YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Curtain Wall Construction: Issues and Different Perspectives among Project Stakeholders

    Source: Journal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 005::page 04022054
    Author:
    Julee Eom
    ,
    Youngcheol Kang
    DOI: 10.1061/(ASCE)ME.1943-5479.0001085
    Publisher: ASCE
    Abstract: Curtain wall construction has become increasingly popular. Activities on the critical path, engineered materials with long lead times, and involvement of various stakeholders such as architects, façade consultants, structural engineers, general contractors, and subcontractors are the key features of curtain wall construction. Therefore, to successfully construct a curtain wall, integrated coordination based on a common understanding among them is critical because misunderstandings and conflicts caused by differences in perception among different participants can hinder effective collaboration and communication. The purpose of this study is to identify the major problems in curtain wall construction and investigate whether there exist perception differences regarding the problems among the stakeholders executing the curtain wall construction. Based on a thorough literature review and content analysis with the qualitative data collected from interviews with industry experts, 40 problems related to curtain wall construction were identified. A total of 116 responses were collected from the survey developed to address these problems. Based on the results of a descriptive statistical analysis, it is observed that actual measurement after frame construction and quality and design changes caused by the lowest bid are the two major issues of curtain wall construction. In addition, for the 20 major problems identified from the descriptive statistical analysis, analysis of variance tests were conducted to determine whether there existed differences in the perception of each stakeholder on these issues. A total of 14 out of the 20 problems showed statistically significant perception differences regarding the problems of curtain wall construction. These perception differences were particularly noticeable for the subcontractor and architecture supervisor. Two main contributions of this study, identification of major problems in curtain wall construction and verification of the perception differences between stakeholders with respect to the problems, should help practitioners establish plans to improve the construction process and justify creating more efficient circumstances for curtain wall construction.
    • Download: (421.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Curtain Wall Construction: Issues and Different Perspectives among Project Stakeholders

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4286479
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorJulee Eom
    contributor authorYoungcheol Kang
    date accessioned2022-08-18T12:21:18Z
    date available2022-08-18T12:21:18Z
    date issued2022/07/13
    identifier other%28ASCE%29ME.1943-5479.0001085.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4286479
    description abstractCurtain wall construction has become increasingly popular. Activities on the critical path, engineered materials with long lead times, and involvement of various stakeholders such as architects, façade consultants, structural engineers, general contractors, and subcontractors are the key features of curtain wall construction. Therefore, to successfully construct a curtain wall, integrated coordination based on a common understanding among them is critical because misunderstandings and conflicts caused by differences in perception among different participants can hinder effective collaboration and communication. The purpose of this study is to identify the major problems in curtain wall construction and investigate whether there exist perception differences regarding the problems among the stakeholders executing the curtain wall construction. Based on a thorough literature review and content analysis with the qualitative data collected from interviews with industry experts, 40 problems related to curtain wall construction were identified. A total of 116 responses were collected from the survey developed to address these problems. Based on the results of a descriptive statistical analysis, it is observed that actual measurement after frame construction and quality and design changes caused by the lowest bid are the two major issues of curtain wall construction. In addition, for the 20 major problems identified from the descriptive statistical analysis, analysis of variance tests were conducted to determine whether there existed differences in the perception of each stakeholder on these issues. A total of 14 out of the 20 problems showed statistically significant perception differences regarding the problems of curtain wall construction. These perception differences were particularly noticeable for the subcontractor and architecture supervisor. Two main contributions of this study, identification of major problems in curtain wall construction and verification of the perception differences between stakeholders with respect to the problems, should help practitioners establish plans to improve the construction process and justify creating more efficient circumstances for curtain wall construction.
    publisherASCE
    titleCurtain Wall Construction: Issues and Different Perspectives among Project Stakeholders
    typeJournal Article
    journal volume38
    journal issue5
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0001085
    journal fristpage04022054
    journal lastpage04022054-10
    page10
    treeJournal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian