YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Exploit Social Distancing in Construction Scheduling: Visualize and Optimize Space–Time–Workforce Tradeoff

    Source: Journal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 004::page 04022027
    Author:
    Chuanni He
    ,
    Min Liu
    ,
    YuXiang Zhang
    ,
    Zhigao Wang
    ,
    Simon M. Hsiang
    ,
    Gongfan Chen
    ,
    Jiang Chen
    DOI: 10.1061/(ASCE)ME.1943-5479.0001037
    Publisher: ASCE
    Abstract: The COVID pandemic has given rise to the necessity of social distancing regulations, which has brought the importance of workspace management on the construction site to an unprecedented level. Understanding and visualizing the interaction and tradeoff among space, time, and workforce is critical for construction managers to schedule and deliver projects on time. Therefore, the objectives of this research are to investigate how the critical path method (CPM) and Takt-time planning methods utilize space, time, and workforce differently, develop a tool to visualize the space–time–workforce interactions, and investigate the space–time–workforce tradeoff based on different managers’ preferences. This research selected a high-rise office building project and collected 889 sets of productivity data of five specialty trades. The research built a simulation model to investigate productivity and project performance under 267 scenarios of different combinations of the three resources. A dynamic tool was then developed to visualize workspace, time, and workforce interactions. Finally, a Choquet integral–based evaluation and decision tool was developed. The simulation results show that the Takt-time planning method can reduce up to 80% of workspace overlap compared with the actual production plan with less than 20% of duration extension. The contributions to the body of knowledge are (1) creating a visual framework for managers to understand the interaction and tradeoff among space, time, and workforce quickly and accurately, and (2) developing an innovative Choquet integral approach for managers to evaluate planning strategies according to project preferences. The framework and analysis method can be adapted to other construction projects to assist managers to visualize and optimize the space–time–workforce tradeoff under uncertain project drivers.
    • Download: (3.002Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Exploit Social Distancing in Construction Scheduling: Visualize and Optimize Space–Time–Workforce Tradeoff

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4281855
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorChuanni He
    contributor authorMin Liu
    contributor authorYuXiang Zhang
    contributor authorZhigao Wang
    contributor authorSimon M. Hsiang
    contributor authorGongfan Chen
    contributor authorJiang Chen
    date accessioned2022-05-07T19:58:06Z
    date available2022-05-07T19:58:06Z
    date issued2022-04-05
    identifier other(ASCE)ME.1943-5479.0001037.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4281855
    description abstractThe COVID pandemic has given rise to the necessity of social distancing regulations, which has brought the importance of workspace management on the construction site to an unprecedented level. Understanding and visualizing the interaction and tradeoff among space, time, and workforce is critical for construction managers to schedule and deliver projects on time. Therefore, the objectives of this research are to investigate how the critical path method (CPM) and Takt-time planning methods utilize space, time, and workforce differently, develop a tool to visualize the space–time–workforce interactions, and investigate the space–time–workforce tradeoff based on different managers’ preferences. This research selected a high-rise office building project and collected 889 sets of productivity data of five specialty trades. The research built a simulation model to investigate productivity and project performance under 267 scenarios of different combinations of the three resources. A dynamic tool was then developed to visualize workspace, time, and workforce interactions. Finally, a Choquet integral–based evaluation and decision tool was developed. The simulation results show that the Takt-time planning method can reduce up to 80% of workspace overlap compared with the actual production plan with less than 20% of duration extension. The contributions to the body of knowledge are (1) creating a visual framework for managers to understand the interaction and tradeoff among space, time, and workforce quickly and accurately, and (2) developing an innovative Choquet integral approach for managers to evaluate planning strategies according to project preferences. The framework and analysis method can be adapted to other construction projects to assist managers to visualize and optimize the space–time–workforce tradeoff under uncertain project drivers.
    publisherASCE
    titleExploit Social Distancing in Construction Scheduling: Visualize and Optimize Space–Time–Workforce Tradeoff
    typeJournal Paper
    journal volume38
    journal issue4
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0001037
    journal fristpage04022027
    journal lastpage04022027-15
    page15
    treeJournal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian