YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Risk Analysis of Connecticut Department of Transportation Projects during the COVID-19 Pandemic

    Source: Practice Periodical on Structural Design and Construction:;2024:;Volume ( 029 ):;issue: 003::page 04024016-1
    Author:
    Muhammad Rauf Shaker
    ,
    Cliff Schexnayder
    ,
    Byungik Chang
    DOI: 10.1061/PPSCFX.SCENG-1409
    Publisher: ASCE
    Abstract: Based on construction project data provided by the Connecticut Department of Transportation (CTDOT), this investigation provides an overview of transportation project delivery impactors during the COVID-19 pandemic. Some 205 CTDOT projects are the basis of this comparison study. Of the total number of projects reviewed, 95 were completed before COVID-19 government health guidelines were issued, and 110 were under construction during COVID-19. The two data sets permitted a comparison of the pandemic’s effect against prepandemic work. The total value of the projects studied was approximately $2.2 billion over the two distinct periods—one before the emergence of the pandemic and the other during the pandemic. The preCOVID era saw $1 billion worth of work completed, while during the pandemic, an additional $1.2 billion worth of work was carried out. The study demonstrates the pandemic’s impact based on 13 factors: schedule, material supply, environmental, weather, extra work, site restrictions, noncompliance/rending notices, surrounding residents, coordination with utilities, design/redesign, quality control, contractor’s quality of work, and no major risks/issues. Material supply and schedule were the two major study factors demonstrating pandemic impact. Because of social distancing guidelines, many construction sites had to reduce their workforce, leading to site-wise labor shortages. The projects of the study were separated into eight different types: safety improvements, traffic signal, roadway, bridge rehabilitation, bridge replacement, highway signage, facility renovation, and train station rehabilitation. Out of these categories, train station rehabilitation projects faced the greatest disruption in their material supply chain compared to the other types of projects.
    • Download: (1.735Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Risk Analysis of Connecticut Department of Transportation Projects during the COVID-19 Pandemic

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4297060
    Collections
    • Journal of Structural Design and Construction Practice

    Show full item record

    contributor authorMuhammad Rauf Shaker
    contributor authorCliff Schexnayder
    contributor authorByungik Chang
    date accessioned2024-04-27T22:36:29Z
    date available2024-04-27T22:36:29Z
    date issued2024/08/01
    identifier other10.1061-PPSCFX.SCENG-1409.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4297060
    description abstractBased on construction project data provided by the Connecticut Department of Transportation (CTDOT), this investigation provides an overview of transportation project delivery impactors during the COVID-19 pandemic. Some 205 CTDOT projects are the basis of this comparison study. Of the total number of projects reviewed, 95 were completed before COVID-19 government health guidelines were issued, and 110 were under construction during COVID-19. The two data sets permitted a comparison of the pandemic’s effect against prepandemic work. The total value of the projects studied was approximately $2.2 billion over the two distinct periods—one before the emergence of the pandemic and the other during the pandemic. The preCOVID era saw $1 billion worth of work completed, while during the pandemic, an additional $1.2 billion worth of work was carried out. The study demonstrates the pandemic’s impact based on 13 factors: schedule, material supply, environmental, weather, extra work, site restrictions, noncompliance/rending notices, surrounding residents, coordination with utilities, design/redesign, quality control, contractor’s quality of work, and no major risks/issues. Material supply and schedule were the two major study factors demonstrating pandemic impact. Because of social distancing guidelines, many construction sites had to reduce their workforce, leading to site-wise labor shortages. The projects of the study were separated into eight different types: safety improvements, traffic signal, roadway, bridge rehabilitation, bridge replacement, highway signage, facility renovation, and train station rehabilitation. Out of these categories, train station rehabilitation projects faced the greatest disruption in their material supply chain compared to the other types of projects.
    publisherASCE
    titleRisk Analysis of Connecticut Department of Transportation Projects during the COVID-19 Pandemic
    typeJournal Article
    journal volume29
    journal issue3
    journal titlePractice Periodical on Structural Design and Construction
    identifier doi10.1061/PPSCFX.SCENG-1409
    journal fristpage04024016-1
    journal lastpage04024016-11
    page11
    treePractice Periodical on Structural Design and Construction:;2024:;Volume ( 029 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian