YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Work–Rest Schedule Optimization of Precast Production Considering Workers’ Overexertion

    Source: Journal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 005::page 04024033-1
    Author:
    Yu Tao
    ,
    Hao Hu
    ,
    Feng Xu
    ,
    Zhipeng Zhang
    DOI: 10.1061/JCEMD4.COENG-14377
    Publisher: ASCE
    Abstract: The production process of precast components is labor-intensive, involving various manual tasks. The physically demanding tasks usually result in fatigue and overexertion of workers, leading to increased occupational health risks and reduced productivity. An appropriate work–rest strategy is recognized to effectively promote both workers’ health and productivity, while it has rarely been studied in the field of the construction industry. To narrow this gap, this study developed a mixed-integer linear programming approach to optimize the work–rest schedule by integrating workers’ overexertion. The objective is to maximize the productive time affected by the workers’ accumulative fatigue and recovery. Also, the optimized work–rest strategy can be highly customized by considering personalized factors and task characteristics. Experimenting with a case study compared the default rest schedule provided by the superintendent onsite with the optimal solution solved from the developed model. Results suggested that up to 20% improvement in productive time can be achieved, especially for the task with a relatively higher workload. Computational experiments were conducted to evaluate the sensitivity of total productive time to various personalized and task-specific factors. The proposed method provides superintendents with an applicable strategy to improve workers’ productivity and reduce their occupational risks resulting from overexertion. This study can promote the implementation of personalized occupational health management and support the improvement of regulations on the required rest with quantified evidence, thereby contributing to more reliable scheduling and sustainable workforce development for the construction industry. The research scope was limited to the precast production process, and further investigation on broader applications will be conducted.
    • Download: (1.216Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Work–Rest Schedule Optimization of Precast Production Considering Workers’ Overexertion

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4297471
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorYu Tao
    contributor authorHao Hu
    contributor authorFeng Xu
    contributor authorZhipeng Zhang
    date accessioned2024-04-27T22:46:40Z
    date available2024-04-27T22:46:40Z
    date issued2024/05/01
    identifier other10.1061-JCEMD4.COENG-14377.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4297471
    description abstractThe production process of precast components is labor-intensive, involving various manual tasks. The physically demanding tasks usually result in fatigue and overexertion of workers, leading to increased occupational health risks and reduced productivity. An appropriate work–rest strategy is recognized to effectively promote both workers’ health and productivity, while it has rarely been studied in the field of the construction industry. To narrow this gap, this study developed a mixed-integer linear programming approach to optimize the work–rest schedule by integrating workers’ overexertion. The objective is to maximize the productive time affected by the workers’ accumulative fatigue and recovery. Also, the optimized work–rest strategy can be highly customized by considering personalized factors and task characteristics. Experimenting with a case study compared the default rest schedule provided by the superintendent onsite with the optimal solution solved from the developed model. Results suggested that up to 20% improvement in productive time can be achieved, especially for the task with a relatively higher workload. Computational experiments were conducted to evaluate the sensitivity of total productive time to various personalized and task-specific factors. The proposed method provides superintendents with an applicable strategy to improve workers’ productivity and reduce their occupational risks resulting from overexertion. This study can promote the implementation of personalized occupational health management and support the improvement of regulations on the required rest with quantified evidence, thereby contributing to more reliable scheduling and sustainable workforce development for the construction industry. The research scope was limited to the precast production process, and further investigation on broader applications will be conducted.
    publisherASCE
    titleWork–Rest Schedule Optimization of Precast Production Considering Workers’ Overexertion
    typeJournal Article
    journal volume150
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-14377
    journal fristpage04024033-1
    journal lastpage04024033-12
    page12
    treeJournal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian