YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Z-Number-Based Quantitative Expression of Activity Information in Uncertain Project Scheduling

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 009::page 04022098
    Author:
    Dajiang Liu
    ,
    Changming Hu
    ,
    Songying Guo
    ,
    Jiahe Yu
    DOI: 10.1061/(ASCE)CO.1943-7862.0002362
    Publisher: ASCE
    Abstract: Uncertainty is the general state of modern project scheduling, and fuzzy numbers are the main theme to resolve uncertain project scheduling problems. Traditional fuzzy numbers can represent uncertain information values of construction projects, but cannot reflect the accuracy and reliability of such information. The Z-number can express the uncertain construction project information reasonably via the first component, and use the second component to describe objectively the accuracy and reliability of information values, thus effectively overcoming the existing disadvantages of traditional fuzzy numbers. This study used historical statistical data and expert opinions to construct the Z-number, which effectively overcomes the drawbacks of conventional fuzzy numbers in disposing the uncertain activity information. A Z-number quantization scheme based on the fuzzy expected value and agreement index algorithm effectively eliminates a large amount of information loss caused by the quantization or defuzzification of the fuzzy number, and achieves the evolution and optimization from Z-numbers to AI fuzzy numbers. The objectivity of the research was ensured by fully considering the probability of completion of the activity and the risk preference of the decision makers. Numerical experimental results verified the effectiveness of the proposed method. Taken together, this study provides a new framework for exploring fuzzy logic–based solutions to the uncertain project scheduling problem, and fills the gap of Z-number-based quantitative expression of activity information in uncertain project scheduling.
    • Download: (1.019Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Z-Number-Based Quantitative Expression of Activity Information in Uncertain Project Scheduling

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4286163
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorDajiang Liu
    contributor authorChangming Hu
    contributor authorSongying Guo
    contributor authorJiahe Yu
    date accessioned2022-08-18T12:11:20Z
    date available2022-08-18T12:11:20Z
    date issued2022/07/15
    identifier other%28ASCE%29CO.1943-7862.0002362.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4286163
    description abstractUncertainty is the general state of modern project scheduling, and fuzzy numbers are the main theme to resolve uncertain project scheduling problems. Traditional fuzzy numbers can represent uncertain information values of construction projects, but cannot reflect the accuracy and reliability of such information. The Z-number can express the uncertain construction project information reasonably via the first component, and use the second component to describe objectively the accuracy and reliability of information values, thus effectively overcoming the existing disadvantages of traditional fuzzy numbers. This study used historical statistical data and expert opinions to construct the Z-number, which effectively overcomes the drawbacks of conventional fuzzy numbers in disposing the uncertain activity information. A Z-number quantization scheme based on the fuzzy expected value and agreement index algorithm effectively eliminates a large amount of information loss caused by the quantization or defuzzification of the fuzzy number, and achieves the evolution and optimization from Z-numbers to AI fuzzy numbers. The objectivity of the research was ensured by fully considering the probability of completion of the activity and the risk preference of the decision makers. Numerical experimental results verified the effectiveness of the proposed method. Taken together, this study provides a new framework for exploring fuzzy logic–based solutions to the uncertain project scheduling problem, and fills the gap of Z-number-based quantitative expression of activity information in uncertain project scheduling.
    publisherASCE
    titleZ-Number-Based Quantitative Expression of Activity Information in Uncertain Project Scheduling
    typeJournal Article
    journal volume148
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002362
    journal fristpage04022098
    journal lastpage04022098-10
    page10
    treeJournal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian