Critical Risks Inherent to the Transfer Phase of Public–Private Partnership Water Projects in ChinaSource: Journal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 003::page 04022006DOI: 10.1061/(ASCE)ME.1943-5479.0001024Publisher: ASCE
Abstract: Public–private partnership (PPP) infrastructure projects progress through separate phases, with each phase subject to unique risks, thereby requiring a phase-based strategy for managing risks. To date, most research on PPP risk has emphasized phases, with an obvious neglect of the final, transfer phase (TP) of PPP projects, in which the project ownership reverts to government. This study identified and evaluated critical risk categories of the TP, using China’s PPP water sector as the context of analysis. A two-stage approach was adopted, including both qualitative and quantitative research methods. Seven critical transfer risk categories (CTRCs) were identified, namely overhaul risks, contract risks, posttransfer operation risks, residual value risks, political risks, information risks, and succeeding operator risks, of which three are unique to the TP. Expert recommendations were presented for the facilitation of a smooth transfer of water PPPs in China. The findings of this study contribute to the body of knowledge in PPP risk management, and the specialized research approach employed may be utilized in similar exploratory studies.
|
Collections
Show full item record
contributor author | Fengyu Bao | |
contributor author | Igor Martek | |
contributor author | Chuan Chen | |
contributor author | Qihong Wu | |
contributor author | Albert P. C. Chan | |
date accessioned | 2022-05-07T19:57:05Z | |
date available | 2022-05-07T19:57:05Z | |
date issued | 2022-01-31 | |
identifier other | (ASCE)ME.1943-5479.0001024.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4281841 | |
description abstract | Public–private partnership (PPP) infrastructure projects progress through separate phases, with each phase subject to unique risks, thereby requiring a phase-based strategy for managing risks. To date, most research on PPP risk has emphasized phases, with an obvious neglect of the final, transfer phase (TP) of PPP projects, in which the project ownership reverts to government. This study identified and evaluated critical risk categories of the TP, using China’s PPP water sector as the context of analysis. A two-stage approach was adopted, including both qualitative and quantitative research methods. Seven critical transfer risk categories (CTRCs) were identified, namely overhaul risks, contract risks, posttransfer operation risks, residual value risks, political risks, information risks, and succeeding operator risks, of which three are unique to the TP. Expert recommendations were presented for the facilitation of a smooth transfer of water PPPs in China. The findings of this study contribute to the body of knowledge in PPP risk management, and the specialized research approach employed may be utilized in similar exploratory studies. | |
publisher | ASCE | |
title | Critical Risks Inherent to the Transfer Phase of Public–Private Partnership Water Projects in China | |
type | Journal Paper | |
journal volume | 38 | |
journal issue | 3 | |
journal title | Journal of Management in Engineering | |
identifier doi | 10.1061/(ASCE)ME.1943-5479.0001024 | |
journal fristpage | 04022006 | |
journal lastpage | 04022006-10 | |
page | 10 | |
tree | Journal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 003 | |
contenttype | Fulltext |