YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Online Monitoring and Implementation of Commitment Management Performance and Its Impact on Project Planning in Four Construction Projects

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 010::page 05022011
    Author:
    Fabián Retamal
    ,
    Luis A. Salazar
    ,
    Luis F. Alarcón
    DOI: 10.1061/(ASCE)CO.1943-7862.0002372
    Publisher: ASCE
    Abstract: The construction sector has not evolved with respect to the productivity of its processes and has not grown as expected in the last 50 years. Therefore, the Last Planner System (LPS) was created, which is based on commitment management to improve productivity. However, only one system has been proposed to manage commitments properly, the Commitment Management System (CMS). This research created an online intervention to measure the evolution and correlation of the commitment and maturity indicators of LPS and CMS, and the behavior of social network analysis (SNA) in four construction projects. The research was divided into four parts: (1) a literature review of commitment management in the field; (2) an online adaptation of the intervention; (3) an implementation and follow-up for 10 weeks in online format, observing the evolution of CMS, SNA, and LPS; and (4) an evaluation and analysis of how the online implementation impacts the indicators, establishing trend lines and relationships among the indicators. With this intervention, the indicators of commitment management, the level of implementation of the Last Planner System, the percentage of plan completed (PPC), and the interactions among the participants were analyzed, obtaining a sustained increase of as much as 7.02% in the first 5 weeks, with a slight decrease after the intervention in some cases, such as PPC (−0.01%). The intervention showed that the percentage of compliance negotiation and agreements is a fundamental indicator for establishing a better PPC, because the SNA metrics also were affected indirectly, based on Spearman’s correlation analysis between all the measured indicators. This research demonstrated that online intervention works as a novel tool, without the need for researchers to be in the field, obtaining promising results during project monitoring.
    • Download: (2.370Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Online Monitoring and Implementation of Commitment Management Performance and Its Impact on Project Planning in Four Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4288009
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorFabián Retamal
    contributor authorLuis A. Salazar
    contributor authorLuis F. Alarcón
    date accessioned2022-12-27T20:48:05Z
    date available2022-12-27T20:48:05Z
    date issued2022/10/01
    identifier other(ASCE)CO.1943-7862.0002372.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4288009
    description abstractThe construction sector has not evolved with respect to the productivity of its processes and has not grown as expected in the last 50 years. Therefore, the Last Planner System (LPS) was created, which is based on commitment management to improve productivity. However, only one system has been proposed to manage commitments properly, the Commitment Management System (CMS). This research created an online intervention to measure the evolution and correlation of the commitment and maturity indicators of LPS and CMS, and the behavior of social network analysis (SNA) in four construction projects. The research was divided into four parts: (1) a literature review of commitment management in the field; (2) an online adaptation of the intervention; (3) an implementation and follow-up for 10 weeks in online format, observing the evolution of CMS, SNA, and LPS; and (4) an evaluation and analysis of how the online implementation impacts the indicators, establishing trend lines and relationships among the indicators. With this intervention, the indicators of commitment management, the level of implementation of the Last Planner System, the percentage of plan completed (PPC), and the interactions among the participants were analyzed, obtaining a sustained increase of as much as 7.02% in the first 5 weeks, with a slight decrease after the intervention in some cases, such as PPC (−0.01%). The intervention showed that the percentage of compliance negotiation and agreements is a fundamental indicator for establishing a better PPC, because the SNA metrics also were affected indirectly, based on Spearman’s correlation analysis between all the measured indicators. This research demonstrated that online intervention works as a novel tool, without the need for researchers to be in the field, obtaining promising results during project monitoring.
    publisherASCE
    titleOnline Monitoring and Implementation of Commitment Management Performance and Its Impact on Project Planning in Four Construction Projects
    typeJournal Article
    journal volume148
    journal issue10
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002372
    journal fristpage05022011
    journal lastpage05022011_14
    page14
    treeJournal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian