YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Managing Digital Integration Routines in Engineering Firms: Cases of Disruptive BIM Cloud Collaboration Protocols

    Source: Journal of Management in Engineering:;2021:;Volume ( 038 ):;issue: 001::page 05021012
    Author:
    Hamid Abdirad
    DOI: 10.1061/(ASCE)ME.1943-5479.0000988
    Publisher: ASCE
    Abstract: The challenge for engineering firms to align with an unprecedented variation of digital integration agendas across projects is a recent phenomenon. The literature has offered only a partial understanding of this challenge due to the episodic focus on the digital delivery of individual projects or the initial adoption of digital practice in firms. Through a longitudinal ethnographic study of an engineering firm, this paper explored how practitioners act upon the surge of custom digital integration agendas across multiple projects. By looking at and beyond a large portfolio of projects that demanded building information modeling (BIM) cloud collaboration, this study found that disparate digital agendas across projects disrupt digital integration routines, and they have knock-on effects that can overreach project boundaries and impact projects portfolios and firm operations. With this evidence, this research spotlights the shifting loci of information integration in practice, wherein custom agendas pressure practitioners to shift the focus of integration from their permanent practice at firms to temporary workflows in projects. By revealing organizational responses to this phenomenon, this paper introduces the concept of genericity–complexity trade-off in digital integration routines to explain how firms generate routines that address integration either with ad hoc responses in projects or with systemized integrative efforts across all constellations of practice.
    • Download: (315.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Managing Digital Integration Routines in Engineering Firms: Cases of Disruptive BIM Cloud Collaboration Protocols

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4281804
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorHamid Abdirad
    date accessioned2022-05-07T19:54:32Z
    date available2022-05-07T19:54:32Z
    date issued2021-09-28
    identifier other(ASCE)ME.1943-5479.0000988.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4281804
    description abstractThe challenge for engineering firms to align with an unprecedented variation of digital integration agendas across projects is a recent phenomenon. The literature has offered only a partial understanding of this challenge due to the episodic focus on the digital delivery of individual projects or the initial adoption of digital practice in firms. Through a longitudinal ethnographic study of an engineering firm, this paper explored how practitioners act upon the surge of custom digital integration agendas across multiple projects. By looking at and beyond a large portfolio of projects that demanded building information modeling (BIM) cloud collaboration, this study found that disparate digital agendas across projects disrupt digital integration routines, and they have knock-on effects that can overreach project boundaries and impact projects portfolios and firm operations. With this evidence, this research spotlights the shifting loci of information integration in practice, wherein custom agendas pressure practitioners to shift the focus of integration from their permanent practice at firms to temporary workflows in projects. By revealing organizational responses to this phenomenon, this paper introduces the concept of genericity–complexity trade-off in digital integration routines to explain how firms generate routines that address integration either with ad hoc responses in projects or with systemized integrative efforts across all constellations of practice.
    publisherASCE
    titleManaging Digital Integration Routines in Engineering Firms: Cases of Disruptive BIM Cloud Collaboration Protocols
    typeJournal Paper
    journal volume38
    journal issue1
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000988
    journal fristpage05021012
    journal lastpage05021012-14
    page14
    treeJournal of Management in Engineering:;2021:;Volume ( 038 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian