YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Using Machine Learning to Improve Cost and Duration Prediction Accuracy in Green Building Projects

    Source: Journal of Construction Engineering and Management:;2023:;Volume ( 149 ):;issue: 008::page 04023061-1
    Author:
    Amos Darko
    ,
    Iuliia Glushakova
    ,
    Emmanuel B. Boateng
    ,
    Albert P. C. Chan
    DOI: 10.1061/JCEMD4.COENG-13101
    Publisher: ASCE
    Abstract: A major source of risk in green building projects (GBPs) is inaccurate human prediction of the final project cost and duration, which in turn results in cost and schedule overruns (i.e., poor project performance). This paper presents promising new models to mitigate such risk based upon machine learning (ML). Historical data from 198 GBPs in Hong Kong were used to develop and train two fully connected deep neural networks (DNN) models to learn and predict cost and duration, respectively, based on green building rating (GBR) and other project parameters. The models can predict cost and duration with mean absolute percentage error (MAPE) values of 0.07 and 0.09, respectively. They were then integrated with support vector regression (SVR), and results indicated that the integrated DNN-SVR models improve prediction accuracy, decreasing the MAPE from 0.07 to 0.06 (cost) and 0.09 to 0.07 (duration), respectively. The validated models were for the first time deployed as a ML-based web application for automated, fast, and accurate GBP cost and duration prediction. The feature importance analysis results revealed that the most influential parameters on the GBP cost and duration are project area and weather, respectively, not the GBR. Theoretically, the outcomes of this study provide new insights into the impact of GBR on project cost and duration, which are useful for the promotion of GBPs to improve sustainability. Practically, the study provides policymakers and practitioners with novel ML-based models and a web application to improve GBP delivery performance. Green building projects help to combat climate change and improve our health, wellbeing, and quality of life, but they face two key challenges in their execution: cost overruns and schedule delays. To address these challenges, there is a need for accurate prediction of the final project cost and duration from the early stages of the project. The practical relevance of this study is in the development of the first data-driven and machine learning-based web application for addressing this need. New integrated optimized machine learning models are developed. For practitioners to have access to and use these models without the need to possess machine learning expertise, a corresponding easy-to-use web application is offered. From the design and construction stages of their project, practitioners only need to input the green building ratings in sustainable site, materials and waste, energy use, water use, health and wellbeing, and innovations and additions they want to achieve for the project. The project type and area (type and size), original budget, planned duration, and start month (SM) and year should also be input. Once this project data input is completed, the web application automatically and instantaneously predicts with a high level of accuracy the total costs and time needed to deliver the project successfully—on time and on budget. These cost and duration prediction outputs are a valuable tool in helping practitioners adjust green building project plans and budgets to develop more realistic and accurate project budgets and programs to avoid cost overruns and schedule delays.
    • Download: (2.165Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Using Machine Learning to Improve Cost and Duration Prediction Accuracy in Green Building Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4293426
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAmos Darko
    contributor authorIuliia Glushakova
    contributor authorEmmanuel B. Boateng
    contributor authorAlbert P. C. Chan
    date accessioned2023-11-27T23:15:48Z
    date available2023-11-27T23:15:48Z
    date issued5/22/2023 12:00:00 AM
    date issued2023-05-22
    identifier otherJCEMD4.COENG-13101.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4293426
    description abstractA major source of risk in green building projects (GBPs) is inaccurate human prediction of the final project cost and duration, which in turn results in cost and schedule overruns (i.e., poor project performance). This paper presents promising new models to mitigate such risk based upon machine learning (ML). Historical data from 198 GBPs in Hong Kong were used to develop and train two fully connected deep neural networks (DNN) models to learn and predict cost and duration, respectively, based on green building rating (GBR) and other project parameters. The models can predict cost and duration with mean absolute percentage error (MAPE) values of 0.07 and 0.09, respectively. They were then integrated with support vector regression (SVR), and results indicated that the integrated DNN-SVR models improve prediction accuracy, decreasing the MAPE from 0.07 to 0.06 (cost) and 0.09 to 0.07 (duration), respectively. The validated models were for the first time deployed as a ML-based web application for automated, fast, and accurate GBP cost and duration prediction. The feature importance analysis results revealed that the most influential parameters on the GBP cost and duration are project area and weather, respectively, not the GBR. Theoretically, the outcomes of this study provide new insights into the impact of GBR on project cost and duration, which are useful for the promotion of GBPs to improve sustainability. Practically, the study provides policymakers and practitioners with novel ML-based models and a web application to improve GBP delivery performance. Green building projects help to combat climate change and improve our health, wellbeing, and quality of life, but they face two key challenges in their execution: cost overruns and schedule delays. To address these challenges, there is a need for accurate prediction of the final project cost and duration from the early stages of the project. The practical relevance of this study is in the development of the first data-driven and machine learning-based web application for addressing this need. New integrated optimized machine learning models are developed. For practitioners to have access to and use these models without the need to possess machine learning expertise, a corresponding easy-to-use web application is offered. From the design and construction stages of their project, practitioners only need to input the green building ratings in sustainable site, materials and waste, energy use, water use, health and wellbeing, and innovations and additions they want to achieve for the project. The project type and area (type and size), original budget, planned duration, and start month (SM) and year should also be input. Once this project data input is completed, the web application automatically and instantaneously predicts with a high level of accuracy the total costs and time needed to deliver the project successfully—on time and on budget. These cost and duration prediction outputs are a valuable tool in helping practitioners adjust green building project plans and budgets to develop more realistic and accurate project budgets and programs to avoid cost overruns and schedule delays.
    publisherASCE
    titleUsing Machine Learning to Improve Cost and Duration Prediction Accuracy in Green Building Projects
    typeJournal Article
    journal volume149
    journal issue8
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/JCEMD4.COENG-13101
    journal fristpage04023061-1
    journal lastpage04023061-21
    page21
    treeJournal of Construction Engineering and Management:;2023:;Volume ( 149 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian