YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Administering Change Orders in Highway Projects

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 014 ):;issue: 002::page 05021010
    Author:
    Muaz O. Ahmed
    ,
    Rayan H. Assaad
    ,
    Islam H. El-adaway
    ,
    Emily Echele
    ,
    Kyle Govro
    ,
    John Watson
    DOI: 10.1061/(ASCE)LA.1943-4170.0000528
    Publisher: ASCE
    Abstract: Change orders continue to be one of the main challenges faced by the construction industry. Despite many previous research efforts related to managing change orders in the construction industry, there is still a lack of research that investigates the contractual aspects of change orders for transportation projects. This paper tackles this knowledge gap within the context of Ohio Department of Transportation (ODOT) highway projects. To this end, the authors used an integrated research method comprised of (1) selection and analysis of ODOT case studies; (2) identification of the main change orders aspects that lead to conflicts, claims, and/or disputes in the considered case studies; and (3) analysis of the contractual provisions and procedures related to change orders on ODOT projects. The authors consulted throughout all the research steps with ODOT experts for verification and validation. Through the analysis of 10 ODOT case studies, results show that the major contractual challenges related to change orders on ODOT projects are caused by definition terms and their associated processes, approvals according to the contractual provisions, and approvals in light of the applicable laws. Accordingly, this paper identifies (1) a list of opportunities and risks, and (2) a series of checklist questions. These research outcomes shall help project parties in identifying the contract terms that can lead to improper handling of change orders, and thus facilitate better managing of change orders on ODOT projects. Ultimately, this research adds to the body of knowledge by providing contractual guidelines to facilitate a better administration of the contractual procedures of change orders for a timely and cost-effective execution of highway transportation projects.
    • Download: (2.412Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Administering Change Orders in Highway Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4281773
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorMuaz O. Ahmed
    contributor authorRayan H. Assaad
    contributor authorIslam H. El-adaway
    contributor authorEmily Echele
    contributor authorKyle Govro
    contributor authorJohn Watson
    date accessioned2022-05-07T19:52:59Z
    date available2022-05-07T19:52:59Z
    date issued2021-12-28
    identifier other(ASCE)LA.1943-4170.0000528.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4281773
    description abstractChange orders continue to be one of the main challenges faced by the construction industry. Despite many previous research efforts related to managing change orders in the construction industry, there is still a lack of research that investigates the contractual aspects of change orders for transportation projects. This paper tackles this knowledge gap within the context of Ohio Department of Transportation (ODOT) highway projects. To this end, the authors used an integrated research method comprised of (1) selection and analysis of ODOT case studies; (2) identification of the main change orders aspects that lead to conflicts, claims, and/or disputes in the considered case studies; and (3) analysis of the contractual provisions and procedures related to change orders on ODOT projects. The authors consulted throughout all the research steps with ODOT experts for verification and validation. Through the analysis of 10 ODOT case studies, results show that the major contractual challenges related to change orders on ODOT projects are caused by definition terms and their associated processes, approvals according to the contractual provisions, and approvals in light of the applicable laws. Accordingly, this paper identifies (1) a list of opportunities and risks, and (2) a series of checklist questions. These research outcomes shall help project parties in identifying the contract terms that can lead to improper handling of change orders, and thus facilitate better managing of change orders on ODOT projects. Ultimately, this research adds to the body of knowledge by providing contractual guidelines to facilitate a better administration of the contractual procedures of change orders for a timely and cost-effective execution of highway transportation projects.
    publisherASCE
    titleAdministering Change Orders in Highway Projects
    typeJournal Paper
    journal volume14
    journal issue2
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000528
    journal fristpage05021010
    journal lastpage05021010-18
    page18
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 014 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian