YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Realizing a Quick Partial BIM Update of Subgrade in Railway Stations

    Source: Journal of Construction Engineering and Management:;2023:;Volume ( 149 ):;issue: 009::page 04023073-1
    Author:
    Hao Pu
    ,
    Xiaomeng Fan
    ,
    Wei Li
    ,
    Wei Zhang
    ,
    Paul Schonfeld
    ,
    Fanghua Wei
    ,
    Zhanjun Xu
    DOI: 10.1061/JCEMD4.COENG-13359
    Publisher: ASCE
    Abstract: A railway station subgrade (RSS) is a complex earth structure for supporting various railway facilities and its building information modeling (BIM) is an essential task in a railway station project. During the entire life cycle of an RSS BIM model, it will be frequently updated according to the progress of the project. However, the current way of updating an RSS model is commonly conducted in a complete rebuild, which is very inefficient and time-consuming. To address this issue, we propose a novel approach for realizing a partial BIM update driven by model changes, through which a quick update for an existing RSS BIM model can be achieved. A partial updating strategy that is triggered by a model change is developed to locate a minimum influenced domain of the original model and update it in that domain. An actual railway station case is used for demonstrating the validity of the approach, through which a quick partial update to an existing RSS model is achieved by skipping the redundant computations in the process of a complete rebuild.
    • Download: (4.822Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Realizing a Quick Partial BIM Update of Subgrade in Railway Stations

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4293447
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorHao Pu
    contributor authorXiaomeng Fan
    contributor authorWei Li
    contributor authorWei Zhang
    contributor authorPaul Schonfeld
    contributor authorFanghua Wei
    contributor authorZhanjun Xu
    date accessioned2023-11-27T23:16:53Z
    date available2023-11-27T23:16:53Z
    date issued6/19/2023 12:00:00 AM
    date issued2023-06-19
    identifier otherJCEMD4.COENG-13359.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4293447
    description abstractA railway station subgrade (RSS) is a complex earth structure for supporting various railway facilities and its building information modeling (BIM) is an essential task in a railway station project. During the entire life cycle of an RSS BIM model, it will be frequently updated according to the progress of the project. However, the current way of updating an RSS model is commonly conducted in a complete rebuild, which is very inefficient and time-consuming. To address this issue, we propose a novel approach for realizing a partial BIM update driven by model changes, through which a quick update for an existing RSS BIM model can be achieved. A partial updating strategy that is triggered by a model change is developed to locate a minimum influenced domain of the original model and update it in that domain. An actual railway station case is used for demonstrating the validity of the approach, through which a quick partial update to an existing RSS model is achieved by skipping the redundant computations in the process of a complete rebuild.
    publisherASCE
    titleRealizing a Quick Partial BIM Update of Subgrade in Railway Stations
    typeJournal Article
    journal volume149
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-13359
    journal fristpage04023073-1
    journal lastpage04023073-17
    page17
    treeJournal of Construction Engineering and Management:;2023:;Volume ( 149 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian