YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Late Payment to Subcontractors in the Construction Industry

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2022:;Volume ( 014 ):;issue: 004::page 04522018
    Author:
    Sam Bolton
    ,
    Gayan Wedawatta
    ,
    Nadeeshani Wanigarathna
    ,
    Chamindi Malalgoda
    DOI: 10.1061/(ASCE)LA.1943-4170.0000552
    Publisher: ASCE
    Abstract: Late payment is a recurring issue in the United Kingdom construction industry. While the existence of the problem is well known, there is a dearth of quantified evidence on the extent of the problem from a subcontractor point of view. This research sought to quantify the extent of late payment and late release of retention and their effects on construction subcontractors in the UK. A research design including the analysis of payment data of 30 selected projects (355 payments) from a case study and a supplementary questionnaire survey with 21 subcontractors were used to investigate the issues. Late payment was observed in most of the case study subcontract projects (77%) and nearly half of the payments (46%), suggesting it is common practice. Statistical analysis showed that while there was no statistically significant link between payment delay and contract sum, subcontractors are likely to experience longer payment delays in projects with a higher number of payments. It was found that the late release of the second half of the retention posed an even more significant problem to subcontractors, with a considerable portion of the income (upward of 2.5%); sometimes the entire profit, being held up for nearly 2 months from the due date. The findings highlight that while the regulatory and contractual measures over time have sought to address the issue of late payment, it remains a prevalent issue and that subcontractors often fail to rely on such measures. This necessitates subcontractors to factor late payment into their cash flow planning. The authors suggest that the recent and proposed initiatives such as the project bank accounts, central retention deposit scheme, and smart contracts offer potential to mitigate payment delays. This research investigated the nature of payment delays from main contractors to subcontractors within the construction industry. While numerous initiatives have been undertaken, late payments to subcontractors is still a recurrent phenomenon and a norm in UK construction projects. These include significant delays in releasing the payments retained by the main contractor (money held as a means to encourage correcting any snags of subcontractors’ work) that need to be released when the work is complete. Current standard formal contractual provisions (such as interest payments for delayed payments or agreed payment dates) between the main contractors and subcontractors does not seem to have shown a significant impact on reducing payment delays. While the Construction Act in the UK has provided some encouraging regulations, they are less observed during the administration of individual contracts between the main contractors and subcontractors. The findings provide much needed quantified evidence of payment practices that can be reflected in developing regulatory, contractual, and administrative countermeasures in the UK and beyond. The information will also enable small and medium-sized enterprises (SME) subcontractors to plan for the cash flow problems they could encounter due to late payments. Further external finance handling mechanism enforced through legislation (such as project bank accounts) could be more effective in supporting subcontractors cash flow and financial resilience.
    • Download: (2.055Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Late Payment to Subcontractors in the Construction Industry

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4286447
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorSam Bolton
    contributor authorGayan Wedawatta
    contributor authorNadeeshani Wanigarathna
    contributor authorChamindi Malalgoda
    date accessioned2022-08-18T12:20:06Z
    date available2022-08-18T12:20:06Z
    date issued2022/07/05
    identifier other%28ASCE%29LA.1943-4170.0000552.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4286447
    description abstractLate payment is a recurring issue in the United Kingdom construction industry. While the existence of the problem is well known, there is a dearth of quantified evidence on the extent of the problem from a subcontractor point of view. This research sought to quantify the extent of late payment and late release of retention and their effects on construction subcontractors in the UK. A research design including the analysis of payment data of 30 selected projects (355 payments) from a case study and a supplementary questionnaire survey with 21 subcontractors were used to investigate the issues. Late payment was observed in most of the case study subcontract projects (77%) and nearly half of the payments (46%), suggesting it is common practice. Statistical analysis showed that while there was no statistically significant link between payment delay and contract sum, subcontractors are likely to experience longer payment delays in projects with a higher number of payments. It was found that the late release of the second half of the retention posed an even more significant problem to subcontractors, with a considerable portion of the income (upward of 2.5%); sometimes the entire profit, being held up for nearly 2 months from the due date. The findings highlight that while the regulatory and contractual measures over time have sought to address the issue of late payment, it remains a prevalent issue and that subcontractors often fail to rely on such measures. This necessitates subcontractors to factor late payment into their cash flow planning. The authors suggest that the recent and proposed initiatives such as the project bank accounts, central retention deposit scheme, and smart contracts offer potential to mitigate payment delays. This research investigated the nature of payment delays from main contractors to subcontractors within the construction industry. While numerous initiatives have been undertaken, late payments to subcontractors is still a recurrent phenomenon and a norm in UK construction projects. These include significant delays in releasing the payments retained by the main contractor (money held as a means to encourage correcting any snags of subcontractors’ work) that need to be released when the work is complete. Current standard formal contractual provisions (such as interest payments for delayed payments or agreed payment dates) between the main contractors and subcontractors does not seem to have shown a significant impact on reducing payment delays. While the Construction Act in the UK has provided some encouraging regulations, they are less observed during the administration of individual contracts between the main contractors and subcontractors. The findings provide much needed quantified evidence of payment practices that can be reflected in developing regulatory, contractual, and administrative countermeasures in the UK and beyond. The information will also enable small and medium-sized enterprises (SME) subcontractors to plan for the cash flow problems they could encounter due to late payments. Further external finance handling mechanism enforced through legislation (such as project bank accounts) could be more effective in supporting subcontractors cash flow and financial resilience.
    publisherASCE
    titleLate Payment to Subcontractors in the Construction Industry
    typeJournal Article
    journal volume14
    journal issue4
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000552
    journal fristpage04522018
    journal lastpage04522018-13
    page13
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2022:;Volume ( 014 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian