YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Construction Cost and Schedule Impacts Due to COVID-19

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2022:;Volume ( 014 ):;issue: 004::page 04522024
    Author:
    Krishna P. Kisi
    ,
    Tulio Sulbaran
    DOI: 10.1061/(ASCE)LA.1943-4170.0000565
    Publisher: ASCE
    Abstract: Construction companies are facing unprecedented challenges in terms of coping with the new circumstances as well as understanding their legal and contractual impacts. Because the COVID-19 pandemic affected all businesses across the globe, identifying and analyzing the impact of COVID-19 on construction projects in terms of material supply disruption, labor shortage, construction delay, and disruption in cash flow is vital. The purpose of this study is to enhance construction companies’ ability to better tackle such situations in the future by identifying and addressing the impact of COVID-19 on the material supply disruptions and construction schedule. This research used a quantitative methodology using an online questionnaire as the instrument to collect data. The study analyzed responses from 32 construction company executive members across the United States. The survey collected cost and schedule impact due to material supply disruption in building construction divisions. The analysis shows that COVID-19 pandemic impacted project schedule, increased cost, and disrupted the supply chain of building materials. The findings can provide a better understanding and solution to reduce the pandemic’s impact on the construction industry in the future and understand the legal implications that can arise due to this pandemic disruption.
    • Download: (1.213Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Construction Cost and Schedule Impacts Due to COVID-19

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4289274
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorKrishna P. Kisi
    contributor authorTulio Sulbaran
    date accessioned2023-04-07T00:33:22Z
    date available2023-04-07T00:33:22Z
    date issued2022/11/01
    identifier other%28ASCE%29LA.1943-4170.0000565.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4289274
    description abstractConstruction companies are facing unprecedented challenges in terms of coping with the new circumstances as well as understanding their legal and contractual impacts. Because the COVID-19 pandemic affected all businesses across the globe, identifying and analyzing the impact of COVID-19 on construction projects in terms of material supply disruption, labor shortage, construction delay, and disruption in cash flow is vital. The purpose of this study is to enhance construction companies’ ability to better tackle such situations in the future by identifying and addressing the impact of COVID-19 on the material supply disruptions and construction schedule. This research used a quantitative methodology using an online questionnaire as the instrument to collect data. The study analyzed responses from 32 construction company executive members across the United States. The survey collected cost and schedule impact due to material supply disruption in building construction divisions. The analysis shows that COVID-19 pandemic impacted project schedule, increased cost, and disrupted the supply chain of building materials. The findings can provide a better understanding and solution to reduce the pandemic’s impact on the construction industry in the future and understand the legal implications that can arise due to this pandemic disruption.
    publisherASCE
    titleConstruction Cost and Schedule Impacts Due to COVID-19
    typeJournal Article
    journal volume14
    journal issue4
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000565
    journal fristpage04522024
    journal lastpage04522024_8
    page8
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2022:;Volume ( 014 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian