YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • International Journal of Geomechanics
    • View Item
    •   YE&T Library
    • ASCE
    • International Journal of Geomechanics
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Grouting Theory and Strategy of Simultaneous Control of the Horizontal and Vertical Deformations of Tunnels

    Source: International Journal of Geomechanics:;2024:;Volume ( 024 ):;issue: 002::page 04023267-1
    Author:
    Xuesong Cheng
    ,
    Luteng Sheng
    ,
    Zengyin Xia
    ,
    Ying Liu
    ,
    Xiaolong Ma
    ,
    Jun Pan
    ,
    Gang Zheng
    ,
    Ruikun Wang
    DOI: 10.1061/IJGNAI.GMENG-8839
    Publisher: ASCE
    Abstract: Disturbance induced by excavation is a major threat to the structural and operational safety of the tunnel in the vicinity of the excavation. Grouting is considered to be an efficient method for controlling tunnel deformation. However, it is difficult to achieve simultaneous control of the horizontal and vertical deformations of the tunnel in practice, which may encounter substantial construction risks and potential safety hazards to the tunnel near the excavation. To address this issue, a finite-element simulation was conducted to analyze the effect of grouting on the horizontal and vertical deformations of the tunnel based on a case history. The results indicated that the horizontal displacements of the tunnel can be effectively recovered when vertical grouting is adopted separately, whereas the vertical displacements are barely affected. Further, the vertical grouting and oblique grouting below the tunnel are combined, which is capable of simultaneously recovering the horizontal and vertical displacements of the tunnel. In addition, to restore the heave of the tunnel, a combination of vertical grouting and unloading holes is utilized when the tunnel is in the heave region induced by excavation. This novel grouting method enables the simultaneous recovery of the horizontal and vertical deformations of the tunnel and expands the application of the active grouting control method.
    • Download: (3.511Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Grouting Theory and Strategy of Simultaneous Control of the Horizontal and Vertical Deformations of Tunnels

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4296613
    Collections
    • International Journal of Geomechanics

    Show full item record

    contributor authorXuesong Cheng
    contributor authorLuteng Sheng
    contributor authorZengyin Xia
    contributor authorYing Liu
    contributor authorXiaolong Ma
    contributor authorJun Pan
    contributor authorGang Zheng
    contributor authorRuikun Wang
    date accessioned2024-04-27T22:25:11Z
    date available2024-04-27T22:25:11Z
    date issued2024/02/01
    identifier other10.1061-IJGNAI.GMENG-8839.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4296613
    description abstractDisturbance induced by excavation is a major threat to the structural and operational safety of the tunnel in the vicinity of the excavation. Grouting is considered to be an efficient method for controlling tunnel deformation. However, it is difficult to achieve simultaneous control of the horizontal and vertical deformations of the tunnel in practice, which may encounter substantial construction risks and potential safety hazards to the tunnel near the excavation. To address this issue, a finite-element simulation was conducted to analyze the effect of grouting on the horizontal and vertical deformations of the tunnel based on a case history. The results indicated that the horizontal displacements of the tunnel can be effectively recovered when vertical grouting is adopted separately, whereas the vertical displacements are barely affected. Further, the vertical grouting and oblique grouting below the tunnel are combined, which is capable of simultaneously recovering the horizontal and vertical displacements of the tunnel. In addition, to restore the heave of the tunnel, a combination of vertical grouting and unloading holes is utilized when the tunnel is in the heave region induced by excavation. This novel grouting method enables the simultaneous recovery of the horizontal and vertical deformations of the tunnel and expands the application of the active grouting control method.
    publisherASCE
    titleGrouting Theory and Strategy of Simultaneous Control of the Horizontal and Vertical Deformations of Tunnels
    typeJournal Article
    journal volume24
    journal issue2
    journal titleInternational Journal of Geomechanics
    identifier doi10.1061/IJGNAI.GMENG-8839
    journal fristpage04023267-1
    journal lastpage04023267-13
    page13
    treeInternational Journal of Geomechanics:;2024:;Volume ( 024 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian