YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Project Schedule Development under Environment-Induced Time-Window Constraints: Case of Constructing River-Crossing Bridge in Remote Northern Region

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 012::page 04022129
    Author:
    Serhii Naumets
    ,
    Ming Lu
    ,
    Malika Ali
    DOI: 10.1061/(ASCE)CO.1943-7862.0002401
    Publisher: ASCE
    Abstract: A review of literature and practice indicates that there has been a lack of academic research and that there is a shortage of appropriate methods for construction planning and project scheduling for development of projects in northern and remote regions. This study proposes a new project planning method that features seamless integration of specific time-window constraints due to seasonal cycles and environmental regulations. In contrast with the established critical path method, with the proposed method there is no need to estimate each activity’s duration up front as schedule inputs. Instead, a project plan is devised analytically, satisfying all time-window constraints imposed by the environment and precedence relationships defined by construction method. The resulting allowable duration of each activity is further confirmed through activity-level planning. A case study was conducted to schedule the construction of a river-crossing bridge situated at a remote location in the northern region of Canada. Two construction methods (namely crane erection versus incremental launching) were contrasted in two application scenarios. A third application scenario investigated the effect of adjusting the time-window constraint for berm installation activities in implementing the incremental launching method. A novel project scheduling method is proposed herein to assist practitioners in planning construction activities in northern and remote regions subject to limited accessibility, seasonal cycles, and harsh environmental conditions. Current mainstream project planning methods and tools (e.g., critical path method and Primavera P6) do not adequately factor in environment-induced constraints in scheduling analysis. Therefore, the resulting project milestones, duration, and budget, which often serve as contractual commitments and baselines to assess project performance, are almost certain to be overly optimistic and unrealistic. In the proposed new method, a planner needs to specify time-window constraints due to seasonal conditions and environmental regulations. A project schedule is analytically devised, satisfying all the time-window constraints imposed by the environment and precedence relationships defined by the construction method. A case study was conducted to schedule the construction of a river-crossing bridge situated at a remote location in the northern region of Canada. The construction method of crane erection was contrasted with incremental launching while holding all activity time-window constraints identical.
    • Download: (4.304Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Project Schedule Development under Environment-Induced Time-Window Constraints: Case of Constructing River-Crossing Bridge in Remote Northern Region

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4289548
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorSerhii Naumets
    contributor authorMing Lu
    contributor authorMalika Ali
    date accessioned2023-04-07T00:41:19Z
    date available2023-04-07T00:41:19Z
    date issued2022/12/01
    identifier other%28ASCE%29CO.1943-7862.0002401.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4289548
    description abstractA review of literature and practice indicates that there has been a lack of academic research and that there is a shortage of appropriate methods for construction planning and project scheduling for development of projects in northern and remote regions. This study proposes a new project planning method that features seamless integration of specific time-window constraints due to seasonal cycles and environmental regulations. In contrast with the established critical path method, with the proposed method there is no need to estimate each activity’s duration up front as schedule inputs. Instead, a project plan is devised analytically, satisfying all time-window constraints imposed by the environment and precedence relationships defined by construction method. The resulting allowable duration of each activity is further confirmed through activity-level planning. A case study was conducted to schedule the construction of a river-crossing bridge situated at a remote location in the northern region of Canada. Two construction methods (namely crane erection versus incremental launching) were contrasted in two application scenarios. A third application scenario investigated the effect of adjusting the time-window constraint for berm installation activities in implementing the incremental launching method. A novel project scheduling method is proposed herein to assist practitioners in planning construction activities in northern and remote regions subject to limited accessibility, seasonal cycles, and harsh environmental conditions. Current mainstream project planning methods and tools (e.g., critical path method and Primavera P6) do not adequately factor in environment-induced constraints in scheduling analysis. Therefore, the resulting project milestones, duration, and budget, which often serve as contractual commitments and baselines to assess project performance, are almost certain to be overly optimistic and unrealistic. In the proposed new method, a planner needs to specify time-window constraints due to seasonal conditions and environmental regulations. A project schedule is analytically devised, satisfying all the time-window constraints imposed by the environment and precedence relationships defined by the construction method. A case study was conducted to schedule the construction of a river-crossing bridge situated at a remote location in the northern region of Canada. The construction method of crane erection was contrasted with incremental launching while holding all activity time-window constraints identical.
    publisherASCE
    titleProject Schedule Development under Environment-Induced Time-Window Constraints: Case of Constructing River-Crossing Bridge in Remote Northern Region
    typeJournal Article
    journal volume148
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002401
    journal fristpage04022129
    journal lastpage04022129_14
    page14
    treeJournal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian