YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Delays and Financial Implications of COVID-19 for Contractors in Irrigation Projects

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 009::page 05022006
    Author:
    Mohammad Essa Abubakar
    ,
    Abid Hasan
    ,
    Kumar Neeraj Jha
    DOI: 10.1061/(ASCE)CO.1943-7862.0002329
    Publisher: ASCE
    Abstract: Construction project delays are costly to stakeholders. Therefore, extensive research has been carried out in various countries covering different types of construction projects to identify delay factors and mitigation strategies. However, the literature has not documented the impact of a once-in-a-century event such as the COVID-19 pandemic on construction projects’ schedules and costs. The present study uses a case study approach to examine the effect of the COVID-19 pandemic on three lift irrigation projects’ construction programs and the financial implications for the contractor in the Indian construction industry. The findings reveal that the main factors responsible for delays due to the COVID-19 pandemic were fear of an outbreak, imposition of a nationwide lockdown, late return of workers, resource shortages, and changes in operating procedures. Furthermore, the study found that the contract conditions and government directives allowed for time extensions in construction projects by recognizing the pandemic as a force majeure. However, such provisions did not protect contractors’ financial interests. This study evaluates the financial implications of the COVID-19 pandemic for the contractor in terms of worker compensation during the lockdown, idling of resources, overhead costs, cost escalation, and liquidity. The public health crisis from the COVID-19 pandemic led to a series of preventive measures from the government and organizations worldwide that caused severe disruptions in construction projects and disturbed the construction supply chain. This study recommends rethinking the scope and coverage of force majeure and excusable delay clauses in standard construction contracts beyond provisions for an extension of time to protect the financial interests of different stakeholders. The vagueness in assessing and compensating for the losses from unprecedented events such as the COVID-19 pandemic could expose construction organizations to significant financial risks and threaten their existence in a highly competitive industry. Therefore, construction organizations should carefully review the contract provisions of future projects for proper risk allocations to accommodate unprecedented events and pandemics to help them recover successfully from various disruptions and associated financial losses. Moreover, proper communication and negotiation, a supportive and collaborative project culture, and early government interventions are crucial in dealing with such events and avoiding disputes among project stakeholders.
    • Download: (203.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Delays and Financial Implications of COVID-19 for Contractors in Irrigation Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4286137
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMohammad Essa Abubakar
    contributor authorAbid Hasan
    contributor authorKumar Neeraj Jha
    date accessioned2022-08-18T12:10:29Z
    date available2022-08-18T12:10:29Z
    date issued2022/07/05
    identifier other%28ASCE%29CO.1943-7862.0002329.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4286137
    description abstractConstruction project delays are costly to stakeholders. Therefore, extensive research has been carried out in various countries covering different types of construction projects to identify delay factors and mitigation strategies. However, the literature has not documented the impact of a once-in-a-century event such as the COVID-19 pandemic on construction projects’ schedules and costs. The present study uses a case study approach to examine the effect of the COVID-19 pandemic on three lift irrigation projects’ construction programs and the financial implications for the contractor in the Indian construction industry. The findings reveal that the main factors responsible for delays due to the COVID-19 pandemic were fear of an outbreak, imposition of a nationwide lockdown, late return of workers, resource shortages, and changes in operating procedures. Furthermore, the study found that the contract conditions and government directives allowed for time extensions in construction projects by recognizing the pandemic as a force majeure. However, such provisions did not protect contractors’ financial interests. This study evaluates the financial implications of the COVID-19 pandemic for the contractor in terms of worker compensation during the lockdown, idling of resources, overhead costs, cost escalation, and liquidity. The public health crisis from the COVID-19 pandemic led to a series of preventive measures from the government and organizations worldwide that caused severe disruptions in construction projects and disturbed the construction supply chain. This study recommends rethinking the scope and coverage of force majeure and excusable delay clauses in standard construction contracts beyond provisions for an extension of time to protect the financial interests of different stakeholders. The vagueness in assessing and compensating for the losses from unprecedented events such as the COVID-19 pandemic could expose construction organizations to significant financial risks and threaten their existence in a highly competitive industry. Therefore, construction organizations should carefully review the contract provisions of future projects for proper risk allocations to accommodate unprecedented events and pandemics to help them recover successfully from various disruptions and associated financial losses. Moreover, proper communication and negotiation, a supportive and collaborative project culture, and early government interventions are crucial in dealing with such events and avoiding disputes among project stakeholders.
    publisherASCE
    titleDelays and Financial Implications of COVID-19 for Contractors in Irrigation Projects
    typeJournal Article
    journal volume148
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002329
    journal fristpage05022006
    journal lastpage05022006-10
    page10
    treeJournal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian