YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Productivity Measurement and Improvement for Public Construction Projects

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 006::page 04022035
    Author:
    Wenting Zhan
    ,
    Wei Pan
    ,
    Gang Hao
    DOI: 10.1061/(ASCE)CO.1943-7862.0002282
    Publisher: ASCE
    Abstract: Large-scale public construction projects often become expensive white elephants requiring considerable postconstruction maintenance. Thus there is a pressing need to integrate construction and postconstruction stages into productivity measurement and analysis. However, previous studies of productivity measurement focused on the efficiency of the project delivery phase, but overlooked the utilization of the constructed facility. This paper developed a two-stage construction project productivity (CPP) measurement model by integrating site efficiency (SE) and utilization effectiveness to investigate strategies for improving the overall CPP. An as-usual setting, which delineates the measurement of CPP, was developed as the benchmark model. Given the relative nature of the productivity concept, two scenarios were considered for CPP improvement. The enhancement scenario was introduced by adding a requirement that CPP is enhanced compared with that in the benchmark model. Then a transcendence scenario was developed to ensure that CPP is better than SE. Strategies for CPP improvement were formulated and were analyzed using the analytical models developed. This study for the first time distinguished the substitutionarity and complementarity between facility occupation and facility management in the postconstruction stage, and claims that the opposite natures offer opposite strategies for CPP improvement. The empirical analysis revealed the law of diminishing marginal utility of facility management. This paper contributes to the body of knowledge by extending the productivity measurement model from the construction stage only to the integration of the construction and postconstruction stages, and by offering two productivity improvement scenarios for strategy formulation. Methodologically, this paper offers a two-stage productivity measurement model and its improvement models in a mathematical way. Managerially, based on the developed models, this work offers the evidence and quantitative guidance for the policy makers and public clients to strategically improve CPP of public projects.
    • Download: (895.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Productivity Measurement and Improvement for Public Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4283087
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorWenting Zhan
    contributor authorWei Pan
    contributor authorGang Hao
    date accessioned2022-05-07T20:56:03Z
    date available2022-05-07T20:56:03Z
    date issued2022-03-31
    identifier other(ASCE)CO.1943-7862.0002282.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4283087
    description abstractLarge-scale public construction projects often become expensive white elephants requiring considerable postconstruction maintenance. Thus there is a pressing need to integrate construction and postconstruction stages into productivity measurement and analysis. However, previous studies of productivity measurement focused on the efficiency of the project delivery phase, but overlooked the utilization of the constructed facility. This paper developed a two-stage construction project productivity (CPP) measurement model by integrating site efficiency (SE) and utilization effectiveness to investigate strategies for improving the overall CPP. An as-usual setting, which delineates the measurement of CPP, was developed as the benchmark model. Given the relative nature of the productivity concept, two scenarios were considered for CPP improvement. The enhancement scenario was introduced by adding a requirement that CPP is enhanced compared with that in the benchmark model. Then a transcendence scenario was developed to ensure that CPP is better than SE. Strategies for CPP improvement were formulated and were analyzed using the analytical models developed. This study for the first time distinguished the substitutionarity and complementarity between facility occupation and facility management in the postconstruction stage, and claims that the opposite natures offer opposite strategies for CPP improvement. The empirical analysis revealed the law of diminishing marginal utility of facility management. This paper contributes to the body of knowledge by extending the productivity measurement model from the construction stage only to the integration of the construction and postconstruction stages, and by offering two productivity improvement scenarios for strategy formulation. Methodologically, this paper offers a two-stage productivity measurement model and its improvement models in a mathematical way. Managerially, based on the developed models, this work offers the evidence and quantitative guidance for the policy makers and public clients to strategically improve CPP of public projects.
    publisherASCE
    titleProductivity Measurement and Improvement for Public Construction Projects
    typeJournal Paper
    journal volume148
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002282
    journal fristpage04022035
    journal lastpage04022035-12
    page12
    treeJournal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian