YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Performance of Priority Rules for Finance-Based and Resource-Constrained Project Scheduling Heuristics

    Source: Journal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 006::page 04024047-1
    Author:
    Wanlin Liu
    ,
    Jingwen Zhang
    ,
    Chunli Qu
    ,
    Haotian Zhang
    DOI: 10.1061/JCEMD4.COENG-14633
    Publisher: ASCE
    Abstract: Over the years, the finance-based and resource-constrained project scheduling problem (FBRCPSP) has been aimed at scheduling activities and offsetting the capital gap without exceeding credit and renewable resource limits in capital-driven construction projects. However, the heuristics proposed for the FBRCPSP in previous studies neglected to focus on identifying efficient priority rules, which are understandable and intuitive for construction practitioners with different roles. Accordingly, this study explores efficient priority rules and evaluates their performance according to modified serial and parallel schedule generation scheme heuristics for the FBRCPSP. First, 11 priority rules that cover the project network, schedule, activity, and resource information are introduced, and three priority rules related to activity information are designed. Second, the two priority rule-based heuristics are applied in an example to generate multiple project schedules according to the different combinations of priority rules and heuristics. Furthermore, the performance of priority rules is tested on the metrics of project duration and profit through numerical experiments. The results show that the priority rules of the latest start time, latest finish time, and old great rank positional weight are the three best priority rules in general. Additionally, the priority rules evenly present more stable and superior results than those obtained by other priority rules for the different levels of weekly fixed overhead cost and the scenarios of contract terms. Based on the intuitive heuristics, the selected efficient priority rules assist contractors in deciding which priority rule should be applied in practice, and project managers can employ an effective priority rule to establish a baseline schedule in the initial project phase and quickly adjust the plan when it becomes infeasible for project execution. This study evaluates the performance of frequently used priority rules on finance-based and resource-constrained project scheduling heuristics in construction project management. The model and priority rule-based heuristics can be embedded into project management software or digitalized scheduling platforms in practice. Moreover, project managers can employ efficient priority rule-based heuristics to generate a desirable project schedule for mastering cash flow and resource-demand plans in the project planning stage. Intuitive priority rules are incorporated into the heuristics to quickly adjust or update schedules and financing alternatives for project management when a baseline schedule is disrupted during the project execution. In addition, practitioners can obtain more adaptive or efficient priority rules following the testing approach proposed in this work if they have rich similar project experience or big data in construction projects. In summary, this study offers construction project schedulers or managers practical scheduling strategies and approaches for addressing finance-based and resource-constrained construction projects.
    • Download: (563.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Performance of Priority Rules for Finance-Based and Resource-Constrained Project Scheduling Heuristics

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4297480
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorWanlin Liu
    contributor authorJingwen Zhang
    contributor authorChunli Qu
    contributor authorHaotian Zhang
    date accessioned2024-04-27T22:46:54Z
    date available2024-04-27T22:46:54Z
    date issued2024/06/01
    identifier other10.1061-JCEMD4.COENG-14633.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4297480
    description abstractOver the years, the finance-based and resource-constrained project scheduling problem (FBRCPSP) has been aimed at scheduling activities and offsetting the capital gap without exceeding credit and renewable resource limits in capital-driven construction projects. However, the heuristics proposed for the FBRCPSP in previous studies neglected to focus on identifying efficient priority rules, which are understandable and intuitive for construction practitioners with different roles. Accordingly, this study explores efficient priority rules and evaluates their performance according to modified serial and parallel schedule generation scheme heuristics for the FBRCPSP. First, 11 priority rules that cover the project network, schedule, activity, and resource information are introduced, and three priority rules related to activity information are designed. Second, the two priority rule-based heuristics are applied in an example to generate multiple project schedules according to the different combinations of priority rules and heuristics. Furthermore, the performance of priority rules is tested on the metrics of project duration and profit through numerical experiments. The results show that the priority rules of the latest start time, latest finish time, and old great rank positional weight are the three best priority rules in general. Additionally, the priority rules evenly present more stable and superior results than those obtained by other priority rules for the different levels of weekly fixed overhead cost and the scenarios of contract terms. Based on the intuitive heuristics, the selected efficient priority rules assist contractors in deciding which priority rule should be applied in practice, and project managers can employ an effective priority rule to establish a baseline schedule in the initial project phase and quickly adjust the plan when it becomes infeasible for project execution. This study evaluates the performance of frequently used priority rules on finance-based and resource-constrained project scheduling heuristics in construction project management. The model and priority rule-based heuristics can be embedded into project management software or digitalized scheduling platforms in practice. Moreover, project managers can employ efficient priority rule-based heuristics to generate a desirable project schedule for mastering cash flow and resource-demand plans in the project planning stage. Intuitive priority rules are incorporated into the heuristics to quickly adjust or update schedules and financing alternatives for project management when a baseline schedule is disrupted during the project execution. In addition, practitioners can obtain more adaptive or efficient priority rules following the testing approach proposed in this work if they have rich similar project experience or big data in construction projects. In summary, this study offers construction project schedulers or managers practical scheduling strategies and approaches for addressing finance-based and resource-constrained construction projects.
    publisherASCE
    titlePerformance of Priority Rules for Finance-Based and Resource-Constrained Project Scheduling Heuristics
    typeJournal Article
    journal volume150
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-14633
    journal fristpage04024047-1
    journal lastpage04024047-14
    page14
    treeJournal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian