A Fully Precast Pier System for Accelerated Bridge Construction in Seismic RegionsSource: Journal of Bridge Engineering:;2023:;Volume ( 028 ):;issue: 010::page 04023068-1DOI: 10.1061/JBENF2.BEENG-6154Publisher: ASCE
Abstract: As the demands on the country’s aging infrastructure continue to grow, new methods of construction that prioritize speed of construction, reliability, and environmental impact will have an outsized impact on how the country rebuilds and rehabilitates its infrastructure. Accelerated bridge construction or ABC for short, is one such method that is already being implemented in many states in the United States, such as Idaho. Precast concrete offers many advantages for ABC. The use of precast concrete for bridge substructures in seismic regions is of great interest but the required detailing of connections needed to sustain the forces and displacements generated by earthquakes is a challenge. In addition, having adequate construction tolerance between precast elements is important. As such, this research proposes a new fully precast pier system that employs ABC methods for applications in seismic regions. The system offers many advantages, in addition to better construction tolerances compared with some previously investigated connections between precast elements. The seismic performance of the system is experimentally investigated using large-scale structural testing and subsequently compared to the benchmark cast-in-place (CIP) specimens. The proposed precast system uses structural steel tubes (pipes) filled with concrete in the plastic hinge zones that are meant to serve as seismic energy dissipaters enhancing the structural performance of the pier. In this type of connection, the concrete filled steel pipe provides shear/flexural resistance as well as confinement to the concrete at the plastic hinge. Results from the large-scale structural testing of the proposed ABC precast pier and benchmark CIP pier showed that the former outperformed the latter in various aspects. Given the superior performance of the precast system investigated in this research, it has been implemented in a bridge in Idaho located in an area of high seismicity.
|
Collections
Show full item record
contributor author | Mahesh Acharya | |
contributor author | Jose Duran | |
contributor author | Arya Ebrahimpour | |
contributor author | Jared Cantrell | |
contributor author | Mustafa Mashal | |
date accessioned | 2023-11-27T23:09:30Z | |
date available | 2023-11-27T23:09:30Z | |
date issued | 10/1/2023 12:00:00 AM | |
date issued | 2023-10-01 | |
identifier other | JBENF2.BEENG-6154.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4293340 | |
description abstract | As the demands on the country’s aging infrastructure continue to grow, new methods of construction that prioritize speed of construction, reliability, and environmental impact will have an outsized impact on how the country rebuilds and rehabilitates its infrastructure. Accelerated bridge construction or ABC for short, is one such method that is already being implemented in many states in the United States, such as Idaho. Precast concrete offers many advantages for ABC. The use of precast concrete for bridge substructures in seismic regions is of great interest but the required detailing of connections needed to sustain the forces and displacements generated by earthquakes is a challenge. In addition, having adequate construction tolerance between precast elements is important. As such, this research proposes a new fully precast pier system that employs ABC methods for applications in seismic regions. The system offers many advantages, in addition to better construction tolerances compared with some previously investigated connections between precast elements. The seismic performance of the system is experimentally investigated using large-scale structural testing and subsequently compared to the benchmark cast-in-place (CIP) specimens. The proposed precast system uses structural steel tubes (pipes) filled with concrete in the plastic hinge zones that are meant to serve as seismic energy dissipaters enhancing the structural performance of the pier. In this type of connection, the concrete filled steel pipe provides shear/flexural resistance as well as confinement to the concrete at the plastic hinge. Results from the large-scale structural testing of the proposed ABC precast pier and benchmark CIP pier showed that the former outperformed the latter in various aspects. Given the superior performance of the precast system investigated in this research, it has been implemented in a bridge in Idaho located in an area of high seismicity. | |
publisher | ASCE | |
title | A Fully Precast Pier System for Accelerated Bridge Construction in Seismic Regions | |
type | Journal Article | |
journal volume | 28 | |
journal issue | 10 | |
journal title | Journal of Bridge Engineering | |
identifier doi | 10.1061/JBENF2.BEENG-6154 | |
journal fristpage | 04023068-1 | |
journal lastpage | 04023068-23 | |
page | 23 | |
tree | Journal of Bridge Engineering:;2023:;Volume ( 028 ):;issue: 010 | |
contenttype | Fulltext |