YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Correlating Disadvantaged Business Enterprises Participation with Highway Project Performance

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2022:;Volume ( 014 ):;issue: 004::page 04522021
    Author:
    Shristy Maharjan
    ,
    Pramen P. Shrestha
    ,
    Moses Karakouzian
    DOI: 10.1061/(ASCE)LA.1943-4170.0000557
    Publisher: ASCE
    Abstract: The Code of Federal Regulations (CFR) 49 Part 26 discusses the participation of disadvantaged business enterprises (DBEs) on a state department of transportation’s highway, transit, and airport contracts. Any highway or airport project exceeding the contract value of $250,000 should have a DBE program. Generally, the statute states that no less than 10% of the authorized funds are to be expended with DBEs. Due to this requirement, the prime contractors bidding for state DOT-owned highway contracts have recently set aside some percentage of work for DBE firms. There have been no empirical studies conducted to determine the impact of DBE participation on the cost and schedule performance of these projects. Therefore, this study will focus on determining the impact of DBE participation on the cost, schedule, change order, and construction intensity performance of highway projects. The study hypothesizes that the involvement of DBEs will improve the cost and schedule performance of the highway projects. To test the hypothesis, the authors collected and analyzed data from 109 recently completed highway projects from the Nevada Department of Transportation (NDOT). The study’s results show that the schedule growth of projects that involve DBEs are significantly higher than projects that have no DBE participation. However, the change order growth of projects that involve DBEs is significantly lower than projects that have no DBE participation. The authors are collecting more data to determine the reasons for increased schedule growth and decreased change order growth on DBE-participating highway projects.
    • Download: (563.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Correlating Disadvantaged Business Enterprises Participation with Highway Project Performance

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4289272
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorShristy Maharjan
    contributor authorPramen P. Shrestha
    contributor authorMoses Karakouzian
    date accessioned2023-04-07T00:33:20Z
    date available2023-04-07T00:33:20Z
    date issued2022/11/01
    identifier other%28ASCE%29LA.1943-4170.0000557.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4289272
    description abstractThe Code of Federal Regulations (CFR) 49 Part 26 discusses the participation of disadvantaged business enterprises (DBEs) on a state department of transportation’s highway, transit, and airport contracts. Any highway or airport project exceeding the contract value of $250,000 should have a DBE program. Generally, the statute states that no less than 10% of the authorized funds are to be expended with DBEs. Due to this requirement, the prime contractors bidding for state DOT-owned highway contracts have recently set aside some percentage of work for DBE firms. There have been no empirical studies conducted to determine the impact of DBE participation on the cost and schedule performance of these projects. Therefore, this study will focus on determining the impact of DBE participation on the cost, schedule, change order, and construction intensity performance of highway projects. The study hypothesizes that the involvement of DBEs will improve the cost and schedule performance of the highway projects. To test the hypothesis, the authors collected and analyzed data from 109 recently completed highway projects from the Nevada Department of Transportation (NDOT). The study’s results show that the schedule growth of projects that involve DBEs are significantly higher than projects that have no DBE participation. However, the change order growth of projects that involve DBEs is significantly lower than projects that have no DBE participation. The authors are collecting more data to determine the reasons for increased schedule growth and decreased change order growth on DBE-participating highway projects.
    publisherASCE
    titleCorrelating Disadvantaged Business Enterprises Participation with Highway Project Performance
    typeJournal Article
    journal volume14
    journal issue4
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000557
    journal fristpage04522021
    journal lastpage04522021_9
    page9
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2022:;Volume ( 014 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian