-1
    journal lastpage04524001-12
    page12
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2024:;Volume ( 016 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian