YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Role of Shapley Additive Explanations and Resampling Algorithms for Contract Failure Prediction of Public–Private Partnership Projects

    Source: Journal of Management in Engineering:;2023:;Volume ( 039 ):;issue: 005::page 04023031-1
    Author:
    Kerim Koc
    DOI: 10.1061/JMENEA.MEENG-5492
    Publisher: ASCE
    Abstract: A public–private partnership (PPP) is a common procurement model implemented worldwide as a catalyst for economic growth and improved public infrastructure. However, due to their inherent characteristics, the risk of failure in some PPP projects is high, causing heavy losses to both entities. Despite distinctive progress being made in PPP projects to reduce their failure probability, there is no proper and effective framework to predict PPP project failure in advance in either developing or in developed countries. The present study aims to develop a machine learning (ML) model to predict the failure of PPP projects to prosper in adverse conditions. This research addresses two critical issues, i.e., class imbalance and interpretability of ML models, that differentiate the current study from data-driven studies to date. First, existing studies usually focused on comparing and selecting the most adequate ML methods, but this study distinctively compared the performances of nine data resampling algorithms. Besides, in order to enhance the interpretability and visibility of the proposed model, a game theory–based feature investigation algorithm, Shapley additive explanations (SHAP), was used to identify not only the most significant features, but also the conditions of the features that cause failure or success in PPP projects. The findings illustrate that the proposed model yielded the highest prediction performance once the data set was resampled with the support vector machine-synthetic minority oversampling technique (SVM-SMOTE). SHAP analysis further shows that unsolicited proposals, domestic credit to the private sector, and project type/subtype have significant impacts on the prediction rationale. Overall, this study contributes to theory through incorporating resampling methods and SHAP algorithm into ML models as well as to practice with an advanced and reliable model to predict the status of PPP projects. The data-driven model and findings are expected to respond to current policy and industry needs by proposing a robust decision-making input for detecting risky PPP projects, allocating resources more effectively based on the most critical failure factors, and promoting the transparency of PPP project outcomes.
    • Download: (2.444Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Role of Shapley Additive Explanations and Resampling Algorithms for Contract Failure Prediction of Public–Private Partnership Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4293980
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorKerim Koc
    date accessioned2023-11-27T23:57:08Z
    date available2023-11-27T23:57:08Z
    date issued6/30/2023 12:00:00 AM
    date issued2023-06-30
    identifier otherJMENEA.MEENG-5492.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4293980
    description abstractA public–private partnership (PPP) is a common procurement model implemented worldwide as a catalyst for economic growth and improved public infrastructure. However, due to their inherent characteristics, the risk of failure in some PPP projects is high, causing heavy losses to both entities. Despite distinctive progress being made in PPP projects to reduce their failure probability, there is no proper and effective framework to predict PPP project failure in advance in either developing or in developed countries. The present study aims to develop a machine learning (ML) model to predict the failure of PPP projects to prosper in adverse conditions. This research addresses two critical issues, i.e., class imbalance and interpretability of ML models, that differentiate the current study from data-driven studies to date. First, existing studies usually focused on comparing and selecting the most adequate ML methods, but this study distinctively compared the performances of nine data resampling algorithms. Besides, in order to enhance the interpretability and visibility of the proposed model, a game theory–based feature investigation algorithm, Shapley additive explanations (SHAP), was used to identify not only the most significant features, but also the conditions of the features that cause failure or success in PPP projects. The findings illustrate that the proposed model yielded the highest prediction performance once the data set was resampled with the support vector machine-synthetic minority oversampling technique (SVM-SMOTE). SHAP analysis further shows that unsolicited proposals, domestic credit to the private sector, and project type/subtype have significant impacts on the prediction rationale. Overall, this study contributes to theory through incorporating resampling methods and SHAP algorithm into ML models as well as to practice with an advanced and reliable model to predict the status of PPP projects. The data-driven model and findings are expected to respond to current policy and industry needs by proposing a robust decision-making input for detecting risky PPP projects, allocating resources more effectively based on the most critical failure factors, and promoting the transparency of PPP project outcomes.
    publisherASCE
    titleRole of Shapley Additive Explanations and Resampling Algorithms for Contract Failure Prediction of Public–Private Partnership Projects
    typeJournal Article
    journal volume39
    journal issue5
    journal titleJournal of Management in Engineering
    identifier doi10.1061/JMENEA.MEENG-5492
    journal fristpage04023031-1
    journal lastpage04023031-23
    page23
    treeJournal of Management in Engineering:;2023:;Volume ( 039 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian