YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Physical Distancing Analytics for Construction Planning Using 4D BIM

    Source: Journal of Computing in Civil Engineering:;2022:;Volume ( 036 ):;issue: 004::page 04022012
    Author:
    Abdelhady Hosny
    ,
    Mazdak Nik-Bakht
    ,
    Osama Moselhi
    DOI: 10.1061/(ASCE)CP.1943-5487.0001023
    Publisher: ASCE
    Abstract: The COVID-19 pandemic has impacted how the construction industry operates around the world. To fight the risk of transmission, new health, safety, and environmental (HSE) protocols have been put in place. Among these protocols are social distancing and limiting the number of workers per area, where social distancing acts as a so-called protective bubble for each worker. Contractors are now required to attempt to achieve (and be prepared to keep) social distancing among their workers whenever needed and possible. Otherwise, they could be forced to halt operations due to having an unsafe environment. Accordingly, construction plans, and corresponding workspace assignments, should be revised in a four-dimensional (4D) environment to ensure fulfillment. Even after the end of this pandemic, the new HSE awareness achieved during this experiment is expected to reshape the so-called new normal of construction. Therefore, this paper presents a novel workspace simulation and management solution comprising a theoretical framework and a semiautomated tool to incorporate physical distancing during 4D planning. The semiautomated tool creates a 4D building information model, loaded with workspaces and social distance bubbles as stochastic variables, and utilizes Monte Carlo simulation to model uncertainties occurring onsite. The uncertainties considered are both temporal and spatial, i.e., changes in productivity and workspace sizes, respectively. This tool surpasses existing workspace management solutions in that (1) it has a schedule generation module to recompute schedule projections based on temporal uncertainties, (2) its workspace generation module can automatically create physical distance buffers around selected workspaces, as per site conditions, (3) its 4D simulation can realistically mimic the work progress on the site, and (4) its 4D clash detection module can smartly detect and report both soft and hard operational clashes. Additionally, the proposed analytics target three levels of clash resolution: site, workspace, and activity level. The framework and developed tool were tested against a residential building case study. Over the course of 155 days, 26 activities with 257 workspace assignments were examined. The proposed solution was able to capture the critical schedule duration (21 out of 155 days), the impactful 4D clashes (44 out of 2,900), and the activities involved in the most sever clashes (5 out of 26). Hence, the proposed method and the developed software tool will help planners/construction managers understand the space requirements for construction operations considering social distancing and other required safety buffering, identify critical spatiotemporal zones, and suggest resolution strategies for the resulting clashes based on the analytics.
    • Download: (6.583Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Physical Distancing Analytics for Construction Planning Using 4D BIM

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4283130
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorAbdelhady Hosny
    contributor authorMazdak Nik-Bakht
    contributor authorOsama Moselhi
    date accessioned2022-05-07T20:58:02Z
    date available2022-05-07T20:58:02Z
    date issued2022-04-12
    identifier other(ASCE)CP.1943-5487.0001023.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4283130
    description abstractThe COVID-19 pandemic has impacted how the construction industry operates around the world. To fight the risk of transmission, new health, safety, and environmental (HSE) protocols have been put in place. Among these protocols are social distancing and limiting the number of workers per area, where social distancing acts as a so-called protective bubble for each worker. Contractors are now required to attempt to achieve (and be prepared to keep) social distancing among their workers whenever needed and possible. Otherwise, they could be forced to halt operations due to having an unsafe environment. Accordingly, construction plans, and corresponding workspace assignments, should be revised in a four-dimensional (4D) environment to ensure fulfillment. Even after the end of this pandemic, the new HSE awareness achieved during this experiment is expected to reshape the so-called new normal of construction. Therefore, this paper presents a novel workspace simulation and management solution comprising a theoretical framework and a semiautomated tool to incorporate physical distancing during 4D planning. The semiautomated tool creates a 4D building information model, loaded with workspaces and social distance bubbles as stochastic variables, and utilizes Monte Carlo simulation to model uncertainties occurring onsite. The uncertainties considered are both temporal and spatial, i.e., changes in productivity and workspace sizes, respectively. This tool surpasses existing workspace management solutions in that (1) it has a schedule generation module to recompute schedule projections based on temporal uncertainties, (2) its workspace generation module can automatically create physical distance buffers around selected workspaces, as per site conditions, (3) its 4D simulation can realistically mimic the work progress on the site, and (4) its 4D clash detection module can smartly detect and report both soft and hard operational clashes. Additionally, the proposed analytics target three levels of clash resolution: site, workspace, and activity level. The framework and developed tool were tested against a residential building case study. Over the course of 155 days, 26 activities with 257 workspace assignments were examined. The proposed solution was able to capture the critical schedule duration (21 out of 155 days), the impactful 4D clashes (44 out of 2,900), and the activities involved in the most sever clashes (5 out of 26). Hence, the proposed method and the developed software tool will help planners/construction managers understand the space requirements for construction operations considering social distancing and other required safety buffering, identify critical spatiotemporal zones, and suggest resolution strategies for the resulting clashes based on the analytics.
    publisherASCE
    titlePhysical Distancing Analytics for Construction Planning Using 4D BIM
    typeJournal Paper
    journal volume36
    journal issue4
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)CP.1943-5487.0001023
    journal fristpage04022012
    journal lastpage04022012-19
    page19
    treeJournal of Computing in Civil Engineering:;2022:;Volume ( 036 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian