YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Implementing Progressive Design Build: Enabling Legislation May Not Be Required

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2023:;Volume ( 015 ):;issue: 004::page 04523033-1
    Author:
    Douglas D. Gransberg
    DOI: 10.1061/JLADAH.LADR-1015
    Publisher: ASCE
    Abstract: State-level legislation authorizing the use of alternative delivery is as diverse as the nation itself, and this paper reports on a benchmarking study aimed at identifying the content of the state statutes under which departments of transportation have implemented progressive design-build (PDB). PDB differs from classic DB procurement in that the contract is awarded principally on a basis of qualifications and past performance with the cost of design and construction being negotiated in much the same manner as construction manager-at-risk (CMAR) or construction manager/general contractor (CMGC). The major challenge for a public agency is to demonstrate value for money without a bid price. The study looked at enabling legislation from states that were authorized to use alternative delivery methods. The paper’s key contribution finds that PDB can be successfully implemented using a wide variety of approaches with different degrees of legislative constraints, including using existing DB authority without explicit PDB changes. Three summary case studies are provided to illustrate the spectrum of current approaches. The findings in this study indicate that agencies that are interested in implementing PDB should not automatically assume that explicit enabling legislation will be required. Before making that decision, the constraints extant in current DB legislation should be thoroughly explored and a determination by legal counsel be made as to whether PDB is inherently authorized, like the Utah DOT Case or if the current legislation can be modified by an administrative process as occurred in the Virginia DOT case. The investment in time in resources to identify possible alternatives short of introducing new legislation may potentially payoff in terms of being able to implement PDB earlier than thought.
    • Download: (720.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Implementing Progressive Design Build: Enabling Legislation May Not Be Required

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4293686
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorDouglas D. Gransberg
    date accessioned2023-11-27T23:35:24Z
    date available2023-11-27T23:35:24Z
    date issued7/25/2023 12:00:00 AM
    date issued2023-07-25
    identifier otherJLADAH.LADR-1015.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4293686
    description abstractState-level legislation authorizing the use of alternative delivery is as diverse as the nation itself, and this paper reports on a benchmarking study aimed at identifying the content of the state statutes under which departments of transportation have implemented progressive design-build (PDB). PDB differs from classic DB procurement in that the contract is awarded principally on a basis of qualifications and past performance with the cost of design and construction being negotiated in much the same manner as construction manager-at-risk (CMAR) or construction manager/general contractor (CMGC). The major challenge for a public agency is to demonstrate value for money without a bid price. The study looked at enabling legislation from states that were authorized to use alternative delivery methods. The paper’s key contribution finds that PDB can be successfully implemented using a wide variety of approaches with different degrees of legislative constraints, including using existing DB authority without explicit PDB changes. Three summary case studies are provided to illustrate the spectrum of current approaches. The findings in this study indicate that agencies that are interested in implementing PDB should not automatically assume that explicit enabling legislation will be required. Before making that decision, the constraints extant in current DB legislation should be thoroughly explored and a determination by legal counsel be made as to whether PDB is inherently authorized, like the Utah DOT Case or if the current legislation can be modified by an administrative process as occurred in the Virginia DOT case. The investment in time in resources to identify possible alternatives short of introducing new legislation may potentially payoff in terms of being able to implement PDB earlier than thought.
    publisherASCE
    titleImplementing Progressive Design Build: Enabling Legislation May Not Be Required
    typeJournal Article
    journal volume15
    journal issue4
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/JLADAH.LADR-1015
    journal fristpage04523033-1
    journal lastpage04523033-9
    page9
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2023:;Volume ( 015 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian