YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Analysis of User Needs in Time-Related Risk Management for Holistic Project Understanding

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 004::page 05022002
    Author:
    Haiyan Xie
    ,
    Ying Hong
    ,
    Ioannis Brilakis
    DOI: 10.1061/(ASCE)CO.1943-7862.0002241
    Publisher: ASCE
    Abstract: Evaluation of time-related risks often leads to changes and adjustments in construction schedules, but this influential process is not extensively mapped in literature because of the unstructured data. This absence causes information deficiency and confusion in communication, which, in turn, affects project planning and control, and hinders knowledge sharing and management. This research aims to investigate the obstacles in project execution with the assumption that a decision tree model can map user needs and trace workflows. To understand user needs, we first recorded the focus group discussions followed by semi-structured interviews, then transcribed them into a combined script of 120,000 words. Meanwhile, the prevailing standards of project execution were diagrammed to define ten interconnected categories and derive the workflow schemes to obtain a novel decision tree model, which was used together with the interview data to validate the probabilities and the weighted significance values. The next step was to quantify and prioritize the exact user needs and data specifications of the industry professionals during project execution. After the verification with the invited expert panel, the results show that the most predominant urgencies of time-related risk management are (1) the decision support tools using automated functions to check schedule logic and evaluating risks, (2) preparation assistance for risk communication, and (3) generation of risk mitigation scenarios. The findings can help to line up software development steps for scheduling programs and improve the quality of the risk response strategies for construction projects. One limitation of the current work is the sample size of interviewees, which could be enhanced by designing a questionnaire based on the findings and survey the construction industry.
    • Download: (2.037Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Analysis of User Needs in Time-Related Risk Management for Holistic Project Understanding

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4283046
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorHaiyan Xie
    contributor authorYing Hong
    contributor authorIoannis Brilakis
    date accessioned2022-05-07T20:53:43Z
    date available2022-05-07T20:53:43Z
    date issued2022-01-17
    identifier other(ASCE)CO.1943-7862.0002241.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4283046
    description abstractEvaluation of time-related risks often leads to changes and adjustments in construction schedules, but this influential process is not extensively mapped in literature because of the unstructured data. This absence causes information deficiency and confusion in communication, which, in turn, affects project planning and control, and hinders knowledge sharing and management. This research aims to investigate the obstacles in project execution with the assumption that a decision tree model can map user needs and trace workflows. To understand user needs, we first recorded the focus group discussions followed by semi-structured interviews, then transcribed them into a combined script of 120,000 words. Meanwhile, the prevailing standards of project execution were diagrammed to define ten interconnected categories and derive the workflow schemes to obtain a novel decision tree model, which was used together with the interview data to validate the probabilities and the weighted significance values. The next step was to quantify and prioritize the exact user needs and data specifications of the industry professionals during project execution. After the verification with the invited expert panel, the results show that the most predominant urgencies of time-related risk management are (1) the decision support tools using automated functions to check schedule logic and evaluating risks, (2) preparation assistance for risk communication, and (3) generation of risk mitigation scenarios. The findings can help to line up software development steps for scheduling programs and improve the quality of the risk response strategies for construction projects. One limitation of the current work is the sample size of interviewees, which could be enhanced by designing a questionnaire based on the findings and survey the construction industry.
    publisherASCE
    titleAnalysis of User Needs in Time-Related Risk Management for Holistic Project Understanding
    typeJournal Paper
    journal volume148
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002241
    journal fristpage05022002
    journal lastpage05022002-13
    page13
    treeJournal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian