YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Understanding Disputes in Modular Construction Projects: Key Common Causes and Their Associations

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 148 ):;issue: 001::page 04021184
    Author:
    Mohamad Abdul Nabi
    ,
    Islam H. El-adaway
    DOI: 10.1061/(ASCE)CO.1943-7862.0002208
    Publisher: ASCE
    Abstract: Modularization is a well-known approach that can potentially mitigate many of the current construction industry’s challenges including, for example, poor productivity, shortages in skilled labors, and poor safety performance. Recent studies have shown that contractual risks and disputes are still considered one of the top factors affecting the performance of modular processes. Many research efforts have analyzed disputes and their causes in the construction industry, but none of them addressed the unique and complex sources of disputes that could be associated with the use of modularization. The goal of this paper is to investigate dispute causation in modular construction projects. To this end, this study adopted an integrated multistep analytical research methodology. First, the authors collected and analyzed a total of 39 publicly available law cases of modular construction disputes in the US. Second, social network analysis was performed to identify the most common causes leading to disputes in modular construction projects. Third, spectral clustering was conducted to group the dispute causes based on the strength of their interconnectivities. Fourth, association rule analysis and Apriori algorithms were used to identify key associations of causes that would most likely trigger modular construction disputes. The results indicated that payment holds and delays, delay in project completion, poor communication among the project stakeholder, and lack of collaboration between various trades are common causes of disputes in modular construction projects. Also, as the authors were able to cluster the 40 identified causes of disputes into four clusters, the most significant associations of dispute causes were determined and quantified within each identified cluster. Further, the findings reflected that modular construction disputes are mostly triggered by the occurrence of multiple causes rather than by just a single cause. This paper adds to the body of knowledge by helping practitioners manage and control sources of disputes in modular construction projects. This should help to minimize dispute occurrence during modular processes, and thus maximize capitalization on modularization benefits. Ultimately, the outcomes of this paper should direct researchers and industry practitioners toward the contractual aspects of modularization that require appropriate adjustments and revision so as to better account for the uniqueness of modular processes within today’s complex construction industry.
    • Download: (2.785Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Understanding Disputes in Modular Construction Projects: Key Common Causes and Their Associations

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4283011
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMohamad Abdul Nabi
    contributor authorIslam H. El-adaway
    date accessioned2022-05-07T20:52:09Z
    date available2022-05-07T20:52:09Z
    date issued2021-11-02
    identifier other(ASCE)CO.1943-7862.0002208.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4283011
    description abstractModularization is a well-known approach that can potentially mitigate many of the current construction industry’s challenges including, for example, poor productivity, shortages in skilled labors, and poor safety performance. Recent studies have shown that contractual risks and disputes are still considered one of the top factors affecting the performance of modular processes. Many research efforts have analyzed disputes and their causes in the construction industry, but none of them addressed the unique and complex sources of disputes that could be associated with the use of modularization. The goal of this paper is to investigate dispute causation in modular construction projects. To this end, this study adopted an integrated multistep analytical research methodology. First, the authors collected and analyzed a total of 39 publicly available law cases of modular construction disputes in the US. Second, social network analysis was performed to identify the most common causes leading to disputes in modular construction projects. Third, spectral clustering was conducted to group the dispute causes based on the strength of their interconnectivities. Fourth, association rule analysis and Apriori algorithms were used to identify key associations of causes that would most likely trigger modular construction disputes. The results indicated that payment holds and delays, delay in project completion, poor communication among the project stakeholder, and lack of collaboration between various trades are common causes of disputes in modular construction projects. Also, as the authors were able to cluster the 40 identified causes of disputes into four clusters, the most significant associations of dispute causes were determined and quantified within each identified cluster. Further, the findings reflected that modular construction disputes are mostly triggered by the occurrence of multiple causes rather than by just a single cause. This paper adds to the body of knowledge by helping practitioners manage and control sources of disputes in modular construction projects. This should help to minimize dispute occurrence during modular processes, and thus maximize capitalization on modularization benefits. Ultimately, the outcomes of this paper should direct researchers and industry practitioners toward the contractual aspects of modularization that require appropriate adjustments and revision so as to better account for the uniqueness of modular processes within today’s complex construction industry.
    publisherASCE
    titleUnderstanding Disputes in Modular Construction Projects: Key Common Causes and Their Associations
    typeJournal Paper
    journal volume148
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002208
    journal fristpage04021184
    journal lastpage04021184-19
    page19
    treeJournal of Construction Engineering and Management:;2021:;Volume ( 148 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian