YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Time of the Essence in Building Contracts

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2022:;Volume ( 015 ):;issue: 002::page 04522060-1
    Author:
    Mohamad El Daouk
    DOI: 10.1061/JLADAH.LADR-949
    Publisher: ASCE
    Abstract: This study examined the doctrine of time of the essence and how the UK courts interpret it in the sphere of building contracts. In a wide sample of cases heard before the UK courts, this study looked at the literal and legal meanings of time of the essence, especially when the phrase was incorporated into contracts, and when a party can utilize it if their counterpart fails to honor their contractual obligations. Time of the essence is a doctrine with a long and interesting history. Yet, the doctrine either tends to be briefly covered in leading authorities on construction law or gets diluted alongside the doctrines of repudiation and time at large, ultimately muffling the doctrine without any apposite explanation of its full effect in a construction law context. The background of this study rests on the need to enunciate the doctrine and expound on the viewpoints of UK legal practitioners regarding time as not being of the essence in building contracts. In practice, time tends to be essential only for particular contractual provisions, not the entire contract. Therefore, the aim of this study was to solely focus on the doctrine of time of the essence in building contracts, explaining the meaning of the doctrine, why it has a limited scope under building contracts, discerning situations in which its unwarranted stipulation under a building contract can lead to inadvertent outcomes, and showing why UK courts render time as not being of the essence when posed with the question of whether time is (or is not) of the essence in building contracts. The study methodology entailed electronically accessing the LexisNexis legal database to take out a chronological sample of cases heard before the UK courts that covered the doctrine of time of the essence in the context of building contracts. Because of a lack of journal articles focusing on this topic, the study also reviewed the leading legal authorities on construction and contract law. The study demonstrated that time is generally not of the essence in building contracts. In theory, time may be rendered as being of the essence in any contract in which it is expressly stipulated under the contract, implied, or when a notice is served rendering it as such. Yet, in the context of building contracts, the nature in which these conditions must be satisfied and the practical dynamic of building arrangements as a whole are very peculiar, making it highly unlikely for a court to find time to be of the essence. This study investigated the importance and cruciality of time clauses in building contracts. It is accepted that meeting contractual deadlines is fundamental for the continuity of a contract. However, this is not the case in building contracts. It is generally understood that time is not crucial for the continuity of building contracts; this has been mentioned by various leading legal authorities. Yet no thorough explanation has been made as to when, how, and why building contracts became unique among many, if not most, other types of contracts. Therefore, this study went back to early cases to chronologically expound on how time became less crucial for the continuity of building contracts. The study, provides different building-contract settings and demonstrates how the configuration of building contracts within or alongside other agreements may change the degree of time’s cruciality. This study will support project practitioners when they stipulate time clauses in their contracts, enabling them to have a well-rounded idea of what to expect and what to do should their time clauses be breached.
    • Download: (185.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Time of the Essence in Building Contracts

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4293692
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorMohamad El Daouk
    date accessioned2023-11-27T23:35:41Z
    date available2023-11-27T23:35:41Z
    date issued12/19/2022 12:00:00 AM
    identifier otherJLADAH.LADR-949.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4293692
    description abstractThis study examined the doctrine of time of the essence and how the UK courts interpret it in the sphere of building contracts. In a wide sample of cases heard before the UK courts, this study looked at the literal and legal meanings of time of the essence, especially when the phrase was incorporated into contracts, and when a party can utilize it if their counterpart fails to honor their contractual obligations. Time of the essence is a doctrine with a long and interesting history. Yet, the doctrine either tends to be briefly covered in leading authorities on construction law or gets diluted alongside the doctrines of repudiation and time at large, ultimately muffling the doctrine without any apposite explanation of its full effect in a construction law context. The background of this study rests on the need to enunciate the doctrine and expound on the viewpoints of UK legal practitioners regarding time as not being of the essence in building contracts. In practice, time tends to be essential only for particular contractual provisions, not the entire contract. Therefore, the aim of this study was to solely focus on the doctrine of time of the essence in building contracts, explaining the meaning of the doctrine, why it has a limited scope under building contracts, discerning situations in which its unwarranted stipulation under a building contract can lead to inadvertent outcomes, and showing why UK courts render time as not being of the essence when posed with the question of whether time is (or is not) of the essence in building contracts. The study methodology entailed electronically accessing the LexisNexis legal database to take out a chronological sample of cases heard before the UK courts that covered the doctrine of time of the essence in the context of building contracts. Because of a lack of journal articles focusing on this topic, the study also reviewed the leading legal authorities on construction and contract law. The study demonstrated that time is generally not of the essence in building contracts. In theory, time may be rendered as being of the essence in any contract in which it is expressly stipulated under the contract, implied, or when a notice is served rendering it as such. Yet, in the context of building contracts, the nature in which these conditions must be satisfied and the practical dynamic of building arrangements as a whole are very peculiar, making it highly unlikely for a court to find time to be of the essence. This study investigated the importance and cruciality of time clauses in building contracts. It is accepted that meeting contractual deadlines is fundamental for the continuity of a contract. However, this is not the case in building contracts. It is generally understood that time is not crucial for the continuity of building contracts; this has been mentioned by various leading legal authorities. Yet no thorough explanation has been made as to when, how, and why building contracts became unique among many, if not most, other types of contracts. Therefore, this study went back to early cases to chronologically expound on how time became less crucial for the continuity of building contracts. The study, provides different building-contract settings and demonstrates how the configuration of building contracts within or alongside other agreements may change the degree of time’s cruciality. This study will support project practitioners when they stipulate time clauses in their contracts, enabling them to have a well-rounded idea of what to expect and what to do should their time clauses be breached.
    publisherASCE
    titleTime of the Essence in Building Contracts
    typeJournal Article
    journal volume15
    journal issue2
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/JLADAH.LADR-949
    journal fristpage04522060-1
    journal lastpage04522060-9
    page9
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2022:;Volume ( 015 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian