YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Critical Risks Inherent to the Transfer Phase of Public–Private Partnership Water Projects in China

    Source: Journal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 003::page 04022006
    Author:
    Fengyu Bao
    ,
    Igor Martek
    ,
    Chuan Chen
    ,
    Qihong Wu
    ,
    Albert P. C. Chan
    DOI: 10.1061/(ASCE)ME.1943-5479.0001024
    Publisher: ASCE
    Abstract: Public–private partnership (PPP) infrastructure projects progress through separate phases, with each phase subject to unique risks, thereby requiring a phase-based strategy for managing risks. To date, most research on PPP risk has emphasized phases, with an obvious neglect of the final, transfer phase (TP) of PPP projects, in which the project ownership reverts to government. This study identified and evaluated critical risk categories of the TP, using China’s PPP water sector as the context of analysis. A two-stage approach was adopted, including both qualitative and quantitative research methods. Seven critical transfer risk categories (CTRCs) were identified, namely overhaul risks, contract risks, posttransfer operation risks, residual value risks, political risks, information risks, and succeeding operator risks, of which three are unique to the TP. Expert recommendations were presented for the facilitation of a smooth transfer of water PPPs in China. The findings of this study contribute to the body of knowledge in PPP risk management, and the specialized research approach employed may be utilized in similar exploratory studies.
    • Download: (290.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Critical Risks Inherent to the Transfer Phase of Public–Private Partnership Water Projects in China

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4281841
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorFengyu Bao
    contributor authorIgor Martek
    contributor authorChuan Chen
    contributor authorQihong Wu
    contributor authorAlbert P. C. Chan
    date accessioned2022-05-07T19:57:05Z
    date available2022-05-07T19:57:05Z
    date issued2022-01-31
    identifier other(ASCE)ME.1943-5479.0001024.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4281841
    description abstractPublic–private partnership (PPP) infrastructure projects progress through separate phases, with each phase subject to unique risks, thereby requiring a phase-based strategy for managing risks. To date, most research on PPP risk has emphasized phases, with an obvious neglect of the final, transfer phase (TP) of PPP projects, in which the project ownership reverts to government. This study identified and evaluated critical risk categories of the TP, using China’s PPP water sector as the context of analysis. A two-stage approach was adopted, including both qualitative and quantitative research methods. Seven critical transfer risk categories (CTRCs) were identified, namely overhaul risks, contract risks, posttransfer operation risks, residual value risks, political risks, information risks, and succeeding operator risks, of which three are unique to the TP. Expert recommendations were presented for the facilitation of a smooth transfer of water PPPs in China. The findings of this study contribute to the body of knowledge in PPP risk management, and the specialized research approach employed may be utilized in similar exploratory studies.
    publisherASCE
    titleCritical Risks Inherent to the Transfer Phase of Public–Private Partnership Water Projects in China
    typeJournal Paper
    journal volume38
    journal issue3
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0001024
    journal fristpage04022006
    journal lastpage04022006-10
    page10
    treeJournal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian