YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Experimental and Numerical Study on the Dynamic Response of a Superthick Backfill Subgrade under High-Speed Railway Loading: A Case Study of Qianjiang–Zhangjiajie–Changde Railway

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 012::page 05022014
    Author:
    Jun Wang
    ,
    Jianyong Han
    ,
    Juan Chen
    ,
    Guangya Ding
    ,
    Guosen Feng
    ,
    Tongjiang Liu
    ,
    Bijun Guo
    DOI: 10.1061/(ASCE)CO.1943-7862.0002407
    Publisher: ASCE
    Abstract: In this study, a mountain tunnel of the Qianjiang–Zhangjiajie–Changde Railway, which passes through a giant karst cave at a high position, was investigated as a case study. The cave cavity height below the tunnel track is approximately 30–55 m, and the collapse accumulation thickness at the cave bottom is approximately 37–66 m. After solution comparison analysis, a superthick backfill subgrade solution was selected by filling the karst cave with a cave ballast backfill + upper grouting. In connection with railway operation, large vibrations and dynamic settlements may occur under train loads, and the safety of train operations can be compromised. To investigate the vibration response of a superthick backfill subgrade in a giant karst cave, 12 dynamically scaled model tests with a scale ratio of 1∶5 were performed with a high-speed railway subgrade dynamic test platform. The subgrade slab thickness and running speed of the train were investigated as the variable parameters. The working state of each part of the subgrade was studied while the train passed, and the time-history variation and long-term development trend of the dynamic properties were analyzed. The attenuation behaviors of vibration displacement, dynamic stress, and acceleration in the superthick backfill subgrade were analyzed using the three-dimensional finite element method. The results showed that as the thickness of the subgrade slab increased, the dynamic response of the train decreased rapidly. At a running speed of 200  km/h, the average acceleration decreased by 75.2% at the bottom of the subgrade slab when the thickness of the slab decreased from 60 to 20 cm at the initial passage. Under a long-term load, acceleration at the same depth below the subgrade slab of thickness 60 cm decreased by 69.5% compared to that of thickness 20 cm. The superthick backfill subgrade with a 3-m-thick RC subgrade slab avoided evident dynamic settlement induced by the running load. When the tunnel was opened to traffic, tunnel structure settlement was monitored. Furthermore, the settlement of the tunnel invert was <1  mm within 1 year, which was consistent with the test results. The results proved that the design parameters and solution selection were reasonable and reliable and could serve as a reference for the development of similar projects and researches. The key contribution of this research is to propose an effective and low-budget treatment for the construction of railways that pass through giant caves. In addition, the findings from the study on superthick backfill subgrades provide industry practitioners with a comprehensive guide regarding the specific applications and mechanical performance of superthick backfill subgrades, which can serve as a stepping stone to facilitate the development of construction technology in the transportation industry. The fast-growing transportation industry faces various challenges to railway construction, including the surrounding environment, geological condition, and construction technology, for example. Railway tunnels constructed in karst areas often pass through karst caves with different dimensions. The ground under tunnels needs to be treated if the tunnels pass through the caves. Backfill subgrade is a fast and low-budget construction technology. Because the mechanical properties of the backfill subgrade are different from those of the in situ ground, the working performance of the backfill subgrade, particularly the superthick backfill subgrade, must meet strict requirements. Therefore, a new and reliable construction method for superthick backfill subgrade, a solution consisting of cave ballast backfill + upper grouting, is proposed and is used for filling karst caves. To investigate the vibration response of the superthick backfill subgrade in a giant karst cave, scaled model tests, numerical investigation, and in situ observations were conducted. The study determined that superthick backfill subgrade with 3-m-thick RC subgrade slab will avoid apparent dynamic settlement induced by a running load. In addition, the settlement of the tunnel invert was <1  mm within 1 year, reflecting the good performance of the superthick backfill subgrade constructed in the case history. The findings obtained from the study provide guidance on construction technology in the transportation industry.
    • Download: (4.892Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Experimental and Numerical Study on the Dynamic Response of a Superthick Backfill Subgrade under High-Speed Railway Loading: A Case Study of Qianjiang&#x2013;Zhangjiajie&#x2013;Changde Railway

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4289552
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJun Wang
    contributor authorJianyong Han
    contributor authorJuan Chen
    contributor authorGuangya Ding
    contributor authorGuosen Feng
    contributor authorTongjiang Liu
    contributor authorBijun Guo
    date accessioned2023-04-07T00:41:25Z
    date available2023-04-07T00:41:25Z
    date issued2022/12/01
    identifier other%28ASCE%29CO.1943-7862.0002407.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4289552
    description abstractIn this study, a mountain tunnel of the Qianjiang–Zhangjiajie–Changde Railway, which passes through a giant karst cave at a high position, was investigated as a case study. The cave cavity height below the tunnel track is approximately 30–55 m, and the collapse accumulation thickness at the cave bottom is approximately 37–66 m. After solution comparison analysis, a superthick backfill subgrade solution was selected by filling the karst cave with a cave ballast backfill + upper grouting. In connection with railway operation, large vibrations and dynamic settlements may occur under train loads, and the safety of train operations can be compromised. To investigate the vibration response of a superthick backfill subgrade in a giant karst cave, 12 dynamically scaled model tests with a scale ratio of 1∶5 were performed with a high-speed railway subgrade dynamic test platform. The subgrade slab thickness and running speed of the train were investigated as the variable parameters. The working state of each part of the subgrade was studied while the train passed, and the time-history variation and long-term development trend of the dynamic properties were analyzed. The attenuation behaviors of vibration displacement, dynamic stress, and acceleration in the superthick backfill subgrade were analyzed using the three-dimensional finite element method. The results showed that as the thickness of the subgrade slab increased, the dynamic response of the train decreased rapidly. At a running speed of 200  km/h, the average acceleration decreased by 75.2% at the bottom of the subgrade slab when the thickness of the slab decreased from 60 to 20 cm at the initial passage. Under a long-term load, acceleration at the same depth below the subgrade slab of thickness 60 cm decreased by 69.5% compared to that of thickness 20 cm. The superthick backfill subgrade with a 3-m-thick RC subgrade slab avoided evident dynamic settlement induced by the running load. When the tunnel was opened to traffic, tunnel structure settlement was monitored. Furthermore, the settlement of the tunnel invert was <1  mm within 1 year, which was consistent with the test results. The results proved that the design parameters and solution selection were reasonable and reliable and could serve as a reference for the development of similar projects and researches. The key contribution of this research is to propose an effective and low-budget treatment for the construction of railways that pass through giant caves. In addition, the findings from the study on superthick backfill subgrades provide industry practitioners with a comprehensive guide regarding the specific applications and mechanical performance of superthick backfill subgrades, which can serve as a stepping stone to facilitate the development of construction technology in the transportation industry. The fast-growing transportation industry faces various challenges to railway construction, including the surrounding environment, geological condition, and construction technology, for example. Railway tunnels constructed in karst areas often pass through karst caves with different dimensions. The ground under tunnels needs to be treated if the tunnels pass through the caves. Backfill subgrade is a fast and low-budget construction technology. Because the mechanical properties of the backfill subgrade are different from those of the in situ ground, the working performance of the backfill subgrade, particularly the superthick backfill subgrade, must meet strict requirements. Therefore, a new and reliable construction method for superthick backfill subgrade, a solution consisting of cave ballast backfill + upper grouting, is proposed and is used for filling karst caves. To investigate the vibration response of the superthick backfill subgrade in a giant karst cave, scaled model tests, numerical investigation, and in situ observations were conducted. The study determined that superthick backfill subgrade with 3-m-thick RC subgrade slab will avoid apparent dynamic settlement induced by a running load. In addition, the settlement of the tunnel invert was <1  mm within 1 year, reflecting the good performance of the superthick backfill subgrade constructed in the case history. The findings obtained from the study provide guidance on construction technology in the transportation industry.
    publisherASCE
    titleExperimental and Numerical Study on the Dynamic Response of a Superthick Backfill Subgrade under High-Speed Railway Loading: A Case Study of Qianjiang–Zhangjiajie–Changde Railway
    typeJournal Article
    journal volume148
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002407
    journal fristpage05022014
    journal lastpage05022014_17
    page17
    treeJournal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian