YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Quantitative Holistic Assessment of Implementing Collaborative Planning Practices

    Source: Journal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 003::page 04022011
    Author:
    Amr Elsayegh
    ,
    Islam H. El-adaway
    DOI: 10.1061/(ASCE)ME.1943-5479.0001032
    Publisher: ASCE
    Abstract: Practices of collaborative planning—as related to novel project delivery methods, information technologies, lean construction, and supply chain practices—can impact the cost and schedule performance of projects in the architectural, engineering, and construction (AEC) industry. However, there is a lack of research providing a quantitative holistic assessment of implementing collaborative planning practices. This paper fills this knowledge gap. Using an interdependent multistep research methodology, the authors (1) analyzed a holistic literature-based list of collaborative planning risks using 46 responses from industry expert surveys; (2) calculated the criticality of these risks and compared the obtained results using Spearman rank correlation; (3) statistically analyzed the impact of these risks—based on a project-based survey that collected data from 65 different projects—using distribution fitting analysis and weighted average calculations; (4) developed a framework for predicting the cost and schedule performance impacts in relation to utilizing collaborative planning in the AEC industry; and (5) mathematically verified the research steps using an extreme condition test and sensitivity analysis, and practically validated the research output utilizing a case study example and the insights of 25 industry experts. Within the context of collaborative planning, this paper highlighted and discussed the top six risks that affect cost and schedule project performance: resistance to change, no early involvement of key project participants, lack of construction coordination, late and ineffective communication, lack of leadership, and absence of flexibility and coordination of design. Ultimately, this study provides a necessary and highly customizable metric for industry practitioners to manage their collaborative planning practices efficiently and improve their project performance.
    • Download: (2.573Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Quantitative Holistic Assessment of Implementing Collaborative Planning Practices

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4281849
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorAmr Elsayegh
    contributor authorIslam H. El-adaway
    date accessioned2022-05-07T19:57:54Z
    date available2022-05-07T19:57:54Z
    date issued2022-02-25
    identifier other(ASCE)ME.1943-5479.0001032.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4281849
    description abstractPractices of collaborative planning—as related to novel project delivery methods, information technologies, lean construction, and supply chain practices—can impact the cost and schedule performance of projects in the architectural, engineering, and construction (AEC) industry. However, there is a lack of research providing a quantitative holistic assessment of implementing collaborative planning practices. This paper fills this knowledge gap. Using an interdependent multistep research methodology, the authors (1) analyzed a holistic literature-based list of collaborative planning risks using 46 responses from industry expert surveys; (2) calculated the criticality of these risks and compared the obtained results using Spearman rank correlation; (3) statistically analyzed the impact of these risks—based on a project-based survey that collected data from 65 different projects—using distribution fitting analysis and weighted average calculations; (4) developed a framework for predicting the cost and schedule performance impacts in relation to utilizing collaborative planning in the AEC industry; and (5) mathematically verified the research steps using an extreme condition test and sensitivity analysis, and practically validated the research output utilizing a case study example and the insights of 25 industry experts. Within the context of collaborative planning, this paper highlighted and discussed the top six risks that affect cost and schedule project performance: resistance to change, no early involvement of key project participants, lack of construction coordination, late and ineffective communication, lack of leadership, and absence of flexibility and coordination of design. Ultimately, this study provides a necessary and highly customizable metric for industry practitioners to manage their collaborative planning practices efficiently and improve their project performance.
    publisherASCE
    titleQuantitative Holistic Assessment of Implementing Collaborative Planning Practices
    typeJournal Paper
    journal volume38
    journal issue3
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0001032
    journal fristpage04022011
    journal lastpage04022011-22
    page22
    treeJournal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian