YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Investigating the Impact of Alternative Technical Concepts for Project Delivery of Accelerated Bridge Construction

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2023:;Volume ( 015 ):;issue: 002::page 04522059-1
    Author:
    Piyush Pradhananga
    ,
    Mohamed ElZomor
    ,
    Ghada M. Gada
    DOI: 10.1061/JLADAH.LADR-909
    Publisher: American Society of Civil Engineers
    Abstract: Accelerated bridge construction (ABC) is an off-site construction approach that reduces construction time, traffic disruption, and safety hazards on construction sites. However, the acceptance of this off-site methodology is challenged by many obstacles, including high initial cost, inexperienced contractors and manufacturers, and a lack of early contractor involvement. An alternative technical concept (ATC) is a proposal made during the bidding or procurement process with an equal or better alternative in the baseline project design. It allows for early contractor involvement and risk mitigation during the bidding stage. This study aims to highlight and provide a metric that supports ABC stakeholders in recognizing the merits of using ATCs during the bidding stage on ABC projects. To achieve this goal, this study utilizes a qualitative approach that includes (1) case studies that successfully integrated ATCs in different delivery methods of an ABC project; and (2) analysis to identify strengths, weaknesses, opportunities, and threats (SWOT) of requesting ATCs in ABC projects in comparison to the ABC projects that did not request ATCs. The qualitative results indicate that ATCs adoption in ABC projects ensures a reduction in cost, time, risks, and legal and contractual issues. Additionally, the SWOT analysis results facilitates ABC stakeholders with comprehensive knowledge about how they can take advantage of ATCs’ strengths, address weaknesses, deter threats, and capitalize on opportunities created by the adoption of ATCs within future ABC projects. The study’s findings demonstrate an innovative approach to addressing contractual and constructability challenges in ABC projects through ATCs, thereby promoting innovation, and maximizing off-site construction benefits. Currently, many departments of transportation do not have specific codes or regulations related to alternative technical concepts for accelerated bridge construction projects. As such, ABC stakeholders are either unaware or reluctant to adopt ATCs due to uncertainty of their impact on the projects’ cost, schedule, performance, and associated risks. Since very few ABC projects have successfully adopted ATCs for project delivery, the case studies documented in this study provide an understanding of the nature of the project delivery system with integration of ATCs, ways to achieve sustainability, and effective project execution. The case studies and strengths, weaknesses, opportunities, and threats matrix highlighted in this study facilitate ABC stakeholders with comprehensive knowledge about how they can take advantage of ATCs’ strengths, address weaknesses, deter threats, and capitalize on opportunities created by the adoption of ATCs within future ABC projects. Additionally, the ABC industry can benefit from the findings of this study through a comprehensive understanding of legal and contractual issues that can be avoided through the integration of confidential meetings and rigorous processes of ATCs during the project delivery of ABC projects. Therefore, this study contributes to the construction management body of knowledge by increasing awareness and providing strategies for exploiting the benefits of ATCs, reducing legal and contractual issues, as well as improving management practices that affect the implementation of ATCs for project delivery of ABC projects.
    • Download: (433.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Investigating the Impact of Alternative Technical Concepts for Project Delivery of Accelerated Bridge Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4292873
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorPiyush Pradhananga
    contributor authorMohamed ElZomor
    contributor authorGhada M. Gada
    date accessioned2023-08-16T19:10:22Z
    date available2023-08-16T19:10:22Z
    date issued2023/05/01
    identifier otherJLADAH.LADR-909.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4292873
    description abstractAccelerated bridge construction (ABC) is an off-site construction approach that reduces construction time, traffic disruption, and safety hazards on construction sites. However, the acceptance of this off-site methodology is challenged by many obstacles, including high initial cost, inexperienced contractors and manufacturers, and a lack of early contractor involvement. An alternative technical concept (ATC) is a proposal made during the bidding or procurement process with an equal or better alternative in the baseline project design. It allows for early contractor involvement and risk mitigation during the bidding stage. This study aims to highlight and provide a metric that supports ABC stakeholders in recognizing the merits of using ATCs during the bidding stage on ABC projects. To achieve this goal, this study utilizes a qualitative approach that includes (1) case studies that successfully integrated ATCs in different delivery methods of an ABC project; and (2) analysis to identify strengths, weaknesses, opportunities, and threats (SWOT) of requesting ATCs in ABC projects in comparison to the ABC projects that did not request ATCs. The qualitative results indicate that ATCs adoption in ABC projects ensures a reduction in cost, time, risks, and legal and contractual issues. Additionally, the SWOT analysis results facilitates ABC stakeholders with comprehensive knowledge about how they can take advantage of ATCs’ strengths, address weaknesses, deter threats, and capitalize on opportunities created by the adoption of ATCs within future ABC projects. The study’s findings demonstrate an innovative approach to addressing contractual and constructability challenges in ABC projects through ATCs, thereby promoting innovation, and maximizing off-site construction benefits. Currently, many departments of transportation do not have specific codes or regulations related to alternative technical concepts for accelerated bridge construction projects. As such, ABC stakeholders are either unaware or reluctant to adopt ATCs due to uncertainty of their impact on the projects’ cost, schedule, performance, and associated risks. Since very few ABC projects have successfully adopted ATCs for project delivery, the case studies documented in this study provide an understanding of the nature of the project delivery system with integration of ATCs, ways to achieve sustainability, and effective project execution. The case studies and strengths, weaknesses, opportunities, and threats matrix highlighted in this study facilitate ABC stakeholders with comprehensive knowledge about how they can take advantage of ATCs’ strengths, address weaknesses, deter threats, and capitalize on opportunities created by the adoption of ATCs within future ABC projects. Additionally, the ABC industry can benefit from the findings of this study through a comprehensive understanding of legal and contractual issues that can be avoided through the integration of confidential meetings and rigorous processes of ATCs during the project delivery of ABC projects. Therefore, this study contributes to the construction management body of knowledge by increasing awareness and providing strategies for exploiting the benefits of ATCs, reducing legal and contractual issues, as well as improving management practices that affect the implementation of ATCs for project delivery of ABC projects.
    publisherAmerican Society of Civil Engineers
    titleInvestigating the Impact of Alternative Technical Concepts for Project Delivery of Accelerated Bridge Construction
    typeJournal Article
    journal volume15
    journal issue2
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/JLADAH.LADR-909
    journal fristpage04522059-1
    journal lastpage04522059-12
    page12
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2023:;Volume ( 015 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian