YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Structural Design and Construction Practice
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Management of Change Orders in Infrastructure Transportation Projects

    Source: Practice Periodical on Structural Design and Construction:;2021:;Volume ( 027 ):;issue: 001::page 05021006
    Author:
    Rayan H. Assaad
    ,
    Muaz O. Ahmed
    ,
    Islam H. El-adaway
    ,
    Pramen P. Shrestha
    DOI: 10.1061/(ASCE)SC.1943-5576.0000640
    Publisher: ASCE
    Abstract: The Illinois Department of Transportation (IDOT) will handle many upcoming projects due to the recent statewide infrastructure strategic plan and the fast-track efforts affecting many infrastructure projects amid COVID-19. Nevertheless, many change orders are anticipated to occur on IDOT’s projects. Thus, this paper examines the proper contractual management of changes within IDOT infrastructure transportation projects by following a research method based on the integration between a desktop analysis and a focus group analysis. The desktop analysis involved collecting information and data from existing resources, case studies, and documents related to change orders. The focus group analysis involved consulting with change order experts to verify that the outcome of each research step is useful and to validate the final outcomes of the paper. Based on 50 documented major change orders in IDOT projects and three litigated cases, two findings are provided. First, the top causes for key change orders within IDOT projects include contract administration, allowable contingencies, quantity omission or error, differing site conditions, and design changes. Second, the most critical change order related challenges within IDOT’s infrastructure projects include approval procedures, compensation considerations, and applicable laws. This paper offers flowcharts, synopsis of opportunities and risks, and a checklist to help the contracting parties better administer change orders. Ultimately, the contributions of this paper to the practice include: (1) minimizing the number and amount of change orders, (2) helping the contracting parties better understand how their individual responsibilities contribute to the proper processing and management of changes and variations, (3) offering contractors the ability to visualize the different steps involved in the approval of change orders, (4) assisting the project stakeholders in identifying change order-related areas for improvement, and (5) allowing project owners to better mitigate, manage, and administer the contractual aspects of change orders.
    • Download: (2.134Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Management of Change Orders in Infrastructure Transportation Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4282260
    Collections
    • Journal of Structural Design and Construction Practice

    Show full item record

    contributor authorRayan H. Assaad
    contributor authorMuaz O. Ahmed
    contributor authorIslam H. El-adaway
    contributor authorPramen P. Shrestha
    date accessioned2022-05-07T20:18:52Z
    date available2022-05-07T20:18:52Z
    date issued2021-10-15
    identifier other(ASCE)SC.1943-5576.0000640.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4282260
    description abstractThe Illinois Department of Transportation (IDOT) will handle many upcoming projects due to the recent statewide infrastructure strategic plan and the fast-track efforts affecting many infrastructure projects amid COVID-19. Nevertheless, many change orders are anticipated to occur on IDOT’s projects. Thus, this paper examines the proper contractual management of changes within IDOT infrastructure transportation projects by following a research method based on the integration between a desktop analysis and a focus group analysis. The desktop analysis involved collecting information and data from existing resources, case studies, and documents related to change orders. The focus group analysis involved consulting with change order experts to verify that the outcome of each research step is useful and to validate the final outcomes of the paper. Based on 50 documented major change orders in IDOT projects and three litigated cases, two findings are provided. First, the top causes for key change orders within IDOT projects include contract administration, allowable contingencies, quantity omission or error, differing site conditions, and design changes. Second, the most critical change order related challenges within IDOT’s infrastructure projects include approval procedures, compensation considerations, and applicable laws. This paper offers flowcharts, synopsis of opportunities and risks, and a checklist to help the contracting parties better administer change orders. Ultimately, the contributions of this paper to the practice include: (1) minimizing the number and amount of change orders, (2) helping the contracting parties better understand how their individual responsibilities contribute to the proper processing and management of changes and variations, (3) offering contractors the ability to visualize the different steps involved in the approval of change orders, (4) assisting the project stakeholders in identifying change order-related areas for improvement, and (5) allowing project owners to better mitigate, manage, and administer the contractual aspects of change orders.
    publisherASCE
    titleManagement of Change Orders in Infrastructure Transportation Projects
    typeJournal Paper
    journal volume27
    journal issue1
    journal titlePractice Periodical on Structural Design and Construction
    identifier doi10.1061/(ASCE)SC.1943-5576.0000640
    journal fristpage05021006
    journal lastpage05021006-17
    page17
    treePractice Periodical on Structural Design and Construction:;2021:;Volume ( 027 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian