YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Identifying Construction Managers’ Challenges: A Novel Approach Based on Social Network Analysis

    Source: Journal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 001::page 04023141-1
    Author:
    Milad Aghililotf
    ,
    Amir Mohammad Ramezanianpour
    ,
    Hani Arbabi
    ,
    Mojtaba Maghrebi
    DOI: 10.1061/JCEMD4.COENG-13771
    Publisher: ASCE
    Abstract: Due to the complex and dynamic atmosphere in the construction sector, different types of challenges are faced by project managers (PMs). These challenges potentially have negative impacts on the PM’s managerial performance, which mostly leads to budget and schedule contingencies. In this vein, scrutinizing the main challenges in a construction project and identifying the cause-and-effect relationships among these challenges is a crucially important process. In the literature, a considerable number of papers have tried to determine construction PM challenges, mainly using statistical methods. These methods do not consider the cause-and-effect relationship among variables. To enhance the existing methods, this paper applies social network analysis (SNA) principles in order to rank a group of variables based on cause-and-effect relationships. To demonstrate the proposed idea, a data set is constructed that includes different types of challenges acquired from the literature comprehended with the forward-chaining approach. In total, 49 critical challenges were identified and subsequently categorized into 12 groups. Two questionnaires were designed to assist in ranking the challenges. 108 construction experts and 20 panelists participated in this study, and the acquired data were used to evaluate the proposed SNA-based method. By applying the proposed method to the obtained data, a complex weighted and directed network is constructed and examined by three metrics: weighted in-degree centrality, betweenness centrality, and closeness centrality. The results revealed that poor planning, contractors’/subcontractors’ financial difficulties, and poor decision making are the main challenges that occur in the construction environment. Moreover, it was figured out that considering the cause-and-effect relationship among variables resulted in a highly different ranking of challenges, much closer to the real situation. This model could be used in quantitative-analytical research conducted in the construction project knowledge area in order to obtain more interpretable answers. Due to the complex and dynamic atmosphere in the construction sector, different types of challenges are faced by project managers (PMs). These challenges potentially have negative impacts on the PM’s managerial performance, which mostly lead to time and cost overruns. In this vein, scrutinizing the main challenges in a construction project and identifying the cause-and-effect relationships among these challenges is a crucially important process. In this research, comprehensive scientific efforts were made in order to rank the main PMs’ challenges in the construction sector, especially in developing countries. For this purpose, cause-and-effect relationships among variables were considered. By using different questionnaires as well as forming different focus groups and interviewing different experts, we found that the main top 10 challenges in the construction sector are: poor planning, contractors’/subcontractors’ financial difficulties, poor decision making, time pressure, rework, stressful atmosphere, design alteration (even after execution), workforce turnover, fluctuation rate and economic instability, and inappropriate and unrealistic scheduling.
    • Download: (2.452Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Identifying Construction Managers’ Challenges: A Novel Approach Based on Social Network Analysis

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4297414
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMilad Aghililotf
    contributor authorAmir Mohammad Ramezanianpour
    contributor authorHani Arbabi
    contributor authorMojtaba Maghrebi
    date accessioned2024-04-27T22:45:15Z
    date available2024-04-27T22:45:15Z
    date issued2024/01/01
    identifier other10.1061-JCEMD4.COENG-13771.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4297414
    description abstractDue to the complex and dynamic atmosphere in the construction sector, different types of challenges are faced by project managers (PMs). These challenges potentially have negative impacts on the PM’s managerial performance, which mostly leads to budget and schedule contingencies. In this vein, scrutinizing the main challenges in a construction project and identifying the cause-and-effect relationships among these challenges is a crucially important process. In the literature, a considerable number of papers have tried to determine construction PM challenges, mainly using statistical methods. These methods do not consider the cause-and-effect relationship among variables. To enhance the existing methods, this paper applies social network analysis (SNA) principles in order to rank a group of variables based on cause-and-effect relationships. To demonstrate the proposed idea, a data set is constructed that includes different types of challenges acquired from the literature comprehended with the forward-chaining approach. In total, 49 critical challenges were identified and subsequently categorized into 12 groups. Two questionnaires were designed to assist in ranking the challenges. 108 construction experts and 20 panelists participated in this study, and the acquired data were used to evaluate the proposed SNA-based method. By applying the proposed method to the obtained data, a complex weighted and directed network is constructed and examined by three metrics: weighted in-degree centrality, betweenness centrality, and closeness centrality. The results revealed that poor planning, contractors’/subcontractors’ financial difficulties, and poor decision making are the main challenges that occur in the construction environment. Moreover, it was figured out that considering the cause-and-effect relationship among variables resulted in a highly different ranking of challenges, much closer to the real situation. This model could be used in quantitative-analytical research conducted in the construction project knowledge area in order to obtain more interpretable answers. Due to the complex and dynamic atmosphere in the construction sector, different types of challenges are faced by project managers (PMs). These challenges potentially have negative impacts on the PM’s managerial performance, which mostly lead to time and cost overruns. In this vein, scrutinizing the main challenges in a construction project and identifying the cause-and-effect relationships among these challenges is a crucially important process. In this research, comprehensive scientific efforts were made in order to rank the main PMs’ challenges in the construction sector, especially in developing countries. For this purpose, cause-and-effect relationships among variables were considered. By using different questionnaires as well as forming different focus groups and interviewing different experts, we found that the main top 10 challenges in the construction sector are: poor planning, contractors’/subcontractors’ financial difficulties, poor decision making, time pressure, rework, stressful atmosphere, design alteration (even after execution), workforce turnover, fluctuation rate and economic instability, and inappropriate and unrealistic scheduling.
    publisherASCE
    titleIdentifying Construction Managers’ Challenges: A Novel Approach Based on Social Network Analysis
    typeJournal Article
    journal volume150
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-13771
    journal fristpage04023141-1
    journal lastpage04023141-19
    page19
    treeJournal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian