YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Multiskilled Workforce Planning: A Case from the Construction Industry

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 005::page 04022021
    Author:
    Araz Nasirian
    ,
    Babak Abbasi
    ,
    T. C. E. Cheng
    ,
    Mehrdad Arashpour
    DOI: 10.1061/(ASCE)CO.1943-7862.0002279
    Publisher: ASCE
    Abstract: The objective of this research was to present a platform to identify the optimal staffing of a multiskilled workforce in the construction industry. The novelty of our model is its capability in developing a customized and context specific multiskilled workforce staffing strategy that identifies the best compromise between multiskilling costs and benefits with consideration of unique features of different production environments. Another novelty of our multiskilled workforce staffing is its capacity to explore every possible schedule associate with every possible staffing strategy. Our model chooses the multiskilling staffing strategy corresponding to the schedule that leads to the best results in terms of cost and time. The paper examined optimal multiskilling staffing and scheduling and compared it with well-regarded existing multiskilling strategies in the construction industry, such as chaining and direct capacity balancing, using an optimization technique. The parameters of the optimization model were informed by a small hypothetical case and a real case off-site construction factory producing bathroom pods in Australia. Developed an optimal multiskilling staffing strategy continuously and in some cases significantly outweighed the existing well-regarded multiskilling strategies. The optimal multiskilling staffing strategy is highly context-specific and can be very complex because achieving it needs having an appropriate staffing platform. Subjective decision making on a multi skilling staffing strategy that does not deploy the workforce to the most appropriate workstations can lead to a significant productivity loss.
    • Download: (1.570Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Multiskilled Workforce Planning: A Case from the Construction Industry

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4283085
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAraz Nasirian
    contributor authorBabak Abbasi
    contributor authorT. C. E. Cheng
    contributor authorMehrdad Arashpour
    date accessioned2022-05-07T20:55:58Z
    date available2022-05-07T20:55:58Z
    date issued2022-03-14
    identifier other(ASCE)CO.1943-7862.0002279.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4283085
    description abstractThe objective of this research was to present a platform to identify the optimal staffing of a multiskilled workforce in the construction industry. The novelty of our model is its capability in developing a customized and context specific multiskilled workforce staffing strategy that identifies the best compromise between multiskilling costs and benefits with consideration of unique features of different production environments. Another novelty of our multiskilled workforce staffing is its capacity to explore every possible schedule associate with every possible staffing strategy. Our model chooses the multiskilling staffing strategy corresponding to the schedule that leads to the best results in terms of cost and time. The paper examined optimal multiskilling staffing and scheduling and compared it with well-regarded existing multiskilling strategies in the construction industry, such as chaining and direct capacity balancing, using an optimization technique. The parameters of the optimization model were informed by a small hypothetical case and a real case off-site construction factory producing bathroom pods in Australia. Developed an optimal multiskilling staffing strategy continuously and in some cases significantly outweighed the existing well-regarded multiskilling strategies. The optimal multiskilling staffing strategy is highly context-specific and can be very complex because achieving it needs having an appropriate staffing platform. Subjective decision making on a multi skilling staffing strategy that does not deploy the workforce to the most appropriate workstations can lead to a significant productivity loss.
    publisherASCE
    titleMultiskilled Workforce Planning: A Case from the Construction Industry
    typeJournal Paper
    journal volume148
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002279
    journal fristpage04022021
    journal lastpage04022021-17
    page17
    treeJournal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian