YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Materials in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Materials in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Anchorage Performance of Multiple Split Grouting of Prestressed Anchor Cable

    Source: Journal of Materials in Civil Engineering:;2023:;Volume ( 035 ):;issue: 011::page 04023409-1
    Author:
    Peng Wang
    ,
    Yulong Li
    ,
    Meicheng Shi
    ,
    Zhongwen Yue
    ,
    Shuyi Ma
    ,
    Jixiang Wang
    ,
    Akang Li
    DOI: 10.1061/JMCEE7.MTENG-15604
    Publisher: ASCE
    Abstract: In order to study the influence of split grouting times on the anchorage performance of prestressed anchor cable, a field test of multisplit grouting was carried out using fiber Bragg grating monitoring technology. The ultimate bearing capacity, displacement, axial force, and shear stress distribution of the anchor cable under different split grouting times were studied. The test results show that (1) compared with conventional grouting methods, multiple split grouting can increase the bearing capacity of the anchor cable by two to three times, and the improvement effect is most obvious in secondary grouting; (2) the number of split grouts has no effect on the axial force of the anchorage section and does not change the shear stress distribution of the anchorage section. The axial and shear stresses of the anchor cable are mainly concentrated at the first 8 m of the anchorage section. With the increasing tension load, debonding and sliding will occur at the front of the anchorage section, and the peak shear stress will move to the depth of the anchorage section. (3) When the anchor cable fails, the total displacement increases with the increase in splitting and grouting times. The conventional grouting anchor cable begins to produce plastic displacement early, while the plastic displacement of the split grouting anchor cable occurs when the external load is close to the failure load. (4) The multiple high-pressure split grouting technology is applicable to the reinforcement of foundation pits or slope engineering and is a valuable support and reinforcement technology.
    • Download: (2.546Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Anchorage Performance of Multiple Split Grouting of Prestressed Anchor Cable

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4293859
    Collections
    • Journal of Materials in Civil Engineering

    Show full item record

    contributor authorPeng Wang
    contributor authorYulong Li
    contributor authorMeicheng Shi
    contributor authorZhongwen Yue
    contributor authorShuyi Ma
    contributor authorJixiang Wang
    contributor authorAkang Li
    date accessioned2023-11-27T23:48:30Z
    date available2023-11-27T23:48:30Z
    date issued8/29/2023 12:00:00 AM
    date issued2023-08-29
    identifier otherJMCEE7.MTENG-15604.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4293859
    description abstractIn order to study the influence of split grouting times on the anchorage performance of prestressed anchor cable, a field test of multisplit grouting was carried out using fiber Bragg grating monitoring technology. The ultimate bearing capacity, displacement, axial force, and shear stress distribution of the anchor cable under different split grouting times were studied. The test results show that (1) compared with conventional grouting methods, multiple split grouting can increase the bearing capacity of the anchor cable by two to three times, and the improvement effect is most obvious in secondary grouting; (2) the number of split grouts has no effect on the axial force of the anchorage section and does not change the shear stress distribution of the anchorage section. The axial and shear stresses of the anchor cable are mainly concentrated at the first 8 m of the anchorage section. With the increasing tension load, debonding and sliding will occur at the front of the anchorage section, and the peak shear stress will move to the depth of the anchorage section. (3) When the anchor cable fails, the total displacement increases with the increase in splitting and grouting times. The conventional grouting anchor cable begins to produce plastic displacement early, while the plastic displacement of the split grouting anchor cable occurs when the external load is close to the failure load. (4) The multiple high-pressure split grouting technology is applicable to the reinforcement of foundation pits or slope engineering and is a valuable support and reinforcement technology.
    publisherASCE
    titleAnchorage Performance of Multiple Split Grouting of Prestressed Anchor Cable
    typeJournal Article
    journal volume35
    journal issue11
    journal titleJournal of Materials in Civil Engineering
    identifier doi10.1061/JMCEE7.MTENG-15604
    journal fristpage04023409-1
    journal lastpage04023409-10
    page10
    treeJournal of Materials in Civil Engineering:;2023:;Volume ( 035 ):;issue: 011
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian