YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Proper Risk Allocation: Force Majeure Clause

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 014 ):;issue: 001::page 04521048
    Author:
    William C. Hennings
    ,
    Sarah A. Abdellatif
    ,
    Awad S. Hanna
    DOI: 10.1061/(ASCE)LA.1943-4170.0000527
    Publisher: ASCE
    Abstract: The negative impact on time and cost of unforeseeable events or circumstances far beyond the control of construction project parties may be a chronic risk on the project, the relationship of the parties, and/or each party’s existence as an entity. Events, such as hurricanes, earthquakes, terrorism, government shutdowns, pandemics, and labor disputes, are often referred to as force majeure, or acts of God. Generally, parties to a contractual agreement negotiate the terms of the contract to allocate the risk and to mitigate impacts related to force majeure events, whether it be a force majeure–type clause to excuse performance or contractual provision identifying responsibilities of each party. Force majeure contract clauses often only provide time relief to delay the performance of contract obligations. In the absence of a force majeure clause, other clauses may allow or disallow recovery of time and money (e.g., no damages for delay or labor strike clauses). Alternatively, in the absence of a force majeure clause, the common law principles of impossibility, impracticability, and frustration may apply and afford a party with relief, including excusing performance of contractual obligations, in whole or in part. The main objective of this paper is to identify the various risks and considerations associated with a force majeure clause and the application of common law principles. Several legal cases and articles were reviewed, examined, and analyzed to best fulfill the objective of this research and identify ways to effectively manage risks when negotiating the allocation of risks in a contractual agreement. The results of this legal research are summarized in a flowchart as a generic guide of the important legal considerations that construction professionals and contracting parties should consider when faced with force majeure.
    • Download: (209.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Proper Risk Allocation: Force Majeure Clause

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4281771
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorWilliam C. Hennings
    contributor authorSarah A. Abdellatif
    contributor authorAwad S. Hanna
    date accessioned2022-05-07T19:52:53Z
    date available2022-05-07T19:52:53Z
    date issued2021-12-03
    identifier other(ASCE)LA.1943-4170.0000527.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4281771
    description abstractThe negative impact on time and cost of unforeseeable events or circumstances far beyond the control of construction project parties may be a chronic risk on the project, the relationship of the parties, and/or each party’s existence as an entity. Events, such as hurricanes, earthquakes, terrorism, government shutdowns, pandemics, and labor disputes, are often referred to as force majeure, or acts of God. Generally, parties to a contractual agreement negotiate the terms of the contract to allocate the risk and to mitigate impacts related to force majeure events, whether it be a force majeure–type clause to excuse performance or contractual provision identifying responsibilities of each party. Force majeure contract clauses often only provide time relief to delay the performance of contract obligations. In the absence of a force majeure clause, other clauses may allow or disallow recovery of time and money (e.g., no damages for delay or labor strike clauses). Alternatively, in the absence of a force majeure clause, the common law principles of impossibility, impracticability, and frustration may apply and afford a party with relief, including excusing performance of contractual obligations, in whole or in part. The main objective of this paper is to identify the various risks and considerations associated with a force majeure clause and the application of common law principles. Several legal cases and articles were reviewed, examined, and analyzed to best fulfill the objective of this research and identify ways to effectively manage risks when negotiating the allocation of risks in a contractual agreement. The results of this legal research are summarized in a flowchart as a generic guide of the important legal considerations that construction professionals and contracting parties should consider when faced with force majeure.
    publisherASCE
    titleProper Risk Allocation: Force Majeure Clause
    typeJournal Paper
    journal volume14
    journal issue1
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000527
    journal fristpage04521048
    journal lastpage04521048-8
    page8
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 014 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian