YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Forecasting Project Duration in the Face of Disruptive Events: A Resource-Based Approach

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 005::page 04022016
    Author:
    Seyed Ashkan Zarghami
    DOI: 10.1061/(ASCE)CO.1943-7862.0002257
    Publisher: ASCE
    Abstract: Disruptive events are the main source of delays in projects. A key task for construction managers is to revise the project schedule plan based on time delays caused by these events. Consequently, project management research has developed various forecasting methods to evaluate the prospective impact of disruptive events on project completion time. This article tackles three shortcomings of the available forecasting methods: (1) the extrapolative and judgmental nature of these methods, (2) the lack of an explicit focus on project resources, and (3) the lack of attention to the disproportionate impact of disruptive events on project resources. The method developed in this study takes into account the detrimental effects of disruptive events on project resources in the case where there is no historical precedence. In this method, project resources are first mapped into reliability block diagrams (RBDs) to develop a stochastic variable that reflects the impact of resource shortages on project activity. A Monte Carlo simulation analysis is performed to simulate the uncertainty in acquiring resources during disruptions. The impact of resource shortages on the completion time of project activity is then quantified by means of the stochastic variable developed in the first step. The proposed method is demonstrated in a real-life construction project. The validation results prove the better performance of the new method in forecasting time delays caused by unexpected events compared to the existing methods. The proposed method assists construction managers in revising project schedule plans and provides benefits in framing and solving problems that arise when disruptions occur.
    • Download: (2.607Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Forecasting Project Duration in the Face of Disruptive Events: A Resource-Based Approach

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4283063
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorSeyed Ashkan Zarghami
    date accessioned2022-05-07T20:54:30Z
    date available2022-05-07T20:54:30Z
    date issued2022-03-10
    identifier other(ASCE)CO.1943-7862.0002257.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4283063
    description abstractDisruptive events are the main source of delays in projects. A key task for construction managers is to revise the project schedule plan based on time delays caused by these events. Consequently, project management research has developed various forecasting methods to evaluate the prospective impact of disruptive events on project completion time. This article tackles three shortcomings of the available forecasting methods: (1) the extrapolative and judgmental nature of these methods, (2) the lack of an explicit focus on project resources, and (3) the lack of attention to the disproportionate impact of disruptive events on project resources. The method developed in this study takes into account the detrimental effects of disruptive events on project resources in the case where there is no historical precedence. In this method, project resources are first mapped into reliability block diagrams (RBDs) to develop a stochastic variable that reflects the impact of resource shortages on project activity. A Monte Carlo simulation analysis is performed to simulate the uncertainty in acquiring resources during disruptions. The impact of resource shortages on the completion time of project activity is then quantified by means of the stochastic variable developed in the first step. The proposed method is demonstrated in a real-life construction project. The validation results prove the better performance of the new method in forecasting time delays caused by unexpected events compared to the existing methods. The proposed method assists construction managers in revising project schedule plans and provides benefits in framing and solving problems that arise when disruptions occur.
    publisherASCE
    titleForecasting Project Duration in the Face of Disruptive Events: A Resource-Based Approach
    typeJournal Paper
    journal volume148
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002257
    journal fristpage04022016
    journal lastpage04022016-14
    page14
    treeJournal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian