YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Risk-Sensitive Competitive Bidding Model and Impact of Risk Aversion and Cost Uncertainty on Optimum Bid

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 148 ):;issue: 003::page 04021205
    Author:
    Photios G. Ioannou
    DOI: 10.1061/(ASCE)CO.1943-7862.0002244
    Publisher: ASCE
    Abstract: A decision analysis model is presented that can be used by a contractor to determine the optimum lump-sum bid that maximizes expected utility for an upcoming job. Required inputs include the contractor’s utility curve, the distribution of the opponents’ low bid-to-cost ratio, and the distribution of the project cost. Closed-form expressions for expected utility are developed for an exponential utility curve and normally distributed project cost that can also be used as approximations for other models. Any appropriate bidding model can be used to estimate the probability to win. Important concepts introduced include the certain equivalent and the risk premium for a project profit lottery, corporate indifferent buying price (CIBP), and risk-adjusted cost (RAC). Parametric curves from the maximization of expected utility over a total of 21,462 combinations of the contractor’s risk tolerance and the standard deviation of project cost illustrate the considerable impact of risk aversion and cost uncertainty on the optimal bid-to-cost ratio, on the probability of losing money on the job, and on the certain equivalent and risk premium for profit. This sensitivity analysis shows that maximizing expected utility can result in an optimal bid-to-cost ratio that can be significantly different (smaller or larger) than the bid-to-cost ratio found by only maximizing expected profit and ignoring the significant impact of uncertainty in project cost σ. The presented procedure allows contractors to use any appropriate model for the probability of winning (such as those proposed by Friedman, Gates, Carr, or Ioannou), assess their risk tolerance and the standard deviation of project cost, and select an optimal bid price that maximizes their expected utility for profit.
    • Download: (679.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Risk-Sensitive Competitive Bidding Model and Impact of Risk Aversion and Cost Uncertainty on Optimum Bid

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4283050
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorPhotios G. Ioannou
    date accessioned2022-05-07T20:53:56Z
    date available2022-05-07T20:53:56Z
    date issued2021-12-20
    identifier other(ASCE)CO.1943-7862.0002244.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4283050
    description abstractA decision analysis model is presented that can be used by a contractor to determine the optimum lump-sum bid that maximizes expected utility for an upcoming job. Required inputs include the contractor’s utility curve, the distribution of the opponents’ low bid-to-cost ratio, and the distribution of the project cost. Closed-form expressions for expected utility are developed for an exponential utility curve and normally distributed project cost that can also be used as approximations for other models. Any appropriate bidding model can be used to estimate the probability to win. Important concepts introduced include the certain equivalent and the risk premium for a project profit lottery, corporate indifferent buying price (CIBP), and risk-adjusted cost (RAC). Parametric curves from the maximization of expected utility over a total of 21,462 combinations of the contractor’s risk tolerance and the standard deviation of project cost illustrate the considerable impact of risk aversion and cost uncertainty on the optimal bid-to-cost ratio, on the probability of losing money on the job, and on the certain equivalent and risk premium for profit. This sensitivity analysis shows that maximizing expected utility can result in an optimal bid-to-cost ratio that can be significantly different (smaller or larger) than the bid-to-cost ratio found by only maximizing expected profit and ignoring the significant impact of uncertainty in project cost σ. The presented procedure allows contractors to use any appropriate model for the probability of winning (such as those proposed by Friedman, Gates, Carr, or Ioannou), assess their risk tolerance and the standard deviation of project cost, and select an optimal bid price that maximizes their expected utility for profit.
    publisherASCE
    titleRisk-Sensitive Competitive Bidding Model and Impact of Risk Aversion and Cost Uncertainty on Optimum Bid
    typeJournal Paper
    journal volume148
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002244
    journal fristpage04021205
    journal lastpage04021205-12
    page12
    treeJournal of Construction Engineering and Management:;2021:;Volume ( 148 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian