YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Protection of a 193.5-m High Concrete Tube-Shaped TV Tower Close to Subway Excavations

    Source: Journal of Performance of Constructed Facilities:;2023:;Volume ( 037 ):;issue: 005::page 04023043-1
    Author:
    Jun-Cheng Liu
    ,
    Yong Tan
    ,
    Shao-Ming Liao
    DOI: 10.1061/JPCFEV.CFENG-4456
    Publisher: ASCE
    Abstract: A 193.5-m high concrete tube-shaped TV tower in the city of Nantong, China, was founded on short piled–raft footing, whose safety was threatened by implementation of four 10.9–26.5-m-deep excavations for an interchange subway station within close proximity. Considering the great damage potential of the TV tower associated with excavation-induced ground movement, a row of barrier piles consisting of bored piles was initially constructed between the excavations and TV tower. Field monitoring data indicated that the TV tower developed limited settlements during excavation of the two farthermost subway zones. However, it suffered notable settlements during excavation of the second farthest subway zone; hence, large-diameter metro-jet-system (MJS) piles along with bislurry piles were constructed between the excavations and TV tower to mitigate the adverse excavation influence. As a result, the tower gradually stabilized as construction continued, but it still exhibited an accelerated rate of differential settlement. Since excessive differential settlements might incur cracking, tilting, or even an overturning failure of the tower, it was determined finally to underpin the TV tower with long end-bearing steel pipe piles before excavation of the closest subway zone. With the aid of the comprehensive underpinning plan, the tower gradually became steady during excavation of the closest subway zone, without suffering structural damages or excessive deformations. The lessons and experience learned from this project as well as the extensive protection plans and measures are practically useful for engineers worldwide to safeguard high-rise superstructures sensitive to ground movement.
    • Download: (3.268Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Protection of a 193.5-m High Concrete Tube-Shaped TV Tower Close to Subway Excavations

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4294053
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorJun-Cheng Liu
    contributor authorYong Tan
    contributor authorShao-Ming Liao
    date accessioned2023-11-28T00:05:29Z
    date available2023-11-28T00:05:29Z
    date issued7/31/2023 12:00:00 AM
    date issued2023-07-31
    identifier otherJPCFEV.CFENG-4456.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4294053
    description abstractA 193.5-m high concrete tube-shaped TV tower in the city of Nantong, China, was founded on short piled–raft footing, whose safety was threatened by implementation of four 10.9–26.5-m-deep excavations for an interchange subway station within close proximity. Considering the great damage potential of the TV tower associated with excavation-induced ground movement, a row of barrier piles consisting of bored piles was initially constructed between the excavations and TV tower. Field monitoring data indicated that the TV tower developed limited settlements during excavation of the two farthermost subway zones. However, it suffered notable settlements during excavation of the second farthest subway zone; hence, large-diameter metro-jet-system (MJS) piles along with bislurry piles were constructed between the excavations and TV tower to mitigate the adverse excavation influence. As a result, the tower gradually stabilized as construction continued, but it still exhibited an accelerated rate of differential settlement. Since excessive differential settlements might incur cracking, tilting, or even an overturning failure of the tower, it was determined finally to underpin the TV tower with long end-bearing steel pipe piles before excavation of the closest subway zone. With the aid of the comprehensive underpinning plan, the tower gradually became steady during excavation of the closest subway zone, without suffering structural damages or excessive deformations. The lessons and experience learned from this project as well as the extensive protection plans and measures are practically useful for engineers worldwide to safeguard high-rise superstructures sensitive to ground movement.
    publisherASCE
    titleProtection of a 193.5-m High Concrete Tube-Shaped TV Tower Close to Subway Excavations
    typeJournal Article
    journal volume37
    journal issue5
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/JPCFEV.CFENG-4456
    journal fristpage04023043-1
    journal lastpage04023043-14
    page14
    treeJournal of Performance of Constructed Facilities:;2023:;Volume ( 037 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian