YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    A Process Model for Collaboration at the Design Stage of Rail Project Delivery

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 010::page 04022105
    Author:
    Sahar Kurwi
    ,
    Peter Demian
    ,
    Tarek M. Hassan
    ,
    Karen B. Blay
    DOI: 10.1061/(ASCE)CO.1943-7862.0002355
    Publisher: ASCE
    Abstract: The absence of a clear collaboration process at the design stage of rail projects hinders the ability to provide the right information at the right time for the right purposes. The scope and complexity of rail projects make them particularly sensitive to problems arising from poor collaboration. Within projects, collaboration is a key enabler for effective decision-making and rework reduction, and this leads to time and cost savings. Strategies and technologies such as Building Information Modeling (BIM) and Geographic Information System (GIS) facilitate collaboration among project stakeholders during the asset delivery phase, but require a roadmap to ensure successful implementation. Using collaboration as a theoretical lens, and applying collaboration technologies, this paper conceptualized the collaboration processes for rail delivery with the focus on the design stage. The aim of this research was to develop a collaboration process model at the design stage of rail delivery. Ten in-depth interviews with BIM, GIS, and rail delivery experts were carried out to identify the dimensions and characteristics of the collaboration process model. The collaboration process emerging from the results was modeled using Integrated Definition (IDEF) notation, and revealed the project activities, key players’ roles, and responsibilities for effective BIM-GIS–based collaboration in the design stage of rail projects. The process was operationalized by customizing a commercial common data environment platform and was validated using a focus group and an in-depth interview to establish the trustworthiness of the theoretically modeled collaboration process for rail delivery. The precise model of the collaboration process, based on integrated use of BIM and GIS, constitutes a significant original contribution of this research. This model should facilitate smoother implementation of these technologies, timely information flows between project participants, and ultimately more-effective delivery of rail projects.
    • Download: (2.015Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      A Process Model for Collaboration at the Design Stage of Rail Project Delivery

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4289539
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorSahar Kurwi
    contributor authorPeter Demian
    contributor authorTarek M. Hassan
    contributor authorKaren B. Blay
    date accessioned2023-04-07T00:40:59Z
    date available2023-04-07T00:40:59Z
    date issued2022/10/01
    identifier other%28ASCE%29CO.1943-7862.0002355.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4289539
    description abstractThe absence of a clear collaboration process at the design stage of rail projects hinders the ability to provide the right information at the right time for the right purposes. The scope and complexity of rail projects make them particularly sensitive to problems arising from poor collaboration. Within projects, collaboration is a key enabler for effective decision-making and rework reduction, and this leads to time and cost savings. Strategies and technologies such as Building Information Modeling (BIM) and Geographic Information System (GIS) facilitate collaboration among project stakeholders during the asset delivery phase, but require a roadmap to ensure successful implementation. Using collaboration as a theoretical lens, and applying collaboration technologies, this paper conceptualized the collaboration processes for rail delivery with the focus on the design stage. The aim of this research was to develop a collaboration process model at the design stage of rail delivery. Ten in-depth interviews with BIM, GIS, and rail delivery experts were carried out to identify the dimensions and characteristics of the collaboration process model. The collaboration process emerging from the results was modeled using Integrated Definition (IDEF) notation, and revealed the project activities, key players’ roles, and responsibilities for effective BIM-GIS–based collaboration in the design stage of rail projects. The process was operationalized by customizing a commercial common data environment platform and was validated using a focus group and an in-depth interview to establish the trustworthiness of the theoretically modeled collaboration process for rail delivery. The precise model of the collaboration process, based on integrated use of BIM and GIS, constitutes a significant original contribution of this research. This model should facilitate smoother implementation of these technologies, timely information flows between project participants, and ultimately more-effective delivery of rail projects.
    publisherASCE
    titleA Process Model for Collaboration at the Design Stage of Rail Project Delivery
    typeJournal Article
    journal volume148
    journal issue10
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002355
    journal fristpage04022105
    journal lastpage04022105_15
    page15
    treeJournal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian