YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Risk-Response Strategy Optimization Considering Limited Risk-Related Resource Allocation and Scheduling

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 011::page 04022123
    Author:
    Fei Zuo
    ,
    Enrico Zio
    ,
    Yuan Yuan
    DOI: 10.1061/(ASCE)CO.1943-7862.0002392
    Publisher: ASCE
    Abstract: Effective handling of project risks is an important part of project risk management. Various methods have been proposed to determine the optimal set of risk-response actions (RRAs) to mitigate the project risks. However, few existing methods incorporate resource planning into their selected RRAs. This paper integrates the risk-response problem with the resource-constrained project scheduling problem (RCPSP) and presents a method for allocating and scheduling the limited risk-related (RR) resources to provide project managers with an effective and feasible project risk-response strategy. Based on the elaboration of the relationships between the risk, the RRA, and the RR resource, a mixed-integer optimization model is developed to obtain the optimal risk-response strategy and the consequent project scheduling. A full-factorial numerical experiment is conducted to validate the optimization model and investigate the effects of risk-response efficiency and risk severity on project make-span and total cost. In addition, a model comparison analysis is presented to highlight the necessity of incorporating resource planning. The computational results show that, as expected, resource utilization can be improved by incorporating allocation and scheduling in the risk-response procedure. Also, the study suggests that project managers should avoid RR resource consumption and cost increases caused by excessive risk response in specific circumstances.
    • Download: (1010.Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Risk-Response Strategy Optimization Considering Limited Risk-Related Resource Allocation and Scheduling

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4288021
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorFei Zuo
    contributor authorEnrico Zio
    contributor authorYuan Yuan
    date accessioned2022-12-27T20:48:23Z
    date available2022-12-27T20:48:23Z
    date issued2022/11/01
    identifier other(ASCE)CO.1943-7862.0002392.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4288021
    description abstractEffective handling of project risks is an important part of project risk management. Various methods have been proposed to determine the optimal set of risk-response actions (RRAs) to mitigate the project risks. However, few existing methods incorporate resource planning into their selected RRAs. This paper integrates the risk-response problem with the resource-constrained project scheduling problem (RCPSP) and presents a method for allocating and scheduling the limited risk-related (RR) resources to provide project managers with an effective and feasible project risk-response strategy. Based on the elaboration of the relationships between the risk, the RRA, and the RR resource, a mixed-integer optimization model is developed to obtain the optimal risk-response strategy and the consequent project scheduling. A full-factorial numerical experiment is conducted to validate the optimization model and investigate the effects of risk-response efficiency and risk severity on project make-span and total cost. In addition, a model comparison analysis is presented to highlight the necessity of incorporating resource planning. The computational results show that, as expected, resource utilization can be improved by incorporating allocation and scheduling in the risk-response procedure. Also, the study suggests that project managers should avoid RR resource consumption and cost increases caused by excessive risk response in specific circumstances.
    publisherASCE
    titleRisk-Response Strategy Optimization Considering Limited Risk-Related Resource Allocation and Scheduling
    typeJournal Article
    journal volume148
    journal issue11
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002392
    journal fristpage04022123
    journal lastpage04022123_14
    page14
    treeJournal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 011
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian