YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Data-Driven Analysis of Construction Bidding Stage–Related Causes of Disputes

    Source: Journal of Management in Engineering:;2023:;Volume ( 039 ):;issue: 005::page 04023026-1
    Author:
    Muaz O. Ahmed
    ,
    Islam H. El-adaway
    DOI: 10.1061/JMENEA.MEENG-5426
    Publisher: ASCE
    Abstract: Construction bidding is a complex process that involves several potential risks and uncertainties for all the stakeholders involved. Such complexities, risks, and uncertainties, if uncontrolled, can lead to the rise of claims, conflicts, and disputes during the course of a project. Even though a substantial amount of knowledge has been acquired about construction disputes and their causation, there is a lack of research that examines the causes of disputes associated with the bidding phase of projects. This study addresses this knowledge gap within the context of infrastructure projects. In investigating and analyzing the causation of disputes related to the bidding stage, the authors implemented a multistep research methodology that incorporated data collection, network analysis (NA), spectral clustering, and association rule analysis (ARA). Based on a manual content analysis of 94 legal cases, the authors identified a comprehensive list of 27 causes of disputes associated with the bidding stage of infrastructure projects. The NA results indicated that the major common causes leading to disputes in infrastructure projects comprise inaccurate cost estimates, inappropriate tender documents, nonproper or untimely notification of errors in a submitted bid, nonproper or untimely notification of errors in tender documents, and noncompliance with Request for Proposals’ (RFP) requirements. Upon categorizing and clustering the causes of disputes, the ARA results revealed that the most critical associations are related to differing site conditions, errors in submitted bids, unbalanced bidding, errors in cost estimates, and errors in tender documents. This study promotes an in-depth understanding of the causes of disputes associated with the bidding phase within the context of infrastructure projects, which should better enable the establishment of proactive plans and practices to control these causes as well as mitigate the occurrence of their associated disputes during project execution.
    • Download: (1.614Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Data-Driven Analysis of Construction Bidding Stage–Related Causes of Disputes

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4293975
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorMuaz O. Ahmed
    contributor authorIslam H. El-adaway
    date accessioned2023-11-27T23:56:47Z
    date available2023-11-27T23:56:47Z
    date issued6/6/2023 12:00:00 AM
    date issued2023-06-06
    identifier otherJMENEA.MEENG-5426.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4293975
    description abstractConstruction bidding is a complex process that involves several potential risks and uncertainties for all the stakeholders involved. Such complexities, risks, and uncertainties, if uncontrolled, can lead to the rise of claims, conflicts, and disputes during the course of a project. Even though a substantial amount of knowledge has been acquired about construction disputes and their causation, there is a lack of research that examines the causes of disputes associated with the bidding phase of projects. This study addresses this knowledge gap within the context of infrastructure projects. In investigating and analyzing the causation of disputes related to the bidding stage, the authors implemented a multistep research methodology that incorporated data collection, network analysis (NA), spectral clustering, and association rule analysis (ARA). Based on a manual content analysis of 94 legal cases, the authors identified a comprehensive list of 27 causes of disputes associated with the bidding stage of infrastructure projects. The NA results indicated that the major common causes leading to disputes in infrastructure projects comprise inaccurate cost estimates, inappropriate tender documents, nonproper or untimely notification of errors in a submitted bid, nonproper or untimely notification of errors in tender documents, and noncompliance with Request for Proposals’ (RFP) requirements. Upon categorizing and clustering the causes of disputes, the ARA results revealed that the most critical associations are related to differing site conditions, errors in submitted bids, unbalanced bidding, errors in cost estimates, and errors in tender documents. This study promotes an in-depth understanding of the causes of disputes associated with the bidding phase within the context of infrastructure projects, which should better enable the establishment of proactive plans and practices to control these causes as well as mitigate the occurrence of their associated disputes during project execution.
    publisherASCE
    titleData-Driven Analysis of Construction Bidding Stage–Related Causes of Disputes
    typeJournal Article
    journal volume39
    journal issue5
    journal titleJournal of Management in Engineering
    identifier doi10.1061/JMENEA.MEENG-5426
    journal fristpage04023026-1
    journal lastpage04023026-19
    page19
    treeJournal of Management in Engineering:;2023:;Volume ( 039 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian