YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Early Termination Mechanism of Public–Private Partnership Transportation Projects with Government Guarantee

    Source: Journal of Infrastructure Systems:;2022:;Volume ( 028 ):;issue: 004::page 04022037
    Author:
    Yujia He
    ,
    Lei Shi
    ,
    Zhongfu Li
    DOI: 10.1061/(ASCE)IS.1943-555X.0000720
    Publisher: ASCE
    Abstract: Governments typically provide some form of guarantee to ensure the financial viability of public–private partnership (PPP) projects confronted with traffic demand shortage. Although a number of studies have analyzed the problems associated with the optimal level of guarantee and the pricing mechanism of early termination initiated by private companies or governments, most have ignored the mechanism of early termination of PPP projects with a government guarantee. This paper proposes a government decision-making framework that enables the evaluation of optimal circumstances for the early termination of PPP transportation projects where the actual revenue falls below the minimum revenue guaranteed by the government. In particular, this study analyzes how the government can determine ex-ante whether and when to grant a private company the right to early termination as well as determine ex-post whether to voluntarily terminate the project by considering the tradeoff between social benefit and cost resulting from such a termination. This study sheds light on how to develop an early termination mechanism that can be used in conjunction with the government guarantee to deal with demand risk in PPP transportation projects.
    • Download: (1.100Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Early Termination Mechanism of Public–Private Partnership Transportation Projects with Government Guarantee

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4289269
    Collections
    • Journal of Infrastructure Systems

    Show full item record

    contributor authorYujia He
    contributor authorLei Shi
    contributor authorZhongfu Li
    date accessioned2023-04-07T00:33:17Z
    date available2023-04-07T00:33:17Z
    date issued2022/12/01
    identifier other%28ASCE%29IS.1943-555X.0000720.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4289269
    description abstractGovernments typically provide some form of guarantee to ensure the financial viability of public–private partnership (PPP) projects confronted with traffic demand shortage. Although a number of studies have analyzed the problems associated with the optimal level of guarantee and the pricing mechanism of early termination initiated by private companies or governments, most have ignored the mechanism of early termination of PPP projects with a government guarantee. This paper proposes a government decision-making framework that enables the evaluation of optimal circumstances for the early termination of PPP transportation projects where the actual revenue falls below the minimum revenue guaranteed by the government. In particular, this study analyzes how the government can determine ex-ante whether and when to grant a private company the right to early termination as well as determine ex-post whether to voluntarily terminate the project by considering the tradeoff between social benefit and cost resulting from such a termination. This study sheds light on how to develop an early termination mechanism that can be used in conjunction with the government guarantee to deal with demand risk in PPP transportation projects.
    publisherASCE
    titleEarly Termination Mechanism of Public–Private Partnership Transportation Projects with Government Guarantee
    typeJournal Article
    journal volume28
    journal issue4
    journal titleJournal of Infrastructure Systems
    identifier doi10.1061/(ASCE)IS.1943-555X.0000720
    journal fristpage04022037
    journal lastpage04022037_12
    page12
    treeJournal of Infrastructure Systems:;2022:;Volume ( 028 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian